HomeMy WebLinkAboutPhasingPlan_110120243 MSP | NORTH CENTRAL PROJECT DESIGN The existing conditions, or Phase 0, is indicated in the plan above. Each design phase, Phases 1-4 are broken down in the following intent narrative and diagrams to better communicate how the application proposes the phased construction and execution of the development proposed at North Central leading up to Final Build out and the completion of Phase 4. The existing structures on the current site, Phase 0, are beyond, or moving beyond their useful life. Demolition of these buildings will be phased to meet in order to satisfy the development program, and the City of Bozeman standards. The demolition of these structures is included in the description of each phase on the following pages. The applicant and design team recognize that all demolition requests will need to be completed in compliance with Sec. 39.340.080-090 Review of demolition or movement of historic structures or Sec. 38.340.100 Demolition or movement of a non-historic structure or site in the NCOD - depending on the historic status of each structure. Additionally, the applicant will comply with all Certificate of Appropriateness (COA) Application standards as required by the City of Bozeman to formally request the demolition of each existing structure to communicate subsequent development intent, prior to the phased plan for new construction. PHASING PLAN PHASED DEMOLITION INTENT ONE 11 (EXISTING) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUEONE 11 (EXISTING) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUE 3 MSP | NORTH CENTRAL PROJECT DESIGN It is anticipated the entire master plan build-out may take 5-7 years, depending on market conditions, and will take place in phases. Based on current projections, we expect the master plan to unfold in the following phasing order. This phasing plan is conceptual and phases could be combined or re-ordered. The only major phasing constraints are the need to replace/expand existing parking in the initial phase, and the desire to maintain the existing Tower Building for some time. All other sequences could be re-ordered. All phases would include the construction of the associated infrastructure and open space necessary for the operation and code conformance of each building. The initial phases would also include integration with the existing site uses. PHASING PLAN PHASING INTENT PHASE 1 PHASE 2 PHASE 2 (CONT.) PHASE 4 BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES(BUILDING 4) BUILDING 3-5 ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAINVIEW WEST)ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUEBLOCK 3, LOT 1A BLOCK 3, LOT 2A BLOCK 3, LOT 3A BLOCK 3, LOT 4A BLOCK A, LOT 2A BLOCK A, LOT 3A BLOCK 3, LOT 5A BLOCK 4, LOT 1A BLOCK B, LOT A1(PROPOSED AGGREGATION) PHASE 1 BLOCK 4LOT 1A32,645 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVETHE IVES(BUILDING 4) ONE 11 2.0 BUILDING NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET ONE 11 (EXISTING) WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) TEMPORARY PARKING LOTFOR AC HOTEL AND MEDICAL ARTS BUILDING PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING& ASSOCIATES WHIBOZEMAN, MONTANAC1.1 PHASE 1CIVIL SITE PLAN PHASE 1 DESCRIPTION ONE 11 2.0 BUILDING · · · · · · · BLOCK 4 BUILDING · · · · · · · · · · DEMOLITION · · · · · BLOCK 4LOT 1A32,645 sf BLOCK 3LOT 1A 24,440 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVETHE IVES (BUILDING 4) BLOCK A, LOT 2A22,445 sf ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAINVIEW WEST)NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) BLOCK A, LOT 3A25,024 sf PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING& ASSOCIATES WHIBOZEMAN, MONTANAC1.2 PHASE 2 CIVIL SITE PLAN PHASE 