HomeMy WebLinkAboutMOD Narrative_11012024
H O M E B A S E PA R T N E R S
North Central
Master Site Plan MOD
Approved SP#21029
MOD #24606
Master Site Plan Mod Narrative
(4) Changes to Approved Plans:
1. Phasing Adjustments: Both Phase 2 and 3 have three buildings now. Mountain
View West moved into Phase 2.
2. Block frontage updated on Mountain View West on Lamme Street.
3. Programming updated on Mountain View East and West Buildings.
4. Update to tree preservation plan on Mountain View lots.
Updates on Individual Drawings/Documents:
· BlockFrontageStandards_11012024 Updated frontage on MVW on Lamme St.
· BuildingDesign_11012024 Updated Building Program Matrix numbers
· MOD Application Signed New signed MOD application
· MOD Narrative_11012024 New document to highlight changes in MOD
· ParkingandMobilityPlan_11012024 Updated parking numbers & data
· PedestrianSafetlyPlan_11012024 Updated on Mountain View lots
· PhasingPlan_11012024 MVW moved to into Phase 2
· SitePlanning&DesignElements_11012024 Updated open space on MV lots
· Traffic Trip Comparison Letter-102224 New letter to reflect updated program on MV lots
· C1.2 – C1.7 Updated MV lots
· L000TreePreservationPlan_11012024 Updated MV lots
· MSP1.0 – MSP1.2 Updated MV lots
· MSP1.3ProgramMatrix_11012024 Updated Building Program Matrix numbers
· MSP1.4PhasedParking_11012024 Updated phasing
· MSP1.5 – MSP1.7 Updated MV lots