Loading...
HomeMy WebLinkAboutMSP1.4PhasedParking_11012024BIM FILE PATH: SHEET NO.: TITLE: copyright 2018 SMA, P.C. REVISIONS: KEYMAP: HHEELLEENNAA920 Front Street | Suite 101Helena | MT | 59601P| 406/442.4933www.architects-sma.com ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DDRRAAWWNN BBYY:: CCHHEECCKKEEDD BBYY:: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:BBOOZZEEMMAANN109 East Oak Street | Suite 2EBozeman | MT | 59715P| 406/219.2216 www.architects-sma.com C:\Users\nicoles\Documents\2014 - Bealls Third Master Plan-R20_nicolesYZYN3.rvt 1/24/2021 4:21:53 PMMSP1.4 22001144 0011//2244//2211 PPHHAASSEEDD PPAARRKKIINNGG Author Checker NNOORRTTHH CCEENNTTRRAALL 22001144 MMSSPP NO. DATE REVISION DESCRIPTION N November 10, 2021 | 12 For Phase I there are two existing surface lots on Block 3, along with the 173-stall garage on Block 4, 80 surface stalls at Mountainview East, and 93 stalls at One11 (see Figure 8). Figure 8. Parking Provided Phase I 177 UPDATED OCTOBER 30, 2024 173 November 10, 2021 | 11 On the diagrams below, orange indicates existing parking and blue indicates new parking for that phase. Figure 7 shows the existing buildings and surface parking along with the 186 SID stalls that are associated with the Mountainview site. Figure 7. Existing Conditions November 10, 2021 | 10 Development Phases + Parking Inventory The site diagrams below show the amount and location of parking by phase. Figure 6 shows the blocks and lots associated with North Central. Figure 6. North Central Blocks + Sites November 10, 2021 | 13 Phase II includes Mountainview East and Building 3-4. Mountainview East includes 84 SID and 45 off-street structured parking stalls to accommodate the office, retail, residential, and restaurant uses. Building 3-4 includes 45 off-street below-grade structured stalls. Figure 9. Parking Provided - Phase II 177 44 76SID40SID UPDATED OCTOBER 30, 2024 Phase II includes Mountainview East, Mountainview West, and Building 3-4. Mountain View East and West include 116 SID stalls total to accommodate the hotel, retail, and restaurant uses. Building 3-4 includes 44 off-street below-grade structured stalls. November 10, 2021 | 14 For Phase III, new development includes buildings 3-1, 3-2, and 3-3, with a total of 90 below grade stalls (see Figure 10). Mountainview West is also part of Phase III with a 100-room hotel served by 56 SID parking stalls. Figure 10. Parking Provided – Phase III 177 76SID40SID 44 48 42 45 UPDATED OCTOBER 30, 2024 135 November 10, 2021 | 15 Phase IV includes development of parcel 3-5 along with 60 below-grade structured off-street parking stalls (see Figure 11). Figure 11. Parking Provided – Full Buildout (Phase IV) 177 76SID40SID 44 48 42 45 81 UPDATED OCTOBER 30, 2024 81