HomeMy WebLinkAbout013 - Appendix J - Floodplain Design Narrative
MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA
406.586.0277
tdhengineering.com
234 East Babcock Street
Suite 3
Bozeman, MT 59715
July 19, 2024
RE: CANOPY HOTEL BOZEMAN
FLOODPLAIN DEVELOPMENT STRATEGY NARRATIVE
The following narrative is intended to summarize how the Canopy Hotel Bozeman project
intends to follow the City’s floodplain development regulations for a non-residential building
to be located within portions of the 100-yr regulatory floodplain.
A new commercial hotel building is proposed at the northeast corner of S. Rouse Avenue
and E. Babcock Street. The existing building at the site will be demolished and the
proposed building will encroach upon the 100-yr floodplain fringe of Bozeman Creek with
outdoor sidewalk and streetscape improvements proposed within the regulatory floodway
boundary.
The property was surveyed by TD&H Engineering in July 2023 and a site-specific
delineation was completed in accordance with BMC 38.600.130 to determine where the
base flood elevation intersects natural ground at the site (see attached floodplain exhibit).
The west end of the proposed building will encroach on both the georeferenced and
delineated flood fringe boundary where it will extend to the Rouse and Babcock Street
frontages. No building elements will encroach into the regulatory floodway. T he upstream
corner of the building at the corner of Babcock and Rouse was used to determine a project
BFE = 4814.3 (See attached BFE calculations).
The main floor of the building, including the entrances, will be elevated on a concrete
foundation to an elevation of 4816.5 (2.2 feet above the BFE). Areas around the building
will be stabilized with hardscape and landscaping elements with finished grade elevations
nearly at or below the existing ground surface to connect with the adjacent street curbs and
alley to the north. Basement parking level floors will be located below the base flood
elevation and will be floodproofed and designed in accordance with FEMAs NFIP Technical
Bulletin 6 - Requirements for Dry Floodproofed Below-Grade Parking Areas Under Non-
Residential and Mixed-Use Buildings. The entry to the parking garage will be located near
the east end of the building, outside of the 100-yr floodplain boundary, and the threshold
will be set just above the BFE at 4814.35. The basement parking garage entry will also
have a removable water-tight barrier designed to be protective to 2-feet above the BFE.
The attached floodplain exhibit shows the locations of these proposed flood protection
design elements for the new building.
Mechanical/electrical equipment and plumbing fixture installations will follow current
building codes and will either be elevated to 2-feet minimum above the BFE in the main
part of the building or will be designed per floodproofing standards and/or FEMA/NFIP
Technical Bulletin 6 in the lower parking garage levels. Elevator equipment will follow the
current building code including applicable ASCE 24 standards for Flood Resistant Design
July 19, 2024 PAGE NO. 2
tdhengineering.com
and Construction. Gas and electric services will enter the building from the alley to the
northeast with connection points and meters located outside of the floodplain boundary. All
incoming service equipment will also be located 2-feet minimum above the BFE.
A complete plan set for the project is currently being submitted for Site Plan review. It is
understood that a Floodplain Development Permit application will need to be submitted and
approved prior to final site plan approval, with the subsequent building permit application
being required to address the detailed code compliance elements for the building’s
mechanical, electrical, and plumbing systems. In the meantime, the attached technical
information is intended to demonstrate the project’s floodplain development strategy
approach and compliance with the City’s floodplain regulations for this type of project.
Please let me know if you have any questions or require additional information.
Sincerely,
Cody Croskey PE
Civil Engineer
TD&H ENGINEERING
Attachments
• Floodplain Regulation Compliance Summary
• BFE Calculations
• Project Floodplain Exhibit
J:\2023\B23-017 32 South Rouse\05_DESIGN (TECH & REPORTS)\FLOODPLAIN\SP FLOODPLAIN NARRATIVE\00 FLOODPLAIN
NARRATIVE.DOC
BOZEMAN, GREAT FALLS, KALISPELL & SHELBY, MT | SPOKANE, WA | LEWISTON, ID | WATFORD CITY, ND | MEDIA, PA
406.586.0277
tdhengineering.com
234 East Babcock Street
Suite 3
Bozeman, MT 59715
MEMORANDUM
Date: July 19, 2024 TDH Job No.: B23-017
To: Brian Heaston, PE - City of Bozeman Engineering Department
From: Cody Croskey, PE
Subject: Canopy Hotel Bozeman
Floodplain Regulation Compliance Summary
Introduction
The following summary is provided to demonstrate project conformance with applicable
sections of the City of Bozeman Floodplain Regulations (BMC 38.600) for a new multi-story
hotel building with basement parking garage and associated site improvements proposed at
the northeast corner of S. Rouse Avenue and E. Babcock Street adjacent to Bozeman
Creek.
