HomeMy WebLinkAbout018_L2.1_LandscapeDetailsFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION906 N. ROUSE AVELANDSCAPE DETAILSALTOS PHOTONICSNORTHERN PACIFIC ADD., BLOCK 116, TRACT 24ABOZEMAN, MTL2.1 RPE24141_01_LS_DETAILS.DWGCS10/04/2024SITE PLAN SUBMITTAL12/20/2024-----SITE PLAN SUBMITTAL-------24141.01 SHRUB PLANTING
N.T.S.
NOTES:
1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE REJECTED. CONTAINER
REMOVAL WILL NOT BE AN EXCUSE FOR DAMAGED ROOT BALLS.
2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING, OR OTHER SURFACE.
3.PRUNE OUT ALL DAMAGED OR DEAD WOOD.
4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY. REJECTED MATERIALS TO BE
IMMEDIATELY RETURNED TO SOURCE.
6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS,
CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.
TOP OF ROOT BALL
SHALL BE 1-2" ABOVE
SURROUNDING GRADE
3" DEPTH MULCH, KEEP
MULCH AWAY FROM TRUNK
REMOVE CONTAINER,
LIGHTLY SCARIFY
ROOTS
BACKFILL WITH 75%
NATIVE SOIL, 25%
COMPOST
1
32" LENGTH NON-ABRASIVE RUBBER
TIES
(2)3" DIA LODGE POLE PINE STAKES 1-1/2'
FROM TRUNK. STAKE LOCATION SHALL
NOT INTERFERE WITH PERMANENT
BRANCHES
3" DEPTH MULCH
FINISH GRADE
BOTTOM OF ROOT BALL RESTS
ON EXT OR RECOMPACTED SOIL
EXISTING SOIL
DECIDUOUS TREE
N.T.S.
TOP OF ROOT FLARE 2" ABOVE EXT
GRADE. NO SOIL ON ROOT FLARE
LOOSENED SOIL. DIG AND TURN
THE SOIL TO REDUCE
COMPACTION TO THE AREA TO
DEPTH OF ROOT BALL.
3 X DIA ROOT BALL MINNOTES:
1.REMOVE NURSERY STAKES.
2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING.
3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL.
4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO
NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT
BALL TO SETTLE THE SOIL.
5.BACKFILL WITH AMENDED SOIL.
6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON.
7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS,
CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.
8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION.
2
NOTES:
1.REMOVE SPENT FLOWERS PRIOR TO PLANTING.
2.LOOSEN ROOT MASS AT BOTTOM OF ROOTBALL.
3.STRIP TOP OF ROOTBALL 14" OF SURFACE GROWING MEDIA AND
COVER WITH 14" PLANTING MIX PLUS SURFACE MULCH.
4.QUANTITY AND SPACING AS NOTED IN PLANT SCHEDULE.
SET PLANT AT
ORIGINAL DEPTH
POTTED PLANT
TOPSOIL
EXISTING SOIL
3" DEEP MULCH
KEEP AWAY FROM
CROWN OF PLANT
PERENNIAL/GRASS/GROUNDCOVER PLANTING
N.T.S.3
ROCK MULCH
WEED BARRIER FABRIC
NEW TOPSOIL
EXISTING SUBGRADE18"3"ROCK MULCH
N.T.S.7
ROCK BOULDERS
LOCATED PER PLANS;
DO NOT SCAR OR
DAMAGE
FINISH GRADE
1/3 BOULDER BURIED
BELOW GRADE
BOULDER
N.T.S.5
EQ.EQ.36"9"1'
FINISH GRADE,
RE: CIVIL 36"TREAD DEPTH,
OR 1' FOR RAMP
FINISH GRADE,
RE: CIVIL
5' O.C. MAX
RAI
L
S
L
O
P
E
S
H
A
L
L
MA
T
C
H
S
T
A
I
R
O
R
RA
M
P
S
L
O
P
E
1 1/2" SQUARE TUBE
STEEL
STAIRS OR RAMP, SEE SITE PLAN
CAULK 3/4" DEEP,
COLOR TO MATCH
ADJACENT CONCRETE
CORE DRILL CONCRETE AND FILL WITH
NON-SHRINK GROUT FLUSH WITH
CONCRETE, TYP. 6" EMBED MIN.
TYPICAL HANDRAIL- GROUND MOUNTED
N.T.S.8
N.T.S.
ISOMETRIC VIEW
4" METAL EDGING; TOP OF EDGING
TO BE MAXIMUM OF 12" ABOVE
SURFACE MATERIAL
COMPACT GRADES ADJACENT
TO EDGING TO AVOID
SETTLING
12" STAKES TO LOCK INTO
PREFORMED LOOPS ON THE EDGING
STAKES
EDGING
N.T.S.6
1/2 (X)
(X) PLANT SPACING PER
PLAN
(X) PLANT SPACING PER
PLAN
PERENNIAL/GRASS/GROUNDCOVER SPACING
N.T.S.4
4' MAX
VARIES (SEE PLAN)12"3'5
4
3
2
1
1
2
4 3
12"
12"
12"3'VARIES (SEE PLAN)
4' MAX
12"
1
2
4 34" MAX12"
12"
12"
5' MIN
5
4" MAXHANDRAIL:1 1/2" SQUARE
TUBE, GRIND ALL SURFACES
SMOOTH. HANDRAIL SHALL
HAVE 1.5" MIN. CLEARANCE
FROM WALL.
PROVIDE 1-1/2" SCHD 80
SUPPORT POSTS AT 4' O.C.
MAX., (CONTRACTOR TO
FIELD VERIFY EXISTING
CONDITIONS.) POST
SHOULD BE SPACED
EQUALLY ALONG LENGTH
OF RAMP.
CONCRETE WALK SEE CIVIL
EMBED RAIL POSTS MIN
12" SET IN CONC. HOLES
WITH NON-SHRINK
GROUT.
INTERMEDIATE LANDING
(IF REQ'D)
NOTES:
1.COORDINATE STRUCTURAL REBAR WITH CORE
DRILL LOCATIONS FOR POSTS.
2.ALL HANDRAILS TO BE POWDER COATED
BLACK.
3.PROVIDE SHOP DRAWING FOR REVIEW AND
APPROVAL PRIOR TO MANUFACTURING.
TYPICAL RAMP DETAIL
N.T.S.
1
2 2
9