HomeMy WebLinkAbout025 - L001 - Notes and Code RequirementsLANDSCAPE INSTALL NOTESGENERAL1.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TOBEGINNING WORK. CALL 811.2.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT. LANDSCAPEARCHITECT TO BE NOTIFIED 48 HOURS IN ADVANCE.3.PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48HOURS IN ADVANCE.4.THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITE WITH THELANDSCAPE ARCHITECT, WHEN APPLICABLE.5.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.5.1.ALL DECIDUOUS TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO BE FENCED FORMIN. 2 YEARS5.2.ALL TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE 3' DIAMETER MULCH RING.5.3.ALL TREES TO BE STAKED FOR MIN. 2 YEARS.6.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 ORTROY@DESIGN5LA.COM.8.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINEDINTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.9.ALL EDGING SHALL BE 316" X 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FORCURVED RUNS (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN A MINIMUM OF18" DEEP.10.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARETO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREASIN FIELD. CONTRACTOR IS RESPONSIBLE FOR THE COST OF RESTORING ANY DISTURBANCE OUTSIDE OFTHE AGREED UPON LIMIT OF WORK BOUNDARY INDICATED ON THE PLANS.11.VERIFY ALL CUSTOM SEED MIXES. THOSE PROCURED THROUGH WILD HARVEST METHODS (WIND RIVERSEED, BLAKE NURSERY, BIG SKY SEED, GREAT BASIN SEED) REQUIRE ORDERING A MINIMUM OF ONE YEARIN ADVANCE OF INSTALLATION OR OTHER AS SPECIFIED BY SEED PROVIDER.12.ALL ROCK MULCH IS TO BE WASHED PRIOR TO INSTALLATIONSITE SOIL PREP13.A SOIL ANALYSIS MUST BE CONDUCTED BY AND INDEPENDENT, STATE OPERATED OR UNIVERSY -OPERATED SOIL LAB WITH THE CAPABILITY ADN EXPERIENCE TO CONDUCT THE REQUIRED TESTING.THESOIL TEST SHALL BE DATED NO MORE THAN 60 DAYS PRIOR TO PRE-INSTALLATION MEETING AND MUST BEPROVIDED TO REVIEW AUTHORITY AT THE PRE-INSTALLATION MEETING.14.SOIL SAMPLES MUST REPRESENT A UNIFORM AREA. RECOMMENDED RATE SHOULD BE 1 SAMPLE PER 5,000SF OF LANDSCAPED AREA15.SOIL ANALYSIS MUST TEST THE FOLLOWING:15.0.1.SOIL TEXTURE15.0.2.PERCENTAGE OF ORGANIC MATTER15.0.3.SOIL REDUCTION (ACIDITY/ALKALINITY pH VALUE)15.0.4.SOLUBLE-SALT CONTENT15.0.5.NUTRIENTS: INCLUDING NITROGEN, PHOSPHORUS, POTASSIUM, ZINC, IRON, COPPER,MANGANESE, AND LIME.16.PER THE SOIL ANALYSIS, VERIFY THE SOIL REMEDIATION METHOD WITH LANDSCAPE ARCHITECT17.ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 2" DIAMETER,STICKS, ROOTS, ALL CONSTRUCTION DEBRIS AND ALL OTHER EXTRANEOUS MATTER TO BE PICKED UP ANDREMOVED FROM SITE BEFORE SOIL AMENDMENTS ARE ADDED.18.EXISTING SOIL AREA NOT TO BE DISTURBED SHALL BE PROTECTED FROM COMPACTION, DISTURBANCEAND CONTAMINATION DURING CONSTRUCTION.19.SEED AREAS(WHEN APPLICABLE)- LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.-SEEDED AREA AMENDED TOPSOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINED SETTLEDDEPTH OF 6"). HYDRO-SEED WITH *FLEXTERRA TACKIFIER*. ADD EROSION CONTROL MAT TO ALLDISTURBED AREAS TO BE SEEDED PER MANUFACTURER'S SPECIFICATION.20. SOD AREAS(WHEN APPLICABLE) - LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.