Loading...
HomeMy WebLinkAbout01-23-25 - Urban Parks and Forestry Board - Agendas & Packet MaterialsA. Call to Order - 6:00 PM B. Disclosures C. Changes to the Agenda D. Public Service Announcements E. Approval of Minutes E.1 Approve Minutes from October 24, 2024 Urban Parks and Forestry Board Meeting (Stoerger) F. Consent Items G. Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the Board THE URBAN PARKS & FORESTRY BOARD OF BOZEMAN, MONTANA UPF AGENDA Thursday, January 23, 2025 General information about the Urban Parks & Forestry Board can be found in our Laserfiche repository. If you are interested in commenting in writing on items on the agenda please send an email to comments@bozeman.net or by visiting the Public Comment Page prior to 12:00pm on the day of the meeting. At the direction of the City Commission, anonymous public comments are not distributed to the Board or staff. Public comments will also be accepted in-person and through Video Conference during the appropriate agenda items. As always, the meeting will be streamed through the Commission's video page and available in the City on cable channel 190. For more information please contact Mitch Overton, moverton@bozeman.net This meeting will be held both in-person and also using an online videoconferencing system. You can join this meeting: Via Video Conference: Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting. Via Phone: This is for listening only if you cannot watch the stream, channel 190, or attend in- person United States Toll +1 346 248 7799 Access code: 934 5616 9186 Approve Minutes from October 24, 2024 Urban Parks and Forestry Board Meeting. 1 H. Special Presentations I. Action Items J. FYI/Discussion J.1 Park Land Trust Community Grant Program (Jadin) J.2 Capital Budget Review(Mitch Overton) J.3 MTRPA Conference Update(Mitch Overton) J.4 UDC Process Update(Mitch Overton) J.5 Commission Priorities Review(Mitch Overton) J.6 Arbor Day 2025 Discussion (Mitch Overton) K. Adjournment This is the time to comment on any non-agenda matter falling within the scope of the Urban Parks & Forestry Board. There will also be time in conjunction with each agenda item for public comment relating to that item but you may only speak once per topic. Please note, the Board cannot take action on any item which does not appear on the agenda. All persons addressing the Board shall speak in a civil and courteous manner and members of the audience shall be respectful of others. Please state your name, and state whether you are a resident of the city or a property owner within the city in an audible tone of voice for the record and limit your comments to three minutes. General public comments to the Board can be found on their Laserfiche repository page. This board generally meets the fourth Thursday of the month from 6:00 pm to 8:00 pm. Citizen Advisory Board meetings are open to all members of the public. If you have a disability that requires assistance, please contact our ADA Coordinator, David Arnado, at 406.582.3232. 2 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Jess Laughlin, Administrative Assistant II Michael Stoerger, Administrative Assistant II Mitch Overton, Parks and Recreation Director SUBJECT:Approve Minutes from October 24, 2024 Urban Parks and Forestry Board Meeting MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Minutes RECOMMENDATION:Approve Minutes from October 24, 2024 Urban Parks and Forestry Board Meeting. STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of an interconnected system of parks, trails and open spaces. BACKGROUND:In accordance with Commission Resolution 5323 and the City of Bozeman's Citizen Advisory Board Manual, all Boards must have minutes taken and approved. Prepared minutes will be provided for approval by the board at the next scheduled meeting. Staff will make any corrections identified to the minutes before submitting them to the City Clerk's Office. UNRESOLVED ISSUES:As suggested by the UPF Board. ALTERNATIVES:As suggested by the UPF Board. FISCAL EFFECTS:None Attachments: UPF Board Mtg Minutes 10_24_24.pdf Report compiled on: November 8, 2024 3 Urban Parks & Forestry Board Meeting, 10-24-2024] Page 1 of 2 THE URBAN PARKS & FORESTRY BOARD MEETING OF BOZEMAN, MONTANA MINUTES October 24, 2024 Present: Dan Fenn, Alice Stanley, Madisynn Weber, Teri Lumsden, Brandt Berube Absent: None Excused: Donald Ulrich A) 00:03:08 Call to Order - 6:00 PM B) 00:03:31 Disclosures Terri Lumsden disclosed that she owns a home in the west winds subdivision that is part of the cattail creek corridor. C) 00:03:53 Changes to the Agenda D) 00:03:58 Public Service Announcements E) 00:04:05 Approval of Minutes E.1 Approve Minutes from September 26, 2024 Urban Parks and Forestry Board Meeting Urban Parks and Forestry Board Meeting 9-26-24.pdf -00:00:01 Motion to approve Approve Minutes from September 26, 2024 Urban Parks and Forestry Board Meeting Alice Stanley: Motion Brandt Berube: 2nd F) 00:04:50 Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the Board 4 Urban Parks & Forestry Board Meeting, 10-24-2024] Page 2 of 2 G) 00:05:05 FYI/Discussion G.1 00:05:09 Sunset Hills Cemetery Update G.2 00:12:56 Cattail Creek Corridor Park and Anchor Route Master Plan - Engagement Plan Discussion Cattail-Creek-Stakeholder-Meeting-Materials.pdf Disclosure- Addi Jadin disclosed that she lives in West Winds subdivision Cattail-Creek-Corridor_SOW.docx H) 01:27:50 Adjournment 5 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Addi Jadin, Park Planning and Development Manager SUBJECT:Park Land Trust Community Grant Program MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Policy Discussion RECOMMENDATION:Park Land Trust Community Grant Program STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of an interconnected system of parks, trails and open spaces. BACKGROUND:The Park Land Trust is funded primarily through Cash-in-lieu of Parkland (CILP) payments made in association with subdivision and site plan development applications. CILP funds have been used for a handful of community grants over 20 years including partnerships with homeowners' associations for small neighborhood park improvements, land acquisition with Gallatin Valley Land Trust, and investment in snow-making with Bridger Ski Foundation. Applications have been received on a rolling basis with limited public outreach. In addition, the Park Improvement Grant funded through the General Fund has been used with longtime community partners providing matching funds. The intent is to relaunch the program with more structure around application periods, grant periods and conditions, and to align it with the 2023 Parks, Recreation and Active Transportation Plan (PRAT Plan) in terms of its goals and its strategic action to center park equity through Parks and Recreation Department procedures. Information about the Cash-in-lieu of Parkland funding source and its use can be found in Montana State Law the Bozeman Unified Development Code and the Bozeman CILP Resolution. The grant application and information will be posted on a Parks Division grants webpage upon approval )(www.bozeman.net/departments/parks- and-recreation/parks/community-grant-program) UNRESOLVED ISSUES:NA. ALTERNATIVES:NA. 6 FISCAL EFFECTS:$220K in FY25 budget for Community Grant Program Attachments: 2025-Community-Grant-Program.DRAFT_Version2.docx Community-Grant-Program- Application.DRAFT_Version1.docx Report compiled on: September 20, 2024 7 INSERT ONTO PARKS LETTERHEAD Community Grant Program Purpose The City of Bozeman Parks Division is accep?ng grant applica?ons for development, acquisi?on and/or maintenance projects within parks or recrea?onal areas within the City of Bozeman. The purposes of the grants are to: Advance the goals of the 2023 Comprehensive Parks, Recrea?on and Ac?ve Transporta?on Plan (PRAT Plan or Plan) Enhance exis?ng local public, private and nonprofit partnerships and seek out new ones to compliment the Parks Division’s priori?es. Engage the community through crea?ve projects in parks. Incen?vize projects that will posi?vely benefit underrepresented communi?es. Incen?vize projects in areas of the City with rela?vely lower access to parkland Funding Amounts and Project Timelines The program has $220,000 to be distributed to eligible projects this award cycle. Within that funding limit, there is no maximum grant request; however, amounts available vary depending on the area of the City/which park they are proposed for. Applicants are advised to discuss the best loca?on for their proposal with the project manager (see Applica?on Steps). Project Themes and Strategies Grants will be accepted under 4 different themes that align with the PRAT Plan goals described below. Addi?onally, under each theme, there are specific strategies from the PRAT Plan that should be used to create grant proposals. Applicants need only address those strategies that are per?nent to their specific proposal’s theme area/areas. See Appendix A for poten?al project ideas. THEME 1: WELCOMING, EQUITABLE ACCESS Build on Bozeman’s unique strengths while crea?ng WELCOMING, EQUITABLE ACCESS to all spaces and programs. Theme 1 Strategies Create a consistent set of basic elements across neighborhoods. Maintain the current level of parkland per resident (17 acres per 1000) by growing park acres as the community grows. Balance the needs of different park users. Support all-season recrea?on. Increase safe evening / night-?me access at designated facili?es with appropriate ligh?ng, management, and programming. Design parks that reflect their unique neighborhoods and reflect the Department’s brand. 8 INSERT ONTO PARKS LETTERHEAD THEME 2: PROGRAMS, PLACES AND PARTNERSHIPS Strengthen PROGRAMS, PLACES, AND PARTNERSHIPS to meet changing community needs. Theme 2 Strategies Invest in distributed community recrea?on hubs across the City. Create elements that respond to community needs, especially for underserved demographic groups. THEME 3: PEDESTRIAN AND BICYCLE FACILITIES Connect Bozeman’s community with safe and enjoyable PEDESTRIAN AND BICYCLE FACILITIES Theme 3 Strategies Invest in a city-wide ac?ve transporta?on network. Develop the network of Anchor Routes that serve as key travel corridors. Close exis?ng gaps in the pedestrian + bicycle network. Improve east-west connec?ons. Improve crossings that act as major barriers for pedestrians and bicyclists. Install path improvements along ac?ve transporta?on routes. Include Bozeman’s linear parks and watercourse corridors as part of the ac?ve transporta?on network. Ensure inclusive and equitable access to and within parks. THEME 4: NATURAL RESOURCES Steward and sustain NATURAL RESOURCES across the parks and trails system. Theme 4 Strategies Create and u?lize new design standards and management prac?ces appropriate to each park type and its unique landscape. Demonstrate sustainable trail and park building. Advance the protec?on and enhancement of natural resource areas and trees, especially sensi?ve lands. Expand nature play and programming. Implement low-impact design and management prac?ces in park and facility capital projects. 9 INSERT ONTO PARKS LETTERHEAD Primary Review Criteria and Scoring Grants will be rated using the following review criteria. Criteria 1-3 will be reviewed and scored by City staff. Staff scores will be presented to the Urban Parks and Forestry Board along with the applica?ons. Criteria 4-6 will be scored by the Urban Parks and Forestry Board (UPFB) Members. 1.Grant applica?on addresses at least one theme area (grants scoring a zero in this category will not be forwarded to UPFB). Possible points: 5 2. Feasibility of the project’s maintenance requirements and long-term fiscal impacts. Possible points: 10 3. Proposal is appropriate for the park or trail it is proposed for (see Park Design Manual and Inventory List). Possible points: 5 4.Clarity and completeness of the applica?on materials. Possible points: 10 5. Project, the applicant team, and/or the delivery method improves inclusivity and equity within the parks and trails system. Possible points: 10 6. Project improves physical access to parks because it is in an area with low level of proximity to parks as iden?fied in Figure 3.8 of the PRAT Plan. Possible points: 10 7. Capacity of the applicant(s) to contribute to the City’s communica?on efforts about the Community Grant Program including project status updates, social media or other communica?on, and/or events to celebrate accomplishment of the project. Possible points: 10 8. Degree to which the project or partnership amplifies the work of the Parks Division and objec?ves of the PRAT Plan. Possible points: 20 Alloca?on of Funding Once staff and UPFB scores have been collected, staff will create a funding recommenda?on to be finally approved by the Urban Parks and Forestry Board. Staff will make every effort to ensure projects with the highest scores are awarded full grant request, but lower scoring projects may also receive funding in order to be?er use the appropriated grant funds. It is not the intent of the Parks Division to carry forward grant funding into a new applica?on period; however, that may occur depending on the number of applica?ons received. Applicant Eligibility To encourage a diverse array of applica?ons and ensure an inclusive applica?on process, the Parks Division can be flexible regarding how project funding is dispersed or managed internally. Applica?ons from a registered non-profit or for-profit en?ty may be eligible to have funding dispersed to them directly; whereas individuals may work with the City to make purchases of materials or equipment necessary to carry out the project. 10 INSERT ONTO PARKS LETTERHEAD Applica?on Steps 1. Because the projects will be carried out on City property, collabora?on with the Parks Division is essen?al to crea?ng a successful applica?on. Addi?onally, due to state law, there are some restric?ons on where the funding source can be spent. Applicants are encouraged to contact the Park Planning and Development Manager at 406-582-2908 prior to applica?on submi?al. 2.Complete a?ached applica?on form 3.A?ach supplemental informa?on such as the project descrip?on (1000 word maximum), visuals including maps (4 pages maximum), and material and labor es?mates. 