BMC 38.600.180 – Floodplain Permit Application Requirements
A floodplain permit application will be submitted as part of the site plan application process
that will incorporate all of the applicable information as required by BMC 38.600.180. It is
understood that a complete floodplain permit application must be submitted and approved
prior to final site plan approval for the project.
BMC 38.600.260 – Requirements for Permitted Uses in the Floodway
The following items are being addressed for proposed sidewalk and plaza improvements
within the Floodway:
A. The portion of development proposed in the floodway consists of replacing
streetscape elements (i.e., sidewalk and landscape beds) that will meet city and
downtown district development standards and be reviewed as part of the Site Plan
application process.
B. All improvements within the floodway will consist of streetscape improvements
intended to match or lower the existing grade while meeting current ADA standards.
Therefore, it is not anticipated that the floodplain conveyance capacity will be
appreciably altered or restricted in any way. The improvements will consist of
permanent hardscape and landscaping that will not dislodge or adversely affect
other properties.
C. A floodway encroachment analysis will be provided with the floodplain permit
application materials demonstrating there is no reduction of the carrying capacity of
the floodway. It is anticipated that a simplified no-rise analysis will be acceptable for
project given the nature of streetscape replacement as provided in subsection C.1.a
of this section.
tdhengineering.com
PAGE NO. 2 JULY 19, 2024
BMC 38.600.270.D – Requirements for New Buildings Permitted in the Flood Fringe
The following items are being addressed for the proposed new non-residential building
within the Flood Fringe:
1. The project will follow building codes and be subject to building permit review.
2. The project will be reviewed through the Site Plan application process to confirm
consistency with zoning and community growth policy.
3. The main occupiable floors of building will be elevated on a permanent concrete
foundation to be 2’ min. above the BFE. The lower basement parking garage levels
will be structurally engineered to resist flood forces and will follow FEMA/NFIP
Technical Bulletin 6 - Requirements for Dry Floodproofed Below-Grade Parking
Areas Under Non-Residential and Mixed-Use Buildings.
4. Surface drainage will be provided with new hardscape and landscaping around the
building.
5. Concrete foundation walls and stairs/ramps will be the only exterior building
elements exposed at elevations below the flood protection level (2’ above the BFE).
Interior occupiable floors and surfaces will be elevated 2’ min. above the BFE.
Lower parking garage floors will be dry-floodproofed and constructed using water
resistant materials and finishes.
6. The occupiable floors of this non-residential building will be elevated per D.6.a.
7. n/a – no manufactured homes
8. All occupiable floors of the building will be elevated 2’ min above the BFE on a
concrete foundation in accordance with subsection D.6.a above. The lower parking
levels will be dry-floodproofed and designed in accordance with FEMA/NFIP
Technical Bulletin 6.
9. n/a – no appurtenant or accessory buildings
10. n/a – no crawlspaces
11. The basement parking garage will be dry-floodproofed to 2’ min above the BFE per
BMC 38.600.270.D.8 and designed in accordance with FEMA/NFIP Technical
Bulletin 6.
12. Electrical systems will be designed by a professional engineer to meet building
codes including applicable flood hazard area provisions, and the following additional
requirements, subject to building permit review. The elevator electrical equipment
will also follow the current building code including applicable ASCE 24 standards for
Flood Resistant Design and Construction.
a. All incoming power service equipment including all transformers, metering
equipment, controls, panels, and all other stationary equipment will be
located at least 2’ above the BFE.
b. Portable and movable electrical equipment may be placed below the base
flood elevation, provided that the equipment can be disconnected by a single
plug and socket assembly of the submersible type.
c. The main power service will enter the building from the alley to the northeast
with manually operated electrical disconnect equipment located at an
accessible location outside of the flood hazard area.
tdhengineering.com
PAGE NO. 3 JULY 19, 2024
d. All electrical wiring systems installed below the base flood elevation will be
suitable for continuous submergence and may not contain fibrous
components.