-SOD AREA AMENDED SOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINED SETTLED DEPTH OF6"). TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY PRIORTO LAYING SOD. RAKE SMOOTH TO MATCH FINAL GRADING PLAN.21. ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOM TO REMOVE GLAZING.22. ALL PLANTING BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOST WITH MIN. 17" NEW TOPSOIL (COMBINED SETTLED DEPTH OF 18"). RAKE SMOOTH TO MATCH FINAL GRADING PLAN.23. DO NOT SCARIFY IF SOIL IS FROZEN, MUDDY OR EXCESSIVELY WET.IRRIGATION24. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. MAIN LINE, LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECT COMPLETION WILL NOT BE ACCEPTED.25. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES.26. SEE L600s FOR ADDITIONAL IRRIGATION NOTES AND PLANS.BOZEMAN, MONTANA CODE OF ORDINANCESCANOPY HOTELSITE INFORMATIONACRES: 0.89 ACRESZONING: B-3 (DOWNTOWN DISTRICT)LANDSCAPE APPROVAL PATHWAY: PRESCRIPTIVETOTAL LANDSCAPE AREA: SEE LANDSCAPE COVERAGE PLAN L003TREE REQUIREMENTS:REQUIRED: 75% OR GREATER OF THE PROPOSED TREES MUST BE DROUGHTTOLERANT SPECIES.PROVIDED: 100% OF THE PROPOSED TREES ARE DROUGHT TOLERANT PERTHE MONTANA PLANT AND NURSERY ASSOCIATION AND CITY OF BOZEMANPLANT LIST. SEE SHEET L002 FOR PLANT SCHEDULES THAT IDENTIFY ALLPROPOSED DROUGHT TOLERANT TREES.STREET TREE REQUIREMENTSREQUIRED: ONE LARGE CANOPY TREE FOR EACH 50 FEET OF TOTAL STREETFRONTAGE ROUNDED TO THE NEAREST WHOLE NUMBER.STREET FRONTAGE FOR E BABCOCK ST: 299 LF = 6 TREESSTREET FRONTAGE FOR S ROUSE AVE: 133 LF = 3 TREESPROVIDED:-7 TREES FOR E BABCOCK ST-2 TREES FOR S ROUSE AVE. DUE TO SITE TRIANGLES AND WET UTILITIESLIMITED SPACE IS AVAILABLE FOR THE REQUIRED TREES ON ROUSE. WEHAVE PROVIDED AN EXTRA TREE ON BABCOCK FRONTAGE.SITE TREE REQUIREMENTSREQUIRED: ONE (1) TREE PER 1600SF OF LANDSCAPED AREA.PROVIDED: ALL LANDSCAPE AREA FALLS WITHIN 10FT OF BUILDING OR IS LESSTHAN 6' IN WIDTH, THEREFORE NO SITE TREES ARE REQUIRED OR HAVE BEENPROVIDED.BIKE PARKING:-REQUIRED: MINIMUM OF 10% BIKE PARKING TO BE PROVIDED FORAMOUNT OF REQUIRED VEHICLE PARKING STALLS PRIOR TOREDUCTIONS: 241 VEHICLE SPACES; 24 BIKE PARKING SPACESPROVIDED:-24 OUTDOOR BICYCLE PARKING SPACESSERVICE ENCLOSURES LANDSCAPINGREQUIRED & PROVIDED: LANDSCAPE SCREENING AT LEAST 5 FEET IN WIDTH ISPROVIDED.UTILITY METERS LANDSCAPING-REQUIRED AND PROVIDED: IF SUCH ELEMENTS ARE MOUNTED IN ALOCATION VISIBLE FROM THE STREET, PEDESTRIAN PATHWAY, SHAREDOPEN SPACE, OR SHARED AUTO COURTYARDS, THEY MUST BESCREENED WITH VEGETATION AND / OR INTEGRATED INTO THEBUILDING'S ARCHITECTURESOIL AMENDMENT REQUIREMENTS:A.AMEND EXISTING TOPSOIL AT A RATE OF 4CY/1000SF. COMPOST MUSTMEET THE STATE OF MONTANA'S COMPOST REQUIREMENT FOR SOILAMENDMENT AND SHALL BE SPREAD AND MIXED EVENLY INTO THE TOPSIX (6) INCHES OF SOIL;B.PERFORM A SOIL TEST AND AMEND EXISTING SOIL AS RECOMMENDEDBY SOIL TEST; ORC.IMPORT TOPSOIL THAT HAS BEEN AMENDED PURSUANT TO THERECOMMENDATIONS OF A SOIL TEST.PROVIDED: (A) AMEND EXISTING TOPSOIL AT A RATE OF 4CY/1000SF.Notes and CodeRequirementsL 001design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\canopy hotel bozeman\autocad\01_sheets\blocka-canopyhotel_d5_landscape.dwg
Canopy Hotel
Bozeman, Montana
KHM/HU TMS
05/17/24SD07/19/24SPR10/04/24SPR RC112/20/24SPR RC2