4.A?ach 2-4 le?ers of recommenda?on. 5.Submit applica?on form, supplemental informa?on and le?ers of recommenda?on as an individual PDF by email to xxxxxx by the applica?on deadline. Applica?on Deadline The applica?on deadline for 2025 grants is xxxx at 5:00 PM. 11 INSERT ONTO PARKS LETTERHEAD Appendix 1: Poten?al Project Ideas THEME 1: WELCOMING, EQUITABLE ACCESS Add park assets that were iden?fied as in high demand by the community in the PRAT Plan and its appendixes in new and exis?ng spaces. Add elements to increase access citywide to playgrounds (including universal play spaces), trails, spaces for dogs, community gardens/ food forests, fields, courts, and splash pads. Improve universal access of play spaces, pathways, community gardens, wayfinding and signage. Invest in acquisi?on of new pathways, parks and natural areas within parks that: 1) help to close exis?ng 10-minute walk gaps, and 2) overcome extreme physical barriers. Acquire land to make key trail, path or park connec?ons iden?fied in the Ac?ve Transporta?on component of the plan (Goal 3) and to be?er connect people to parks. Make rules and regula?ons clear and easy to understand in English and Spanish Expand and improve dog park spaces to promote balanced use and enjoyment of park spaces by all. Support winter ac?vi?es by increasing access to complementary indoor space. Communicate best prac?ces for safety outdoors in the winter Provide grooming for winter use. Use parks to tell stories that engage with arts, culture and local history and reflect local iden??es. Celebrate Bozeman’s park bridges. THEME 2: PROGRAMS, PLACES AND PARTNERSHIPS Expand temporary art exhibi?ons and permanent public art programs across city parks and facili?es. THEME 3: PEDESTRIAN AND BICYCLE FACILITIES Construct ac?ve transporta?on network segments to close key connec?vity gaps. Improve safety of pedestrian and bicycle crossings. Priori?ze construc?on of east-west network facili?es. Install the PRAT-recommended improvements along trail routes including but not limited to wayfinding, shade, benches, drinking fountains, restrooms, ligh?ng. THEME 4: NATURAL RESOURCES Design and demonstrate landscape design and management best prac?ces. Design and demonstrate sustainable trail design and maintenance. Use though?ul trail design that encourages people to stay on the trail with invi?ng access points to sit, watch, fish, and play. Design and demonstrate ways for people and children to interact with wetlands, waterways and forests. Plant drought tolerant and na?ve vegeta?on and trees. 12 INSERT ONTO PARKS LETTERHEAD Appendix 2: Defini?ons Parks or recrea?onal areas Nature play Equity Inclusivity Access (use reduce physical barriers instead?) 13 INSERT ONTO PARKS LETTERHEAD APPENDIX C: Cita?on from Montana Code Annotated Regarding Funding (5) (a) In accordance with the provisions of subsec?ons (5)(b) and (5)(c), the governing body shall use the dedicated money or land for development, acquisi?on, or maintenance of parks to serve the subdivision. (b) The governing body may use the dedicated money to acquire, develop, or maintain, within its jurisdic?on, parks or recrea?onal areas or for the purchase of public open space or conserva?on easements only if: (i) the park, recrea?onal area, open space, or conserva?on easement is within a reasonably close proximity to the proposed subdivision 14 COMMUNITY GRANT PROGRAM APPLICATION Parks Subdivision Pre-app Checklist Page 1 of 1 Revision Date: February 2024 Park Name(s): ______________________________________________________________________________________ Name of Project: ____________________________________________________________________________________ Location of project within the park and nearest cross street: _________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ Applicant (Organization): _____________________________________________________________________________ Primary Contact(s): __________________________________________________________________________________ Phone Number(s): ___________________________________________________________________________________ Email Address(es): ___________________________________________________________________________________ Funding Requested: _________________________________________________________________________________ Match Provided by Applicant: _________________________________________________________________________ Brief Project Description: _____________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ (SEE SUBMITTAL REQUIREMENTS ON NEXT PAGE) APPLICATION CONTINUES ON PAGE 2 CONTACT US GENERAL FORM INFORMATION AND INSTRUCTIONS This form is used to submit an application to the City of Bozeman Parks Division Community Grant Program. Grant applications are accepted for the development, acquisition and/or maintenance projects within parks or recreational areas within the City of Bozeman. Please complete all sections of the application. Attach additional pages as necessary. Contact Addi Jadin, Parks Planner and Development Manager, for assistance with supplemental requirements or any questions (ajadin@bozeman.net or 582-2908). PROJECT INFORMATION 15 COMMUNITY GRANT PROGRAM APPLICATION Parks Subdivision Pre-app Checklist Page 1 of 1 Revision Date: February 2024 __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ 1)Site layout drawing (site plan) with dimensions of proposed improvements at 1” = 20’ feet or larger scale as well as existing features in the area of the park. 2) A narrative document that discusses the following items: a. How the project improves inclusivity and equity within the parks and trails system; b. How the project improves physical access to parks; c. Feasibility of the project’s maintenance requirements and long term fiscal impacts; d. The degree to which the project or partnership amplifies the work of the Department; e. Describes the process utilized for obtaining public input and support for the project (ex. HOA meetings, neighborhood surveys, etc.); f.How the project addresses the identified PRAT theme(s) and strategies specific to the project; g. Project budget, funding request and amount, and project timeline; 3) Details or manufacturer cut sheets of the proposed site improvements. 4) Basic cost estimate for purchased items and installation costs. 5) If applicable, describe in detail how all in-kind contributions will be provided as applicable (matching volunteer labor, donated items, other grants and their terms, etc.). 6) Letters of Support. SUBMITTAL REQUIREMENTS ADDITIONAL INFORMATIONAL OR COMMENTS 16 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Michael Stoerger, Admin Asst II Mitch Overton, Parks & Rec Director SUBJECT:Capital Budget Review MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Citizen Advisory Board/Commission RECOMMENDATION:N/A STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of an interconnected system of parks, trails and open spaces. BACKGROUND:N/A UNRESOLVED ISSUES:N/A ALTERNATIVES:As suggested by the UPF board FISCAL EFFECTS:N/A Attachments: CIP Project Report 20262030.pdf Report compiled on: January 23, 2025 17 CITY OF BOZEMAN ADOPTEDCAPITAL IMPROVEMENT PLAN FISCAL YEARS 2026-2030 18 19 CITY OF BOZEMAN, MONTANA CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS 2026-2030 Presented during Public Meetings held December 2024 CITY COMMISSION Terry Cunningham, Mayor Joey Morrison, Deputy Mayor Emma Bode, Commissioner Douglas Fischer, Commissioner Jennifer Madgic, Commissioner CITY STAFF Chuck Winn, City Manager Melissa Hodnett, Finance Director Kaitlin Johnson, Budget Analyst Jonathon O'Dougherty, Budget Analyst Adopted FY26-30 Capital Improvement Plan Page 1 of 383 20 CIP MESSAGE Dear City Commission and Residents of Bozeman: We are proud to present to you the City of Bozeman’s 2026-2030 Capital Improvement Plan. This five-year Capital Improvement Plan (CIP) is a commitment to improving and maintaining the City of Bozeman’s infrastructure, facilities, parks, and roads to aid in the vision of Bozeman as the most livable place. City staff have dedicated substantial time and effort to ensure that every project within this plan aligns with the City’s priorities and best serves our growing community. This document reflects extensive collaboration across departments, careful prioritization, and rigorous analysis of needs, costs, and timelines, enabling us to balance current demands with long-term goals. With $284.0 million in capital improvements scheduled over the 5-year plan, and an additional $386.9 million in unscheduled projects, this document represents both the immediate and future infrastructure needs of Bozeman as we continue to grow responsibly and sustainably. The CIP development process integrates regulatory requirements, community needs, and strategic goals to determine which projects receive funding and prioritization. Finance, City departments, and the City Manager's Office coordinate to review and update the CIP based on factors such as growth, infrastructure demands, and City Commission priorities. As Bozeman matures, refining our CIP development process is essential for becoming a more high-performing organization. By standardizing project prioritization, centralizing procurement, and establishing consistent evaluation criteria, we can more effectively allocate resources, streamline project timelines, and maximize cost-efficiency. Process improvements in the CIP allow us to better anticipate and meet the community's needs while minimizing redundancies and enhancing coordination across departments. These efforts reinforce our commitment to operational excellence and sustainable growth for Bozeman. PLAN CHALLENGES & KEY THEMES This plan was developed with a focus on meeting critical community needs while upholding fiscal responsibility given finite resources. Bozeman’s continued growth drives demand for new infrastructure while also intensifying the need to maintain existing systems. Addressing these challenges remains a priority for the City, with an emphasis on sustainable solutions. During the development of this plan, we have carefully evaluated and pursued sustainable options wherever possible. Amid a unique economic environment, the City continues to adapt and refine financial models, including revenue projections, to navigate budget constraints. As all City priorities compete for limited resources, careful decision-making is essential to ensure that resources are allocated efficiently. With these limitations in mind, this Capital Improvement Plan centers on two key themes: protecting City assets and planning for the future. In the first theme, we focus on assessing facility conditions, centralizing fleet management to optimize equipment use, and enhancing water supply management through leak detection and infrastructure improvements. In planning for the future, we are updating the Urban Forest Management Plan, adjusting fleet replacement and purchasing on a strategic schedule, and expanding electric vehicle infrastructure. Together, these initiatives strengthen the City’s current assets and lay a sustainable foundation for Bozeman’s future. Adopted FY26-30 Capital Improvement Plan Page 2 of 383 21 IN CLOSING We respectfully submit this 2026-2030 Capital Improvement Plan to the City Commission and the residents of the City of Bozeman. The City will continue to plan for the future by investing in capital infrastructure in order to keep Bozeman as a vibrant and active city. The 2026-2030 CIP is a plan to guide future budgetary decisions, provide efficient and effective services, and achieve the Commission’s vision and priorities set out in the Strategic Plan for the City of Bozeman. Respectfully, Melissa Hodnett Kaitlin Johnson Jonathon O'Dougherty Finance Director Budget Analyst Budget Analyst Adopted FY26-30 Capital Improvement Plan Page 3 of 383 22 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 4 of 383 23 TABLE OF CONTENTS CIP Summary Public Works CIP Summary .............................................................7 Public Works Administration Fund ..........111 CIP Process ................................................................10 Shops Complex Construction Fund ..........115 CIP Funding ...............................................................14 Solid Waste Fund .............................................117 CIP Financial Summary .........................................15 Landfill Post-Closure Fund ..........................125 Stormwater Fund .............................................131 Fund Summaries Public Works (continued) General Fund ...............................................................21 Transportation City Commission ..............................................25 Street Maintenance Fund .......................145 Finance .................................................................27 Street Impact Fee Fund ............................181 Facilities ...............................................................29 Arterial & Collector District Fund .......193 Information Technology (IT) .......................49 Street Reconstruction Fund ...................211 Neighborhood Services .................................53 Vehicle Maintenance Fund ..........................217 Police ....................................................................57 Wastewater Fund ............................................223 Parks & Recreation .........................................65 Wastewater Impact Fee Fund ....................267 Sustainability .....................................................73 Water Fund ........................................................283 General Government Water Impact Fee Fund ................................329 Planning Fund ....................................................79 Public Welfare Public Safety Forestry (Tree Maintenance) Fund ..........341 Building Inspection Fund ..............................85 