2 DESCRIPTION BUILDING 3-4 · · · · · · MOUNTAIN VIEW EAST BUILDING · · · · · · · · MOUNTAIN VIEW WEST BUILDING · · · BLOCK 4 LOT 1A32,645 sf BLOCK 3LOT 4A11,812 sf BLOCK 3LOT 3A16,467 sf BLOCK 3LOT 2A 18,042 sf BLOCK 3LOT 1A24,440 sf BLOCK 3LOT 5A25,222 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVEBUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES(BUILDING 4) BUILDING 3-5 BLOCK A, LOT 2A22,445 sf ONE 11 2.0 BUILDING HOTEL WEST (AKA MOUNTAINVIEW WEST)NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) WEST LAMME STREET BLOCK B, LOT 1A (PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) BLOCK A, LOT 3A25,024 sf PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING & ASSOCIATES WHIBOZEMAN, MONTANAC1.4 PHASE 4CIVILSITE PLAN PHASE 4 DESCRIPTION BUILDING 3-5 · · · · PHASE 1 PHASE 4 PHASE 3 PHASE 3 PHASE 2 PHASE 2 PHASE 3 PHASE 2 PHASE 3 BLOCK 4LOT 1A32,645 sf BLOCK 3LOT 4A 11,812 sf BLOCK 3LOT 3A 16,467 sf BLOCK 3 LOT 2A18,042 sf BLOCK 3LOT 1A 24,440 sf BLOCK 3LOT 5A 25,222 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVEBUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES (BUILDING 4) BLOCK A, LOT 2A22,445 sf ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAINVIEW WEST)NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION)53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) BLOCK A, LOT 3A 25,024 sf PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING& ASSOCIATES WHIBOZEMAN, MONTANAC1.3 PHASE 3 CIVIL SITE PLAN PHASE 3 DESCRIPTION BUILDINGS 3-1, 3-2, AND 3,3 · · · · · · BLOCK 4LOT 1A32,645 sf BLOCK 3LOT 1A24,440 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVETHE IVES(BUILDING 4) BLOCK A, LOT 2A 22,445 sf ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAIN VIEW WEST)NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAIN VIEW EAST) WEST LAMME STREET BLOCK B, LOT 1A(PROPOSED AGGREGATION) 53,034 sf (1.217 ac) THE HENRY(BLDG 3-4) BLOCK A, LOT 3A25,024 sf PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING& ASSOCIATES WHIBOZEMAN, MONTANAC1.2 PHASE 2CIVILSITE PLAN PHASE 2 DESCRIPTIONBUILDING 3-4······MOUNTAIN VIEW EAST BUILDING··· · · · · · MOUNTAIN VIEW WEST BUILDING · · · 3 MSP | NORTH CENTRAL PROJECT DESIGN BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES(BUILDING 4) ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAINVIEW WEST)ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUETHE IVES(BUILDING 4) ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAINVIEW WEST)ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUETHE IVES(BUILDING 4) ONE 11 2.0 BUILDING ONE 11 (EXISTING) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUEPHASING PLAN PHASE 1 | PHASE 2 | EXISTING NEW NORTH CENTRAL - PREVIOUSLY CONSTRUCTED BUILDING DEMOLISHED DURING PHASE PHASE 3 | PHASE 4 | BUILDING 3-3 BUILDING 3-2 BUILDING 3-1 THE IVES(BUILDING 4) BUILDING 3-5 ONE 11 2.0 BUILDING HOTEL WEST(AKA MOUNTAINVIEW WEST)ONE 11 (EXISTING) HOTEL EAST(AKA MOUNTAINVIEW EAST) THE HENRY(BLDG 3-4) VILLARD STREET BEALL STREET LAMME STREET TRACY AVENUEGRAND AVENUEWILLSON AVENUEBLOCK 4LOT 1A32,645 sf BLOCK 3LOT 1A11,812 sf BLOCK 3LOT 2A15,987 sf BLOCK 3LOT 3A17,721 sf BLOCK 3LOT 4A25,242 sf BLOCK 3LOT 5A25,221 sf WEST BEALL STREET NORTH TRACY AVEWEST VILLARD STREET NORTH WILLSON AVE14' ALLEYWEST LAMME STREETNORTH GRAND AVEBUILDING 3-3 BUILDING 3-2 BUILDING 3-1 BUILDING 4 BUILDING 3-4BUILDING 3-5 BLOCK B, LOT A-1(PROPOSED AGGREGATION)41,233 sf BLOCK A, LOT 2A19,443 sf BLOCK A, LOT 3A28,026 sf ONE 11 2.0 BUILDING MOUNTAIN VIEWEAST BUILDINGMOUNTAIN VIEWWEST BUILDING NORTH TRACY AVEWEST BEALL STREET NORTH WILLSON AVEWEST VILLARD STREET PROFESSIONALENGINEERS &SURVEYORS NORTH CENTRALMASTER SITE PLANSTAHLYENGINEERING& ASSOCIATES WHIBOZEMAN, MONTANAC1.1.4 PHASE 4CIVILSITE PLAN