13. Mechanical systems will be designed by a professional engineer to meet building
codes including applicable flood hazard area provisions, and the following additional
requirements, subject to building permit review. The elevator mechanical equipment
will also follow the current building code including applicable ASCE 24 standards for
Flood Resistant Design and Construction.
a. Float operated automatic control valves will be installed so that fuel supply is
automatically shut off when flood waters reach the floor level where
mechanical systems are located.
b. Manually operated gate valves will be installed on gas supply lines. The main
gas service will enter the building from the alley to the northeast at an
accessible location above the BFE and outside of the flood hazard area.
c. Electrical components of the HVAC systems will meet the requirements of
subsection D.12 above.
d. Furnaces, cooling units, and all associated ductwork will be installed at least
two feet above the base flood elevation.
14. Plumbing systems will be designed by a professional engineer to meet building
codes including applicable flood hazard area provisions, and the following additional
requirements, subject to building permit review.
a. The new building sewer service will include a backwater valve.
b. All toilets, stools, sinks, urinals, vaults, and drains will be located so the
lowest point of possible flood water entry is at least two feet above the base
flood elevation.
J:\2023\B23-017 32 South Rouse\05_DESIGN (Tech & Reports)\FLOODPLAIN\SP FLOODPLAIN NARRATIVE\01 FLOODPLAIN REG COMPLIANCE MEMO.DOC
Community Name
*BELGRADE, CITY OF
Community Number
300105
BOZEMAN, CITY OF 300028
GALLATIN COUNTY
UNINCORPORATED AREAS 300027
*MANHATTAN, TOWN OF 300034
THREE FORKS, CITY OF 300029
*WEST YELLOWSTONE, TOWN OF 300135
GALLATIN COUNTY,
MONTANA
AND INCORPORATED AREAS VOLUME 1 OF 4
Gallatin County
*NON-FLOOD PRONE COMMUNITY
XXXXXXXXXX xx XXX
Federal Emergency Management Agency
Flood Insurance Study Number30031CV001B
REVISED PRELIMINARY DATE:
April XX, 2020
REVISED PRELIMINARY DATE:May XX, 2020
REVISED PRELIMINARY DATE:May 20, 2020
192P193P
74'125.1'
BFE = 4814.3
SECTION MEAN WIDTH AREA VELOCITY (FEET) (SQUARE (FEET PER FEET) SECOND)A 245 53 51 5.6 4,802.5 4,802.54,802.80.3B 417 64 54 5.2 4,805.0 4,805.04,805.30.3C 5636053 5.4 4,808.5 4,808.54,808.60.1D 713 53 50 5.6 4,811.8 4,811.84,811.90.1E 983 66 64 5.5 4,813.4 4,813.44,813.60.2F 1,182 64 62 5.7 4,815.3 4,815.34,815.30.0G1,242 65635.7 4,816.1 4,816.14,816.10.0 1Feet above confluence with Bozeman CreekCROSS SECTIONDISTANCE1FLOODING SOURCE FLOODWAYBASE FLOOD WATER SURFACE ELEVATION(FEET NAVD 88)REGULATORYWITHOUT FLOODWAYWITH FLOODWAYINCREASETABLE 8 FEDERAL EMERGENCY MANAGEMENT AGENCY GALLATIN COUNTY, MT AND INCORPORATED AREASFLOODWAY DATAROUSE AVENUE DOWNTOWN114
Map Title
City ofBozeman,Montana,Maxar,Microsoft
Legend
FEMA Floodplain Layers
Profile Baselines
FIRM Panels
Cross Sections
Flood Hazard Zones
0.2% Annual Chance
Flood Hazard
0.2% Annual Chance
Flood Hazard
Regulatory Floodway
Regulatory Floodway
City Limits
Parcels
Notes
This product is for informational purposes and may not havebeen prepared for, or be suitable for legal, engineering, or
surveying purposes. Users of this information should review or
consult the primary data and information sources to ascertainthe usability of the information.
0 50 100
ftDate: 7/3/2024
Project Location
BFE Location
REVISIONSHEETB23-017 FLOODPLAIN EXHIBITREV DATE
Engineering
234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715
406.586.0277 • tdhengineering.comDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:.DWGCANOPY HOTEL BOZEMAN
BOZEMAN, MONTANA
FLOODPLAIN EXHIBIT
B23-01707.19.2024CJCBASBASEX-1NOTES