Parks & Trails District Fund .........................349 Fire Capital & Equipment Fund ..................91 Story Mansion Special Revenue Fund .....367 Parking Fund ......................................................103 Parkland Trust Fund .......................................373 Library Depreciation Fund ...........................379 Adopted FY26-30 Capital Improvement Plan Page 5 of 383 24 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 6 of 383 25 CIP SUMMARY Adopted FY26-30 Capital Improvement Plan Page 7 of 383 26 CIP SUMMARY One of the primary responsibilities of local government is to properly preserve, maintain, and improve a community’s stock of buildings, streets, parks, water and sewer lines, and equipment. This CIP plan identifies infrastructure improvement projects in the next five years that will be critical for ensuring the City can effectively address its evolving needs and provide essential services to its residents. The City continues to refine its CIP process as a means to enhance both financial planning and management decisions. Construction, repair, replacement and additions that will cost over $25,000 were considered as departments developed lists of proposed projects. Population changes, land-use patterns and operational impacts are all considered when assessing future demands and needs. The City also looks at both staffing resources needed to complete the projects identified and considers financial impacts to utility rates along with available funds to pay for projects. A number of CIP projects were identified for funding in the 2026-2030 CIP. Many of the projects outlined in the CIP are complex, multi-year projects involving improvements to water, water reclamation, stormwater and transportation infrastructure. State law and City charter require the City to prepare the CIP. State Law requires the City to maintain a Capital Improvement Plan for our Development Impact Fee programs. Under Montana Code Annotated (MCA), this Capital Improvement Plan provides the schedules and cost projections required under MCA §7-6-1602(2)(k)(i-iv). In Article 5.06 of the adopted City Charter, the City Manager is responsible for preparing and submitting a multi-year capital program to the City Commission no later than December 15 for the ensuing fiscal year. The plan must be revised and extended each year with regard to projects not yet completed. This plan is required to include: 1.A clear, general summary of contents, 2.Identification of the long-term goals of the community, 3.A list of all capital improvements and other capital expenditures which are proposed to be undertaken during the fiscal years next ensuing, with appropriate supporting information as to the necessity for each, 4.Cost estimates and recommended time schedules for each improvement or other capital expenditure, 5.Method of financing upon which each capital expenditure is to be reliant, 6.The estimated annual cost of operating and maintaining the facilities to be constructed or acquired, 7.A commentary on how the plan addresses the sustainability of the community or region of which it is a part, and 8.Methods to measure outcomes and performance of the capital plan related to the long-term goals of the community. Adopted FY26-30 Capital Improvement Plan Page 8 of 383 27 Cost estimates are evaluated based on the following definitions and criteria: Estimate Class Purpose Project Definition Level Expressed as % of completion Cost Estimate Range Typical variation in high & low range Class 5 Concept or Feasibility 0% to 2%+ 100% / -50% Class 4 Preliminary Engineering 1% to 15%+ 50% / -30% Class 3 Semi-Detailed (30%-60% Design)10% to 40%+ 30% / -20% Class 2 Detailed (60%-100% Design)30% to 75%+ 20% / -15% Class 1 Final (100% Design/Bid Opening)65% to 100%+ 10% / -10% N/A Not Applicable Estimated annual impact on operating costs to maintain the facilities are evaluated based on the following definitions and criteria: Impact Definition Positive The project will result in annual operating cost savings or generate additional revenue. None The project will not result in additional annual operating expenditures. Negligible The project will increase annual operating expenditures by less than $10k. Minimal The project will increase annual operating expenditures by more than $10k but less than $50k. Moderate The project will increase annual operating expenditures by more than $50k but less than $100k. High The project will increase annual operating expenditures by more than $100k. Unknown The impacts of the project are unknown at this time. Adopted FY26-30 Capital Improvement Plan Page 9 of 383 28 CIP PROCESS The CIP is performed in compliance with State and municipal code. State Law requires the City to maintain a Capital Improvement Plan for our Development Impact Fee programs. Under Montana Code Annotated (MCA), this Capital Improvement Plan provides the schedules and cost projections required under MCA §7-6-1602(2) (k) (i-iv). In Article 5.07 of the adopted City Charter, the City Manager is responsible for preparing and submitting a multi-year capital program to the City Commission no later than December 15 for the ensuing fiscal year. Work typically begins in August. Finance works in coordination with City departments and the City Manager’s Office to revise the prior year CIP and recommend new projects that may have been identified through master planning or facilities planning over the past year. In December, the City Commission hears and adopts a five-year Capital Improvement Plan that guides the budget development process for the following year. The process is completed when the Commission adopts a final budget with capital items approved, usually in the following June. The graphic below shows this in additional detail. There are many considerations that guide project identification and prioritization from operational needs, to growth, to City Commission priorities. The following descriptions are the main areas considered in development of the CIP: Adopted FY26-30 Capital Improvement Plan Page 10 of 383 29 CITY COMMISSION STRATEGIC GOALS The City Commission's five-year Strategic Plan has been the subject of numerous citizen engagement efforts and public meeting discussions. The Bozeman Strategic Plan identifies long-term goals of the community as detailed below, and guides the capital improvement planning process. (1) An Engaged Community Fostering successful collaboration with other public agencies and building on our successes, which is being achieved through City-County Regional Planning. The Bikefill Community Park project is a great example of community collaboration and engagement. The City continues to work toward a culture of civic engagement and build public trust by using our adopted communication plan for the organization to expand community outreach and community engagement. (2) An Innovative Economy This plan supports retention and growth of both the traded and local business sectors in coordination with the Economic Vitality Strategy adopted by the City Commission in June 2023. The budget includes strategic investments in infrastructure as a mechanism to encourage economic development by serving our community with a transportation system, clean water, sewer access, and other infrastructure. Some examples that highlight this include Phases I and II of the Water Reclamation Facility (WRF) Base Hydraulic Capacity project, which will meet the City’s wastewater treatment 20-year growth planning horizon as identified in the 2022 WRF Facility Plan Update. (3) A Safe, Welcoming Community The capital plan includes a new Fire Station #4, assumed to be funded by a future bond levy, which is consistent with the Fire Master Plan and will help Fire respond to a growing west side. Active recreation capital improvement projects are included throughout the General Fund Recreation Department and the Parks & Trails District Fund with many projects that encourage and promote active recreation. (4) A Well-Planned City The Parks, Recreation, and Active Transportation (PRAT) Master Plan implementation began in FY22 and projects continue in this five-year plan. Capital projects are included in this plan to enhance non-motorized transportation, including funding additional bike path improvements. All road infrastructure projects scheduled in the Street Impact Fee Fund will include investments in bike lanes. Adopted FY26-30 Capital Improvement Plan Page 11 of 383 30 (5)A Creative Learning Culture The Percent for Art program has been fully incorporated into the Capital Improvement Plan. The program provides a guaranteed funding mechanism for the acquisition of artwork for new public facilities and civic spaces. (6)A Sustainable Environment The Sustainability Division budget includes funding to add solar panel arrays to City buildings and the addition of EV charging stations within City limits. We plan to continue to pursue federal grants to further energy and resilience projects such as energy storage, renewable energy, and electrification for City infrastructure. In addition, all City vehicles included in the CIP will explore hybrid or electric options where available. (7)A High Performance Organization As Bozeman continues to grow, refining our Capital Improvement Program (CIP) development process is crucial to becoming a more high- performing organization. By standardizing project prioritization, centralizing procurement of capital items like vehicles, and ensuring consistent evaluation criteria, we can more effectively allocate resources, streamline project timelines, and maximize cost-efficiency. Process improvements within CIP development allow us to better anticipate and respond to the community's needs while minimizing redundancies and improving coordination across departments. These enhancements not only strengthen our ability to deliver critical infrastructure projects but also reinforce our commitment to operational excellence and sustainable growth for the City of Bozeman. POLICIES FOR THE PHYSICAL DEVELOPMENT OF OUR COMMUNITY The City’s Unified Development Code (UDC) is a combination of both Subdivision and Zoning regulations for development within the City. The Code is subject to amendment by the Commission, after public notices and hearings are held. The UDC applies to both private and city-owned projects. The City is currently underway with “The Bozeman Code Update,” a public process to update the City’s Unified Development Code (UDC). The UDC covers a diverse range of topics, including, zoning, design standards, subdivisions, wetland, and permit review procedures. The key feature of the update is to translate the community's expectations for development as expressed in the Community Plan into a concise and useable set of regulations. LONG-RANGE FACILITY PLANS AND MASTER PLANS The City has a number of long-range (20-year) facility plans. These studies examine the condition and placement of existing facilities, area growth projections and pattern, regulatory changes, and possible funding mechanisms. The plans analyze various alternatives and include recommendations for implementation. Adopted plans include: •Water Treatment & Distribution Facilities •Wastewater Collection & Treatment Facilities •Stormwater Collection & Treatment Facilities •Fire Station, Equipment & Staffing Adopted FY26-30 Capital Improvement Plan Page 12 of 383 31 •Police Station & Staffing •Parks, Recreation, Trails & Open Space •Transportation System Plan •Facilities Condition Assessment Most of the City’s long-range plans establish level of service (LOS) standards. These standards are critical to planning for the needs of future city residents. In some cases, such as water quality or wastewater discharge, these standards are often established or guided by outside regulating bodies. The CIP does not frequently reference specific LOS, but the underlying facility and staffing plans will contain detailed discussions of levels of service, and how the City should address increasing or decreasing levels of service through infrastructure and staffing recommendations. ABILITY TO PAY FOR PLANNED IMPROVEMENTS In a community with relatively high cost of living, the ability of citizens to afford the needed utility rate, fee, and assessment levels is of concern. The City is currently conducting updated utility rate studies for Water, Wastewater, Stormwater, and Solid Waste services. Updated studies give us an indication of how and when utility rates must be increased to pay for the needed utility infrastructure improvements. For General Fund (Administration, Recreation, Library, Police, and Fire) facilities the City does not have the ability to easily increase tax levels to increase funding. Voters must approve any tax levy increase, and state law establishes maximum debt service levels limiting the ability to finance key capital projects. However, in November 2007, the City of Bozeman voters approved a four-mill perpetual levy to establish a Fire Equipment and Capital Replacement fund. This fund was added to the CIP plan, and the funds are for replacements of fire engines, ladder trucks, and other capital improvements to fire stations. The City has four City-wide special districts: Street Maintenance, Tree Maintenance (Forestry), Street Arterial & Collector District, and a Parks & Trails District. The districts are funded by special assessments which are charged to property owners based on the square footage of their lot. Special assessment amounts are determined each year in August or September, and are based on the Adopted Budget, typically adopted by City Commission between June and August. The Street Maintenance District was created in 1990 and accounts for annual street maintenance like mill and overlay, curb repairs, and associated equipment. The Tree Maintenance or Forestry District was also created in 1990 and pays for the preservation and planting of trees in City right of way. In the summer of 2015, the City successfully created a citywide Arterial & Collector Street Special District, under the special district laws of the state. The District is meant to fund street maintenance and (re)construction on Arterial & Collector streets that is NOT eligible to be funded by impact fees. The CIP includes a 5-year plan for capital projects for this new district. In May 2020, the citizens of Bozeman voted Adopted FY26-30 Capital Improvement Plan Page 13 of 383 32 to approve the creation of a Parks & Trails District. The plan for this district was developed first with consultants and furthered in Capital Improvement Plans and internal staffing plans ever since. A citywide park and trail district is an effort to expand funding for new parks and for deferred maintenance of park assets. CIP FUNDING The program is designed and planned by fund. Within those funds, the method for funding each project is determined. Some funds have fees or taxes that are specific to capital improvement or maintenance. Debt financing may be proposed for some projects during the budget development process. Below are the sources of funds for each fund included in the CIP. GOVERNMENTAL FUNDS PROPRIETARY FUNDS Fund Source(s) of Revenue Fund Source(s) of Revenue General Fund Taxes and charges for services Enterprise Funds Special Revenue Funds Parking Charges for services and enforcement Community Development Fund Property tax and charges for services Solid Waste Charges for services Building Inspection Fund Charges for services Landfill Post-Closure Taxes and Transfers Fire Capital & Equipment Fund Dedicated four mills, annually Stormwater Charges for services Street Maintenance District Assessments and Gas Tax Wastewater Charges for services Street Impact Fee Impact fee revenue Wastewater Impact Fee Impact fee revenue Arterial & Collector District Assessments and Gas Tax Water Charges for services Forestry (Tree Maintenance)Assessments Water Impact Fee Impact fee revenue Parks & Trails District Assessments Internal Service Funds Story Mansion Charges for services Public Works Administration Internal charges to other funds Parkland Trust Cash in lieu of Parkland Vehicle Maintenance Internal charges to other funds Capital Construction Funds Shops Complex Construction Transfers Street Reconstruction Assessments and Street Improvement Districts Library Depreciation Remaining budget from prior year Adopted FY26-30 Capital Improvement Plan Page 14 of 383 33 2026-2030 CIP FINANCIAL SUMMARY This five-year plan has $284.0 million in scheduled projects and $386.9 million in unscheduled projects. Unscheduled items are in need outside the five-year plan or remain unscheduled due to funding constraints or unresolved issues. Fund FY26 FY27 FY28 FY29 FY30 5-year Total Unscheduled General Fund $ 2,524,600 $ 2,431,400 $ 1,740,900 $ 1,039,300 $ 4,474,000 $ 12,210,200 $ 33,696,000 Planning 25,000 67,500 — — — 92,500 — Building Inspection 79,100 67,500 — — — 146,600 — Fire Capital & Equipment 151,700 4,029,500 672,400 65,600 68,300 4,987,500 2,320,000 Parking 170,500 70,000 170,000 37,000 — 447,500 2,901,800 Public Works Administration — 600,000 — — — 600,000 — Shops Complex — — — — — — 56,264,800 Solid Waste 625,000 235,000 440,000 954,000 477,000 2,731,000 3,227,000 Landfill Post-Closure 351,500 801,000 — — — 1,152,500 — Stormwater 1,524,500 212,500 984,200 636,900 1,466,700 4,824,800 650,000 Street Maintenance 3,261,400 3,332,600 3,434,700 2,399,400 2,577,000 15,005,100 2,437,000 Street Impact Fee 15,992,900 6,210,000 3,509,600 3,250,000 — 28,962,500 28,942,900 Arterial & Collector District 5,905,600 3,635,700 7,713,900 8,939,100 — 26,194,300 21,454,200 Street Reconstruction 434,400 135,000 146,200 158,200 169,700 1,043,500 7,244,500 Vehicle Maintenance 52,000 90,000 81,000 — — 223,000 40,000 Wastewater 3,748,800 5,141,800 4,331,200 6,742,600 5,456,300 25,420,700 102,750,000 Wastewater Impact Fee 4,437,700 5,789,900 25,437,500 6,866,400 2,022,000 44,553,500 12,852,000 Water 6,820,900 21,563,600 11,178,700 15,190,900 7,995,200 62,749,300 27,484,300 Water Impact Fee 1,977,400 1,985,700 11,147,500 5,365,000 17,055,000 37,530,600 75,440,000 Forestry (Tree Maintenance) 130,000 — 85,000 200,000 150,000 565,000 — Parks & Trails District 1,310,000 4,573,700 2,743,200 1,980,300 1,518,800 12,126,000 9,238,000 Story Mansion — 827,700 159,800 170,200 150,700 1,308,400 — Parkland Trust 600,000 — 170,000 — — 770,000 — Library Depreciation 200,000 200,000 — — — 400,000 — Total $ 50,323,000 $ 62,000,100 $ 74,145,800 $ 53,994,900 $ 43,580,700 $ 284,044,500 $ 386,942,500 Adopted FY26-30 Capital Improvement Plan Page 15 of 383 34 SCHEDULED CIP FINANCIAL SUMMARY Water, 22.1% Wastewater Impact Fee, 15.7% Water Impact Fee, 13.2% Street Impact Fee, 10.2% Arterial & Collector District, 9.2% Wastewater, 8.9% Street Maintenance, 5.3% General Fund, 4.3%Parks & Trails District, 4.3% Fire Capital & Equipment, 1.8%Stormwater, 1.7% Solid Waste, 1.0% Story Mansion , 0.5% Landfill Post-Closure, 0.4% Street Reconstruction, 0.4%Other, 1.1% Adopted FY26-30 Capital Improvement Plan Page 16 of 383 35 UNSCHEDULED CIP FINANCIAL SUMMARY Wastewater, 26.6% Water Impact Fee, 19.5% Shops Complex, 14.5% Water, 7.1% General Fund, 8.7% Street Impact Fee, 7.5% Arterial & Collector District, 5.5% Wastewater Impact Fee, 3.3% Parks & Trails District, 2.4% Street Reconstruction, 1.9% Solid Waste, 0.8% Parking, 0.7% Street Maintenance, 0.6% Fire Capital & Equipment, 0.6% Stormwater, 0.2% Vehicle Maintenance, 0.0% Adopted FY26-30 Capital Improvement Plan Page 17 of 383 36 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 18 of 383 37 FUND SUMMARIES Adopted FY26-30 Capital Improvement Plan Page 19 of 383 38 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 20 of 383 39 GENERAL FUND Adopted FY26-30 Capital Improvement Plan Page 21 of 383 40 General Fund Scheduled Projects Total by Department Service Area Department FY26 FY27 FY28 FY29 FY30 5-Year Total General Government City Commission $ -$ General Government Finance - General Government Facilities Management 670,500 General Government Information Technology 334,500 Public Welfare Neighborhood Services 104,000 Public Safety Police 359,500 Public Welfare Parks & Recreation 415,000 Public Welfare Sustainability 641,100 250,000 $ -$ -$ 420,000 - - 511,200 359,200 177,900 65,000 65,000 398,500 - 66,200 - 993,200 992,400 393,700 128,000 191,600 - 64,000 66,500 69,200 450,000 $ - 1,784,100 95,000 72,900 1,600,000 400,000 72,000 700,000 420,000 3,502,900 958,000 243,100 4,338,800 1,134,600 912,800 General Fund Total $ 2,524,600 $ 2,431,400 $ 1,740,900 $ 1,039,300 $ 4,474,000 $ 12,210,200 Adopted FY26-30 Capital Improvement Plan Page 22 of 383 41 General Fund Unscheduled Projects Service Area Department Project Code Project Name Amount Description General Government Facilities Management GF363 Senior Center Reimagining $10,000,000 City Commission has identified an opportunity to explore ways to enhance the existing Senior Center facility. Project will investigate how the center could be reimagined to better serve the community. Public Safety Police GF385 Police Training Facility 500,000 Training facility would include building(s) and other outside training space to include classrooms, areas for active scenario-based training, and a firearms range. Public Safety Police GF384 Police Substation 15,500,000 This project will establish a smaller office-type location on the west side for officers to work during shift assignments. As the city expands westward, this additional location will be essential to improve response times and accommodate departmental growth. A larger substation, budgeted in unscheduled for $15.5 million, would likely be funded through a future mill levy, serving as a more permanent base for officers. Public Welfare Recreation GF372 Story Mansion Restoration 7,696,000 Restoration of the 2nd and 3rd floors of the Story Mansion to original standards, which will open up additional, usable public space. Total $33,969,000 Adopted FY26-30 Capital Improvement Plan Page 23 of 383 42 Map of General Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 24 of 383 43 Scheduled Projects for City Commission Commission Technology Upgrade (GF356) FUND DEPARTMENT PROJECT TYPE General Fund City Commission Equipment OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Discretionary $250,000 Total Scheduled Project Cost $250,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Replacement of hardware in the Commission Room will allow for upgraded functionality during meetings in the room, including broadcasting, streaming, microphones, speakers, monitors, projector, etc. The annual maintenance cost is expected to be approximately $13,000. CONSEQUENCES OF DELAYING PROJECT Failure of a piece of hardware may render the room inoperable for public meetings. This is specialty equipment that we do not have readily available to replace if a piece fails due to age. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Project cost has increased due to escalating costs of components. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $250,000 $0 $0 $0 age Number Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 25 GF356 Commission Technology Upgrade $ -$ 250,000 $ -$ -$ -$ 250,000 26 GF381 Meeting Streaming Platform - - - - 450,000 450,000 Total $ -$ 250,000 $ -$ -$ 450,000 $ 700,000 Adopted FY26-30 Capital Improvement Plan Page 25 of 383 44 Meeting Streaming Platform (GF381) FUND DEPARTMENT PROJECT TYPE General Fund City Commission Software as a Service OPERATING IMPACT COST ESTIMATE CLASS Moderate N/A FUNDING SOURCE(S) AMOUNT Discretionary $450,000 Total Scheduled Project Cost $450,000 STRATEGIC PLAN, IF APPLICABLE 1. An Engaged Community DESCRIPTION OF PROJECT Streaming platform offerings have increased since the selection of our current provider. As technology continues to diversify and improve, updated options for streaming and recording may be an improved method of reaching our constituents. The current hardware facilitating the platform will be aging, and this project will require replacement to meet advancing requirements. $75,000 of this project will be hardware upgrades in FY30. Annual software costs are anticipated to be $75,000 in each year of FY30-FY35. CONSEQUENCES OF DELAYING PROJECT In FY30 our current technology will be 10 years old, which results in a risk of losing functionality for streaming and recording of our public meetings. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $0 $0 $450,000 Adopted FY26-30 Capital Improvement Plan Page 26 of 383 45 Scheduled Projects for Finance Enterprise Resource Planning (ERP) Replacement/Upgrade (GF277) FUND DEPARTMENT PROJECT TYPE General Fund Finance Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary Interfund Transfers Permit Fees $420,000 $600,000 $135,000 Total Scheduled Project Cost $1,155,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Placeholder for examination of current ERP system and replacement/upgrade. An ERP replacement/upgrade involves careful planning, resource allocation, and coordination including assigning a project team and project manager and ensuring adequate financial and personnel resources and IT infrastructure. CONSEQUENCES OF DELAYING PROJECT Delaying the project may lead to operational inefficiencies, higher costs, limited integration, and security risks. Additionally, postponement risks hindering necessary updates and hardware/software maintenance in the case that the current system reaches end-of-life status. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $420,000 $0 $0 $0 Public Works Administration $0 $0 $600,000 $0 $0 $0 Planning Fund $0 $0 $67,500 $0 $0 $0 Building Inspection Fund $0 $0 $67,500 $0 $0 $0 Total $0 $0 $1,155,000 $0 $0 $0 Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 27 GF277 ERP Replacement/Upgrade $ -$ 420,000 $ -$ -$ -$ 420,000 Total $ -$ 420,000 $ -$ -$ -$ 420,000 Adopted FY26-30 Capital Improvement Plan Page 27 of 383 46 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 28 of 383 47 Scheduled Projects for Facilities Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 30 FCA009 Library Boiler Replacements $ 317,100 $ -$ -$ -$ -$ 317,100 31 FCA007 Site Accessibility Assessments 86,600 - - - - 86,600 32 GF344 New Department Vehicle 75,000 - - - - 75,000 33 FCA010 Architectural Study 73,300 - - - - 73,300 34 FCA012 Railings/Handrail Replacement 67,700 - - - - 67,700 35 GF379 Flooring Replacement 50,800 - - - - 50,800 36 LIB31 Aircooled Chiller Replacement - 289,400 - - - 289,400 37 FCA016 Sanitary Piping Replacement - 69,900 - - - 69,900 38 FCA001 Site Structural Engineering Review - 66,900 - - - 66,900 39 GF391 City Hall Restroom Renovation - 60,000 - - - 60,000 40 FCA005 Site Potable Water Projects - 25,000 - - - 25,000 41 FCA003 Site Door/Window Replacements/Repairs - - 242,200 - - 242,200 42 FCA011 Beall Accessible Ramp Replacement - - 81,600 - - 81,600 43 FCA013 Story Mill Gutter Replacement - - 35,400 - - 35,400 44 FCA017 New Roof Project - - - 96,300 - 96,300 45 FCA006 Site Electrical Equipment Replacements - - - 81,600 - 81,600 46 GF386 Stiff Professional Building HVAC Replacements - - - - 1,751,300 1,751,300 47 GF383 Vehicle Replacement - - - - 32,800 32,800 Total $ 670,500 $ 511,200 $ 359,200 $ 177,900 $ 1,784,100 $ 3,502,900 Adopted FY26-30 Capital Improvement Plan Page 29 of 383 48 Library Boiler Replacements (FCA009) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $317,100 Total Scheduled Project Cost $317,100 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. The FCA identified boilers which have met their life cycles. Major repairs have been required to keep them running. CONSEQUENCES OF DELAYING PROJECT Failure of heating system could reduce heating capacity that could impact operations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $317,100 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 30 of 383 49 Site Accessibility Assessments (FCA007) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $86,600 Total Scheduled Project Cost $86,600 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. The Facility Condition Assessment (FCA) completed in 2023 recommends accessibility site assessments at the following facilities: Beall, Library, Senior Center, City Hall, Solid Waste, Story Mill, and Water Reclamation Facility. CONSEQUENCES OF DELAYING PROJECT Delaying the project could result in issues with compliance to the Americans with Disabilities Act (ADA) or other regulation. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost has decreased by $5,550 due to the removal of project components at City Shops Complex. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $86,600 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 31 of 383 50 New Department Vehicle (GF344) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 2 FUNDING SOURCE(S) AMOUNT Discretionary & Transfers In $75,000 Total Scheduled Project Cost $75,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The adopted budget includes a new worker in the facilities department in FY26. Requirements for the vehicle will be a four-wheel drive, full-size truck with shell. The vehicle will be electric or hybrid. CONSEQUENCES OF DELAYING PROJECT Facilities staff need vehicles to support department day-to-day operations including hauling materials, pulling trailers, and can perform in all weather conditions. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $75,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 32 of 383 51 Architectural Study (FCA010) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Unknown Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $73,300 Total Scheduled Project Cost $73,300 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Facility Condition Assessment (FCA) completed in 2023 recommends architectural investigation of wall assemblies within the Library, City Hall, Professional Building, and the Senior Center. The investigation would determine a solution for instances where thermal transfer from the exterior to the interior is causing damage to the building through condensation. An architectural study will provide the details needed to develop a final design and formal recommendation for future project recommendations. CONSEQUENCES OF DELAYING PROJECT The architectural study will provide critical information about the condition of the buildings. Failure to perform the study may result in significant and unanticipated maintenance. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $73,300 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 33 of 383 52 Railings/Handrail Replacement (FCA012) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $67,700 Total Scheduled Project Cost $67,700 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. The Facility Condition Assessment (FCA) completed in 2023 recommends Senior Center interior wood handrails and railings for replacement. CONSEQUENCES OF DELAYING PROJECT Failure to replace the railings/handrails could result in safety and ADA compliance issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $2,600 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $67,700 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 34 of 383 53 Flooring Replacement (GF379) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $50,800 Total Scheduled Project Cost $50,800 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The carpet at Fire Station 3 is in poor condition. This project would remove the carpet and have the concrete polished to match other existing fire stations in the portfolio. CONSEQUENCES OF DELAYING PROJECT Delaying this project will result in the continued deterioration of the carpet within Fire Station 3, resulting in the potential for a safety hazard. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $50,800 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 35 of 383 54 Aircooled Chiller Replacement (LIB31) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $489,400 Total Scheduled Project Cost $489,400 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The Bozeman Public Library cooling system consists of a single air-cooled chiller which provides critical environmental controls for the facility. The average life expectancy of an air-cooled chiller is 15-20 years. Originally installed in 2006, the air-cooled chiller is likely nearing the end of its expected life. Additional funding for this project exisists in the Library Depreciation Fund. Additional escalation cost was not captured in the number that was approved by the Library Board. If funds are available in FY27 in the Library Depreciation Fund, they will be used for the overage CONSEQUENCES OF DELAYING PROJECT Parts for the existing chiller are no longer available. If it fails, the Library will lose cooling until a replacement is installed. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $85,400 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $289,400 $0 $0 $0 Library Depreciation Fund $0 $0 $200,000 $0 $0 $0 Total $0 $0 $489,400 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 36 of 383 55 Sanitary Piping Replacement (FCA016) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $69,900 Total Scheduled Project Cost $69,900 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Per Facilities Condition Assessment (FCA) recommendations, current sanitary lines out of Professional Building are mixed sizes and prone to blockage. Lines have met their useful life cycle and require replacement. CONSEQUENCES OF DELAYING PROJECT Failure to complete this project could result in sewage back up into the building. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $2,500 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $69,900 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 37 of 383 56 Site Structural Engineering Review (FCA001) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Unknown Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $66,900 Total Scheduled Project Cost $66,900 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Per Facility Condition Assessment (FCA) recommendations, structural concerns need to be evaluated by a structural engineer at the Library, Story Mill Community Center, City Hall, and Senior Center. CONSEQUENCES OF DELAYING PROJECT The highest priority building among the listed facilities is City Hall, which needs ongoing monitoring to assess observed cracking in brick work and concrete slabs. If structural review does not occur, the cost of future maintenance may increase. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was reduced by $53,100 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system and the removal of project components at the Bozeman City Shops Complex. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $66,900 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 38 of 383 57 City Hall Restroom Renovation (GF391) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Discretionary $60,000 Total Scheduled Project Cost $60,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This project involves a renovation of the restrooms located on the first floor of Bozeman City Hall. The goal for this project will be to modernize facilities to ensure compliance with current accessibility standards, improve privacy, and repair outdated and ineffective fixtures. The project was not included as part of the scope of City Hall Renovations due to funding constraints, however it is recognized as a priority for the near term. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying this renovation could include increased maintenance costs, accessibility non-compliance, and health and hygiene concerns. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $60,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 39 of 383 58 Site Potable Water Projects (FCA005) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $25,000 Total Scheduled Project Cost $25,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Per Facility Condition Assessment (FCA) recommendations, this project will entail replacing water heaters at Solid Waste Building and Senior Center and installing a new eyewash station at Solid Waste Building. CONSEQUENCES OF DELAYING PROJECT The identified projects are safety related or associated with equipment that is nearing end of life and requires replacement. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was reduced $5,200 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system and the removal of project components at the Bozeman City Shops Complex. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $25,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 40 of 383 59 Site Door/Window Replacements/Repairs (FCA003) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $242,200 Total Scheduled Project Cost $242,200 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. The Facility Condition Assessment (FCA) recommends window and door replacements and repairs at the following facilities: Fire Station 3, Professional Building, Senior Center, and Beall. CONSEQUENCES OF DELAYING PROJECT Delaying the project is likely to result in higher energy costs and safety concerns. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was reduced $67,200 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system and the removal of project components at the Bozeman City Shops Complex FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $242,200 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 41 of 383 60 Beall Accessible Ramp Replacement (FCA011) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $81,600 Total Scheduled Project Cost $81,600 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Per Facilities Condition Assessment (FCA) recommendations, the porch and ramp at the Beall Recreation Center are failing and should be replaced. CONSEQUENCES OF DELAYING PROJECT Failure to replace the ramp could result in safety and ADA compliance issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $3,100 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $81,600 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 42 of 383 61 Story Mill Gutter Replacement (FCA013) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $35,400 Total Scheduled Project Cost $35,400 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Per Facility Condition Assessment (FCA) recommendations, the gutters at Story Mill should be replaced. The original gutters were installed in a sub-standard method resulting in ice damming and other water damage to building. CONSEQUENCES OF DELAYING PROJECT Failure to replace gutters will result in continued building damage and additional maintenance costs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $1,400 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $35,400 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 43 of 383 62 New Roof Project (FCA017) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $96,300 Total Scheduled Project Cost $96,300 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The public safety condo (the City’s portion of Fire Station 3) roof is failing and requires replacement. Gallatin County is lead on this project, and City will be responsible for 50 percent of total cost. CONSEQUENCES OF DELAYING PROJECT Failure to replace the roof could result in water damage, mold, damage to belongings, and structural damage. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $3,700 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $0 $96,300 $0 Adopted FY26-30 Capital Improvement Plan Page 44 of 383 63 Site Electrical Equipment Replacements (FCA006) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $81,600 Total Scheduled Project Cost $81,600 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Per Facility Condition Assessment (FCA) recommendations, this project will replace aging electrical wiring and assemblies that are beyond life cycle or damaged at Solid Waste Building, Senior Center, and Library. CONSEQUENCES OF DELAYING PROJECT Delaying this project will result in compromised maintenance abilities, including significant down time in the event of a failure, in addition to modest safety concerns. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was reduced $90,700 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system and the removal of project components at the Bozeman City Shops Complex. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $0 $81,600 $0 Adopted FY26-30 Capital Improvement Plan Page 45 of 383 64 Stiff Professional Building HVAC Replacements (GF386) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $1,751,300 Total Scheduled Project Cost $1,751,300 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The City performed a Facility Condition Assessment (FCA) in 2023 which identified a number of capital improvement projects recommended to improve or maintain the condition of City facilities. Per Facility Condition Assessment (FCA) recommendations, many components of the Stiff Professional Building's HVAC system will reach the end of their service lives by FY30. Currently, components of the system date back to the original 1959 construction and 1974 renovation. The system is inefficient and contributes to the high energy use intensity rating for this building. Replacement of the system will improve occupant comfort, reduce energy consumption, and improve system reliability as parts availability decreases. Components to be replaced include Air Handling Unit, Ductwork Improvements, Air Conditioning Unit Replacement, and replacement of HVAC Instrumentation and Controls. CONSEQUENCES OF DELAYING PROJECT Failure to replace and improve the HVAC system will result in continued high operating costs, insufficient occupant comfort, and decreasing reliability of the system. System failure could render the building inoperable. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $0 $0 $1,751,300 Adopted FY26-30 Capital Improvement Plan Page 46 of 383 65 Vehicle Replacement (GF383) FUND DEPARTMENT PROJECT TYPE General Fund Facilities Management Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 2 FUNDING SOURCE(S) AMOUNT Discretionary $32,800 Total Scheduled Project Cost $32,800 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Department vehicle (asset #4380) 2017 Toyota Prius is being driven by a facilities Project Coordinator. The vehicle will be traded in and replaced with an all- wheel-drive passenger vehicle with higher ground clearance to better meet the needs of the Facilities Department. Replacement will allow the Project Coordinator to visit construction sites in all weather conditions and navigate rough terrain on construction sites. Replacement vehicle is planned to be Hybrid or Electric. CONSEQUENCES OF DELAYING PROJECT The value of 2017 Prius will begin depreciating at higher rate due to age of battery pack, reducing trade in value if project is delayed. The continued use of Prius will negatively impact Project Coordinator's ability to make construction site visits. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $0 $0 $32,800 Adopted FY26-30 Capital Improvement Plan Page 47 of 383 66 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 48 of 383 67 Scheduled Projects for Information Technology (IT) Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 49 GF265 Server Replacement $ 202,000 $ -$ -$ 245,000 $ 25,000 $ 472,000 50 GF080 City-Wide Switches and Routers 60,000 65,000 65,000 70,000 70,000 330,000 51 GF233 IT Vehicle Replacement 37,500 - - 43,500 - 81,000 52 GF289 Server Farm Upgrade 35,000 - - 40,000 - 75,000 Total $ 334,500 $ 65,000 $ 65,000 $ 398,500 $ 95,000 $ 958,000 Server Replacement (GF265) FUND DEPARTMENT PROJECT TYPE General Fund Information Technology Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary $472,000 Total Scheduled Project Cost $472,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Servers need to be replaced for a number of reasons, including aging hardware, performance limitations, security concerns and the desire to leverage newer technology. The useful life for servers is 5-7 years. The City tries to maintain servers for the full 7 years when possible. FY26 and FY29 include budget for larger server infrastucture that allows us to run hundreds of virtual servers on the same hardware. CONSEQUENCES OF DELAYING PROJECT Virtual servers that run on this equipment are no longer supported. Failure to replace the hardware may result in security threats and loss of software support. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Includes the addition of FY30 amounts. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $202,000 $0 $0 $245,000 $25,000 Adopted FY26-30 Capital Improvement Plan Page 49 of 383 68 City-Wide Switches and Routers (GF080) FUND DEPARTMENT PROJECT TYPE General Fund Information Technology Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary & Transfers In $330,000 Total Scheduled Project Cost $330,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Switches and routers are two fundamental networking devices that are critical to the City’s technology network by directing data traffic within and between networks. The City IT department replaces a number of switches and routers each year as they reach end of life. CONSEQUENCES OF DELAYING PROJECT Failure to replace switches and routers could result in down time and disruption of network connectability to critical city systems and the Internet. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Includes the addition of FY30 amounts. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $60,000 $60,000 $65,000 $65,000 $70,000 $70,000 Adopted FY26-30 Capital Improvement Plan Page 50 of 383 69 IT Vehicle Replacement (GF233) FUND DEPARTMENT PROJECT TYPE General Fund Information Technology Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $81,000 Total Scheduled Project Cost $81,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This project accounts for the regular replacement of IT vehicles. If current vehicles are still running well and maintenance costs remain low, replacements may be delayed. CONSEQUENCES OF DELAYING PROJECT IT department vehicles are needed to support technology at the City’s many buildings and sites. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Increases to FY26 and FY29 vehicles to reflect a 5% annual escalation based on the $34,000 price in FY24. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $37,500 $0 $0 $43,500 $0 Adopted FY26-30 Capital Improvement Plan Page 51 of 383 70 Server Farm Upgrade (GF289) FUND DEPARTMENT PROJECT TYPE General Fund Information Technology Other OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary $75,000 Total Scheduled Project Cost $75,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This project will upgrade our Virtual Machine software infrastructure to the lastest versions for compatability with current software and to ensure security updates are available. This includes our SQL database cluster that allows us to run all of the applications at the City. CONSEQUENCES OF DELAYING PROJECT If the project is delayed, software will age out and no longer be supported by vendors such as Microsoft and VMware which would create security risks and potential instability in City systems. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $35,000 $0 $0 $40,000 $0 Adopted FY26-30 Capital Improvement Plan Page 52 of 383 71 Scheduled Projects for Neighborhood Services Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 54 GF382 Vehicle (Replacements)$ 60,000 $ -$ 66,200 $ -$ 72,900 $ 199,100 55 GF387 New Portable Radios 44,000 - - - - 44,000 Total $ 104,000 $ -$ 66,200 $ -$ 72,900 $ 243,100 Adopted FY26-30 Capital Improvement Plan Page 53 of 383 72 Vehicle (Replacements) (GF382) FUND DEPARTMENT PROJECT TYPE General Fund Neighborhood Services Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $199,100 Total Scheduled Project Cost $199,100 STRATEGIC PLAN, IF APPLICABLE 6.3 Climate Action DESCRIPTION OF PROJECT This project plans for the replacement of existing vehicles and vehicle upfitting within the Neighborhood Services Department over the course of the CIP. The 2006 Durango (Asset #3329) has far exceeded its expectant lifespan, and with new safety technology and fuel efficiency standards, the Durango does not meet our environmental impact or safety goals. The Prius (Asset #3958) has met the replacement cycle and should be replaced by an all-wheel drive or four wheel drive electric vehicle, due to environmental factors directly affecting the ability of the asset to be effective in its required duties (i.e unable to drive to inspections in Glenn Lake Rotary Park because of mud and lack of ground clearance, or getting stuck in the snow and not being able to make it to the inspections for the day). Amount in FY30 is for the scheduled replacement of the vehicle purchased in FY25 based on a 5-year replacement schedule. Vehicle will electric. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying this project will result in use of the 2006 Durango for additional years. The 2016 Prius will depreciate more rapidly due to the age of the battery, which directly affects the ability to maintain a charge. The Prius is also only Front Wheel Drive which has created issues with affecting our job duties in inclement weather. Since 2016, there have been additional standards in safety for new vehicles. The Prius does not have the storage capacity needed for the day-to-day duties of Code Enforcement Officers, which make it difficult to efficiently complete assigned tasks, i.e. trying to fit a trash tote in the back of the Prius, haul refuse from the side of the road to the convenience site, and many others. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET At the time of budget development, the Neighborhood Services department did not yet exist. Vehicles were transferred to Neighborhood Services from other departments. Vehicles that have been used by Neighborhood Services were backup vehicles that were mainly unused by Parks and Facilities. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $60,000 $0 $66,200 $0 $72,900 Adopted FY26-30 Capital Improvement Plan Page 54 of 383 73 New Portable Radios (GF387) FUND DEPARTMENT PROJECT TYPE General Fund Neighborhood Services Equipment OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Discretionary $44,000 Total Scheduled Project Cost $44,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT New Portable Radios for the Neighborhood Services Department for increased safety and collaboration with other City departments and organizations in the greater Bozeman area. Specific examples include being able to communicate quickly with staff relating to day-to-day operations, maintaining a reasonable scope of authority with employees in the field when not under direct supervision, having the ability to quickly communicate with Bozeman PD or Fire in an emergency situation, and assisting with traffic control in non-emergency and emergency situations, etc. This is also related to National Incident Management System (Incident Command System) protocol for Incident Command Structure. CONSEQUENCES OF DELAYING PROJECT Any consequences of delaying this project are directly related to the safety of employees and effective communication during day-to-day operations. A delay will have a negative impact on efficiency which translates to cost. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET At the time of budget development, the Neighborhood Services department did not yet exist and the need for this level of communication was not anticipated. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $44,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 55 of 383 74 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 56 of 383 75 Scheduled Projects for Police Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 58 GF053 Patrol Vehicle Replacements $ 324,500 $ 253,100 $ 526,400 $ 273,700 $ 1,400,000 $ 2,777,700 59 GF052 Non-Patrol Vehicles 35,000 120,000 115,000 120,000 200,000 590,000 60 GF166 Mobile/Portable Radio Replacements - 337,500 351,000 - - 688,500 61 GF292 Mobile Data Terminal (MDTs) - 196,900 - - - 196,900 62 GF316 Police Body Camera System - 60,700 - - - 60,700 63 GF384 Police Substation - 25,000 - - - 25,000 Total $ 359,500 $ 993,200 $ 992,400 $ 393,700 $ 1,600,000 $ 4,338,800 Adopted FY26-30 Capital Improvement Plan Page 57 of 383 76 Patrol Vehicle Replacements (GF053) FUND DEPARTMENT PROJECT TYPE General Fund Police Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $2,777,700 Total Scheduled Project Cost $2,777,700 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community DESCRIPTION OF PROJECT The project replaces patrol vehicles every five years to ensure a reliable and safe fleet for law enforcement operations. Upgrading to newer models improves fuel efficiency and incorporates the latest safety features. The planned replacement cycle helps maintain operational readiness and extends the lifespan of the fleet. CONSEQUENCES OF DELAYING PROJECT Regular replacement reduces maintenance costs and minimizes downtime, enabling officers to respond quickly to emergencies. Failure to replace patrol vehicles on a regular schedule could result in significant safety issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $1,100,100 $324,500 $253,100 $526,400 $273,700 $1,400,000 Adopted FY26-30 Capital Improvement Plan Page 58 of 383 77 Non-Patrol Vehicles (GF052) FUND DEPARTMENT PROJECT TYPE General Fund Police Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $590,000 Total Scheduled Project Cost $590,000 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community DESCRIPTION OF PROJECT This project includes primarily Detective and other civilian vehicle replacements such as Animal Control and Crash Investigation. The majority of these vehicles are over ten years old and are driven on a daily basis. The proposed replacement schedule allows the department to maintain a reliable fleet for emergency call outs and daily response. CONSEQUENCES OF DELAYING PROJECT Failure to replace non-patrol vehicles on a regular schedule increases maintenance costs and could result in safety and reliability issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY 27-28 changes reflect the need to replace our Animal Control truck in FY27 and our Evidence Processing truck in FY28. The additional request in FY 29 is for a side-by-side electric patrol vehicle for downtown events and other special needs. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $70,000 $35,000 $120,000 $115,000 $120,000 $200,000 Adopted FY26-30 Capital Improvement Plan Page 59 of 383 78 Mobile/Portable Radio Replacements (GF166) FUND DEPARTMENT PROJECT TYPE General Fund Police Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary $688,500 Total Scheduled Project Cost $688,500 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community DESCRIPTION OF PROJECT The Bozeman Police Department uses portable radios as the primary tool for communications during their workday, including normal and emergency situations. Portable radios are essential for officer safety and for providing real time information as events happen and is one of the most important pieces of equipment used by officers. The useful life of a portable radio is estimated to be approximately ten years. CONSEQUENCES OF DELAYING PROJECT Failure to replace portable radios when they reach end of life cycle will reduce the effectiveness of communication at the department, and could result in officer safety issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $337,500 $351,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 60 of 383 79 Mobile Data Terminal (MDTs) (GF292) FUND DEPARTMENT PROJECT TYPE General Fund Police Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary $196,900 Total Scheduled Project Cost $196,900 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community DESCRIPTION OF PROJECT The mobile data terminal ("MDT") is a critical component in all patrol vehicles. This mobile computer mounted in the vehicle allows officers to see information about current calls for service, look up and retrieve critical data, enter call related data, and print forms and citations. This plan aligns with the 5-year vehicle replacement schedule and end of MDT warranty. CONSEQUENCES OF DELAYING PROJECT Failure to replace MDTs when they reach end of life cycle will reduce the effectiveness of the department, and could result in officer safety issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $196,900 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 61 of 383 80 Police Body Camera System (GF316) FUND DEPARTMENT PROJECT TYPE General Fund Police Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary $60,700 Total Scheduled Project Cost $60,700 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community DESCRIPTION OF PROJECT Body worn cameras (BWC) have become a vital tool for the Bozeman Police Department in terms of both investigation and transparency. The City fully implemented the BWC system in 2022 and anticipate the need to replace cameras every five years as the technology advances. CONSEQUENCES OF DELAYING PROJECT BWCs that fail and lag new technology result in issues with image quality and download capabilities. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $60,700 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 62 of 383 81 Police Substation (GF384) FUND DEPARTMENT PROJECT TYPE General Fund Police Infrastructure OPERATING IMPACT COST ESTIMATE CLASS High Class 5 FUNDING SOURCE(S) AMOUNT Discretionary $25,000 Total Scheduled Project Cost $25,000 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community DESCRIPTION OF PROJECT This project will establish a smaller office-type location on the west side for officers to work during shift assignments. As the city expands westward, this additional location will be essential to improve response times and accommodate departmental growth. A larger substation, budgeted in unscheduled for $15.5 million, would likely be funded through a future mill levy, serving as a more permanent base for officers. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include insufficient space at Bozeman Public Saftey Center and slower response times to the west portions of Bozeman. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project was originally planned as part of the Bozeman Community Center Bond. Since the bond was not added to the ballot, this project is added separately to the CIP. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $25,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 63 of 383 82 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 64 of 383 83 Scheduled Projects for Parks & Recreation Department (General Fund only) Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 66 GF364 Bulkhead at Swim Center $ 325,000 $ -$ -$ -$ -$ 325,000 67 GF388 Story Mill Community Center Improvements - - 131,600 - - 131,600 68 GF116 Cemetery Vehicle Replacement 90,000 - - - - 90,000 69 GF083 Cemetery Backhoe - 128,000 - - - 128,000 70 GF252 Cemetery Columbariums - - 60,000 - - 60,000 71 GF268 Southwest Montana Veteran's Cemetery - - - - 400,000 400,000 Total $ 415,000 $ 128,000 $ 191,600 $ -$ 400,000 $ 1,134,600 Adopted FY26-30 Capital Improvement Plan Page 65 of 383 84 Bulkhead at Swin Center (GF364) FUND DEPARTMENT PROJECT TYPE General Fund Recreation Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $325,000 Total Scheduled Project Cost $325,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Addition of a commercially designed and manufactured bulkhead to the Swim Center. A bulkhead is a barrier that would be placed at the center of the pool, creating one 25-meter pool and one 25- yard pool. A bulkhead would provide for enhanced programming of the current facility by forming 16 lap lanes instead of 8. The lanes would be shorter but would allow for more versatile programming. In addition, a 25-yard pool would be created, making it possible to host 25-yard swim meets at the facility. A commercial bulkhead is being recommended if the current bulkhead cannot be redesigned in a fashion that it does not damage the pool. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying this project are likely to include continued operational limitations, maintenance challenges, decreased community satisfaction, and higher installation costs if costs for materials and labor continue to rise. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Project has been moved up from unscheduled as it has been identified as a high-priority project to meet critical community needs. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $325,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 66 of 383 85 Story Mill Community Center Improvements (GF388) FUND DEPARTMENT PROJECT TYPE General Fund Recreation Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $131,600 Total Scheduled Project Cost $131,600 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Per Facility Condition Assessment (FCA) recommendations, the log-look wood siding that is wearing off and fading on the exterior of the Story Mill Community Center should be repaired and refinished. CONSEQUENCES OF DELAYING PROJECT The integrity of the siding will be impacted as the existing finish continues to wear off. This could result in a full replacement of the siding and a much more costly project. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project was newly identified as an FY28 need as part of the Facility Condition Assessment (FCA) completed in 2023. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $131,600 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 67 of 383 86 Cemetery Vehicle Replacement (GF116) FUND DEPARTMENT PROJECT TYPE General Fund Cemetery Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $90,000 Total Scheduled Project Cost $90,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT The Cemetery utilizes three, one-ton pickups used in burial operations, plowing, and routine maintenance. This CIP project accounts for replacements of aging vehicles. This truck replaces the 2006 one ton. CONSEQUENCES OF DELAYING PROJECT Continued use of aging fleet with less predictability and efficiency of burial, maintenance, and plowing tasks. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Increased anticipated cost from $65,000 to $90,000 for the addition of plow package and dump bed. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $90,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 68 of 383 87 Cemetery Backhoe (GF083) FUND DEPARTMENT PROJECT TYPE General Fund Cemetery Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $128,000 Total Scheduled Project Cost $128,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This piece of equipment would replace the current Cemetery backhoe that is used for burials on an average of two times per week. This is the main piece of equipment utilized for cemetery burials. CONSEQUENCES OF DELAYING PROJECT Delaying the project would require continuing to utilize the existing backhoe for burial operations, which may decrease efficiency due to mechanical breakdowns due to age of the machine and yearly wear and tear. May be able to borrow the Forestry backhoe in an emergency situation. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The anticipated cost has increased from $120K to $128K as per fleet management. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $128,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 69 of 383 88 Cemetery Columbariums (GF252) FUND DEPARTMENT PROJECT TYPE General Fund Cemetery Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Discretionary $60,000 Total Scheduled Project Cost $60,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project accounts for the purchase of an additional columbarium to the Sunset Hills Cemetery. Currently, there are 31 niches left available out of 80 total niches. CONSEQUENCES OF DELAYING PROJECT A columbarium is a valuable addition to a cemetery as it caters to a diverse range of preferences and provides a space-efficient, cost-effective, and environmentally conscious alternative to traditional burial, while also generating revenue and offering a place for lasting memorialization. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $60,000 $0 $0 $60,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 70 of 383 89 Southwest Montana Veteran's Cemetery (GF268) FUND DEPARTMENT PROJECT TYPE General Fund Cemetery Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $400,000 Total Scheduled Project Cost $400,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT The Southwest Montana Veteran’s Cemetery will be a nationally recognized cemetery where honorably discharged veterans and their spouses can be interred at a very low cost to families. To date, completed contruction includes a three-tiered retaining wall, sidewalk, stairs and handrails leading upto the plaza area. Currently, construction is underway to complete the plaza area, cement footers, and the addition of a two hundred and forty niche columbarium (large size columbarium is projected to cost $525,000). Completion of this phase will allow initial interments of urns. The following phase will complete an area for an in-ground ash burial option. CONSEQUENCES OF DELAYING PROJECT Every consequence of delaying the build out of the remaining four columbaria are not known but would limit internment capacity for local veterans in the future. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $0 $0 $0 $0 $0 $400,000 Adopted FY26-30 Capital Improvement Plan Page 71 of 383 90 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 72 of 383 91 Scheduled Projects for Sustainability Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 74 GF362 Solar Panel Arrays $ 641,100 $ -$ -$ -$ -$ 641,100 75 GF353 Electric Vehicle (EV) Stations - 64,000 66,500 69,200 72,000 271,700 Total $ 641,100 $ 64,000 $ 66,500 $ 69,200 $ 72,000 $ 912,800 Adopted FY26-30 Capital Improvement Plan Page 73 of 383 92 Solar Panel Arrays (GF362) FUND DEPARTMENT PROJECT TYPE General Fund Sustainability Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Discretionary $641,100 Total Scheduled Project Cost $641,100 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT The Bozeman Climate Plan calls for 100% net clean electricity for City operations by 2025 (Action 2.F.1). This project will allow the City to install solar arrays at the Story Mill Community Center (FY25), the Bozeman Public Library (FY25), City Hall (FY26), the Professional Building (FY26), and Vehicle Maintenance (FY26), resulting in economic and environmental benefits for the community. CONSEQUENCES OF DELAYING PROJECT With rising electricity costs and the availability of renewable energy tax credits to local governments, it is a strategic time to invest in solar electricity. This project supports the City Commission’s priorities to promote a sustainable environment and 100% net clean electricity for City operations. If this project is not approved or delayed, it will slow progress toward our goals and result in higher long-term electricity costs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $232,600 $641,100 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 74 of 383 93 Electric Vehicle (EV) Stations (GF353) FUND DEPARTMENT PROJECT TYPE General Fund Sustainability Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 2 FUNDING SOURCE(S) AMOUNT Discretionary & Grants $271,700 Total Scheduled Project Cost $271,700 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT The Bozeman Climate Plan calls for EV infrastructure for the public (Action 4.K.2) and the City fleet (action 4.K.3) to reduce transportation emissions. This project will allow for the purchase, installation, 5-year network subscription, and 5-year maintenance agreement for 3, dual-port, level 2 charging stations per fiscal year from FY27-FY30 at high-priority locations to serve the City fleet and public. CONSEQUENCES OF DELAYING PROJECT Lack of planning and investment in EV infrastructure will slow the transition to less polluting, low-carbon vehicles for the City fleet and hinder the equitable deployment of EV charging infrastructure for the public. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project is new to the CIP, in response to the growth of EVs in the community and the City fleet. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 General Fund $90,000 $0 $64,000 $66,500 $69,200 $72,000 Adopted FY26-30 Capital Improvement Plan Page 75 of 383 94 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 76 of 383 95 GENERAL GOVERNMENT Adopted FY26-30 Capital Improvement Plan Page 77 of 383 96 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 78 of 383 97 COMMUNITY DEVELOPMENT PLANNING Adopted FY26-30 Capital Improvement Plan Page 79 of 383 98 Planning Fund Scheduled Projects Planning Fund Unscheduled Projects No unscheduled projects. Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 81 CD08 Community Development Office Reconfiguration $ 25,000 $ -$ -$ -$ -$ 25,000 82 GF277 ERP Replacement/Upgrade - 67,500 - - - 67,500 Total $ 25,000 $ 67,500 $ -$ -$ -$ 92,500 Adopted FY26-30 Capital Improvement Plan Page 80 of 383 99 Community Development Office Reconfiguration (CD08) FUND DEPARTMENT PROJECT TYPE Planning Fund Community Development Other OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Permit Fees $50,000 Total Scheduled Project Cost $50,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The proposed office reconfiguration includes two components: (1) Cubicle reconfiguration and furniture replacement to create additional workspaces for 3 new positions budgeted for FY25 and FY26. (2) Reconfiguration of the public lobby space to provide additional computer stations where review staff can assist members of the public without occupying conference rooms. CONSEQUENCES OF DELAYING PROJECT If the project is delayed, we will not have a work station for one of the newly budgeted positions. Additionally, lack of public computer stations will continue to create need for conference room space, which can conflict with internal staff meeting needs in the building. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This funding was originally approved in FY24, but the project was delayed due to leadership changes. Community Development is requesting the same funding for FY26, as the need for reconfiguration remains the same. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Planning Fund $0 $25,000 $0 $0 $0 $0 Building Inspection Fund $0 $25,000 $0 $0 $0 $0 Total $0 $50,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 81 of 383 100 Enterprise Resource Planning (ERP) Replacement/Upgrade (GF277) FUND DEPARTMENT PROJECT TYPE Planning Fund Community Development Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Permit Fees Interfund Transfers Discretionary $135,000 $600,000 $420,000 Total Scheduled Project Cost $1,155,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Placeholder for examination of current ERP system and replacement/upgrade. An ERP replacement/upgrade involves careful planning, resource allocation, and coordination including assigning a project team and project manager and ensuring adequate financial and personnel resources and IT infrastructure. CONSEQUENCES OF DELAYING PROJECT Delaying the project may lead to operational inefficiencies, higher costs, limited integration, and security risks. Additionally, postponement risks hindering necessary updates and hardware/software maintenance in the case that the current system reaches end-of-life status. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Planning Fund $0 $0 $67,500 $0 $0 $0 Building Inspection Fund $0 $0 $67,500 $0 $0 $0 Public Works Administration $0 $0 $600,000 $0 $0 $0 General Fund $0 $0 $420,000 $0 $0 $0 Total $0 $0 $1,155,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 82 of 383 101 PUBLIC SAFETY Adopted FY26-30 Capital Improvement Plan Page 83 of 383 102 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 84 of 383 103 COMMUNITY DEVELOPMENT BUILDING INSPECTION Adopted FY26-30 Capital Improvement Plan Page 85 of 383 104 Building Inspection Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 87 BI07 Building Vehicle $ 54,100 $ -$ -$ -$ -$ 54,100 88 CD08 Community Development Office Reconfiguration 25,000 - - - - 25,000 89 GF277 ERP Replacement/Upgrade - 67,500 - - - 67,500 Total $ 79,100 $ 67,500 $ -$ -$ -$ 146,600 Building Inspection Fund Unscheduled Projects No unscheduled projects. Adopted FY26-30 Capital Improvement Plan Page 86 of 383 105 Building Vehicle (BI07) FUND DEPARTMENT PROJECT TYPE Building Inspection Fund Community Development Vehicle OPERATING IMPACT COST ESTIMATE CLASS Moderate N/A FUNDING SOURCE(S) AMOUNT Permit Fees $54,100 Total Scheduled Project Cost $54,100 STRATEGIC PLAN, IF APPLICABLE 3. A Safe, Welcoming Community This project will replace a building inspector vehicle in FY26. The existing vehicle is 10 years old. CONSEQUENCES OF DELAYING PROJECT Increased expense to maintain older vehicles would likely result from the delay of this project. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Building Inspection Fund $0 $54,100 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 87 of 383 106 Community Development Office Reconfiguration (CD08) FUND DEPARTMENT PROJECT TYPE Building Inspection Fund Community Development Other OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Permit Fees $25,000 Total Scheduled Project Cost $25,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The proposed office reconfiguration includes two components: (1) Cubicle reconfiguration and furniture replacement to create additional work spaces for 3 new positions budgeted for FY25 and FY26. (2) Reconfiguration of the public lobby space to provide additional computer stations where review staff can assist members of the public without occupying conference rooms. CONSEQUENCES OF DELAYING PROJECT If the project is delayed, we will not have a work station for one of the newly budgeted positions. Additionally, lack of public computer stations will continue to create need for conference room space, which can conflict with internal staff meeting needs in the building. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This funding was originally approved in FY24, but the project was delayed due to leadership changes. Community Development is requesting the same funding for FY26, as the need for reconfiguration remains the same. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Building Inspection Fund $0 $25,000 $0 $0 $0 $0 Planning Fund $0 $25,000 $0 $0 $0 $0 Total $0 $50,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 88 of 383 107 Enterprise Resource Planning (ERP) Replacement/Upgrade (GF277) FUND DEPARTMENT PROJECT TYPE Building Inspection Fund Community Development Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Permit Fees Interfund Transfers Discretionary $135,000 $600,000 $420,000 Total Scheduled Project Cost $1,155,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Placeholder for examination of current ERP system and replacement/upgrade. An ERP replacement/upgrade involves careful planning, resource allocation, and coordination including assigning a project team and project manager and ensuring adequate financial and personnel resources and IT infrastructure. CONSEQUENCES OF DELAYING PROJECT Delaying the project may lead to operational inefficiencies, higher costs, limited integration, and security risks. Additionally, postponement risks hindering necessary updates and hardware/software maintenance in the case that the current system reaches end-of-life status. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Building Inspection Fund $0 $0 $67,500 $0 $0 $0 Planning Fund $0 $0 $67,500 $0 $0 $0 Public Works Administration $0 $0 $600,000 $0 $0 $0 General Fund $0 $0 $420,000 $0 $0 $0 Total $0 $0 $1,155,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 89 of 383 108 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 90 of 383 109 FIRE CAPITAL & EQUIPMENT Adopted FY26-30 Capital Improvement Plan Page 91 of 383 110 Fire Department Capital & Equipment Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 94 FE12 Personal Protective Equipment $ 56,700 $ 59,500 $ 62,400 $ 65,600 $ 68,300 $ 312,500 95 FE18 Light Duty Vehicles 50,000 275,000 60,000 - - 385,000 96 FE28 Vehicle Lift 45,000 - - - - 45,000 97 FE20 Fire Engine Replacement - 2,200,000 - - - 2,200,000 98 FE06 Radio Replacement Program - 700,000 - - - 700,000 99 FE15 Cardiac Monitor Replacement - 500,000 - - - 500,000 100 FE27 Station 3 Bay Doors - 295,000 - - - 295,000 101 FE10 Self-Contained Breathing Apparatus (SCBA) - - 550,000 - - 550,000 Total $ 151,700 $ 4,029,500 $ 672,400 $ 65,600 $ 68,300 $ 4,987,500 Fire Department Capital & Equipment Fund Unscheduled Projects Project Code Project Name Amount Description FE20 Fire Engine Replacement $2,000,000 The City took delivery of two, new fire engines in FY24, however with supply chain and order back logs, the City will need to consider ordering the replacements for these apparatus in FY32 or 33 in order to receive them at the anticipated end of the life for the current engines which will be FY35 or FY36. FE16 Extrication Tools 225,000 Extrication tools are used to rescue citizens who are trapped in motor vehicle accidents, heavy machinery incidents, building collapses, etc. Extrication tools should be replaced every 10 years and require annual maintenance, service, and inspection to ensure proper operation. The current tools were purchased in FY21 and the planned replacement for these tools is FY31. FE25 Wildland Personal Protective Equipment (PPE) 95,000 Wildland PPE differs from standard PPE as it is specifically made for wildland fires, similar to how structural gear is designed for structural firefighting. Current gear was purchased in 2018 via a FEMA Assistance to Firefighter Grant and will be at the end of its recommended service life in FY31. Total $2,320,000 Adopted FY26-30 Capital Improvement Plan Page 92 of 383 111 Map of Fire Department Capital & Equipment Fund Infrastructure Project Adopted FY26-30 Capital Improvement Plan Page 93 of 383 112 Personal Protective Equipment (FE12) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Equipment OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Voted Mill $312,500 Total Scheduled Project Cost $312,500 STRATEGIC PLAN, IF APPLICABLE 7.2 a) Be a "Best in Class" Employer DESCRIPTION OF PROJECT Today, each member of the Bozeman Fire Department is issued two sets of personal protective equipment (PPE), a primary and a backup set. The National Fire Protection Association (NFPA) and manufacturer guidelines recommend that PPE used by firefighters, often referred to as turnout gear, be replaced every 10 years due to the breakdown of the protective fibers that are used to make the gear. Presently the fire department purchases gear on a rotating cycle so that a firefighters primary gear is 0-5 years old and their back-up gear is 6-10 years old. CONSEQUENCES OF DELAYING PROJECT PPE becomes inoperable at 10 years due to fiber breakdown. Failure to replace out of date PPE could result in hazardous conditions for Firefighters. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $54,000 $56,700 $59,500 $62,400 $65,600 $68,300 Adopted FY26-30 Capital Improvement Plan Page 94 of 383 113 Light Duty Vehicles (FE18) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $385,000 Total Scheduled Project Cost $385,000 STRATEGIC PLAN, IF APPLICABLE 3.1 Public Safety DESCRIPTION OF PROJECT The City plans to add a Quick Response Vehicle (QRV) in FY25 in addition to a rechassis of brush 1. FY26 includes a replacment of one light duty vehicle. FY27 amounts include the replacement of a light duty vehicle and addition of Incident Command Trailer that would be used by both police and fire. FY28 includes the replacement of one light duty vehicle. CONSEQUENCES OF DELAYING PROJECT Increased maintenance costs and down time for existing vehicles is likely result in the delay of this project. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY27 has the addition of a new incident command trailer to be shared by Fire Department and Police Department. The departments have relied on the Gallatin County Sheriff’s Office to bring out the 6CV incident command vehicle that is reaching its end of life with no immediate plans for replacement. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $230,000 $50,000 $275,000 $60,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 95 of 383 114 Vehicle Lift (FE28) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $45,000 Total Scheduled Project Cost $45,000 STRATEGIC PLAN, IF APPLICABLE 3.1 Public Safety DESCRIPTION OF PROJECT This is a portable lift for the new fire department mechanic position that is approved in the FY26 staffing plan. The lift can be moved from one fire station to another to lift fire department vehicles that require servicing. CONSEQUENCES OF DELAYING PROJECT Without this lift, the new fire department mechanic will not have a lift for servicing the fire department apparatus and will have to que up for lift time at City shops which prohibits the mechanic from servicing the apparatus in the stations, thus delaying repairs or service that needs to be completed to keep fire apparatus in service. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project was added to the capital plan during the 2025 Biennium Budget process. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $0 $45,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 96 of 383 115 Fire Engine Replacement (FE20) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $2,200,000 Total Scheduled Project Cost $2,200,000 STRATEGIC PLAN, IF APPLICABLE 3.1 Public Safety DESCRIPTION OF PROJECT The current 2013 ladder truck will be reaching end of service life as a front line apparatus and will serve as reserve apparatus for the next 12-15 years. This new ladder truck will be located at the new Fire Station 2 with the quick response vehicle (QRV) to reduce the overall use and demand of the ladder truck. The new ladder truck was ordered in June 2024, however delivery will not occur until FY27 due to supply chains issues and order backlogs. The City leveraged group purchasing, similar to the process used for the two new fire engines that were delivered in August of 2023. CONSEQUENCES OF DELAYING PROJECT Maintenance cost and down time increase if the replacement is delayed. The current ladder truck has already experienced a significant recall, a major ladder repair, and a complete engine rebuild. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $0 $0 $2,200,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 97 of 383 116 Radio Replacement Program (FE06) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $700,000 Total Scheduled Project Cost $700,000 STRATEGIC PLAN, IF APPLICABLE 3.1 d) Update Public Safety Technology Systems DESCRIPTION OF PROJECT The Fire Department sourced mobile / portable radios from Motorola utilizing a group purchasing contract that was completed in 2016. Radios must be replaced every ten years to ensure support for hardware and software. This project accounts for all radio replacements within the Fire Department. CONSEQUENCES OF DELAYING PROJECT Reliable radios are essential to Fire Department operations and are used to communicate during critical events. Failing to replace radios on a regular schedule will result in increased maintenance cost of existing radios and an increase in down time which impacts the fire departments ability to communicate during emergenices. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $0 $0 $700,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 98 of 383 117 Cardiac Monitor Replacement (FE15) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $500,000 Total Scheduled Project Cost $500,000 STRATEGIC PLAN, IF APPLICABLE 7.2 a) Be a "Best in Class" Employer DESCRIPTION OF PROJECT Cardiac monitors are used to provide life saving medical treatments to community members. The Fire Department has seven cardiac monitors that must be replaced every seven years to stay under a maintenance and service agreement with the vendor years. CONSEQUENCES OF DELAYING PROJECT Failing to replace cadriac monitors on a regular schedule could result in citizens not receiving necessary life saving medical treatment. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project should have been moved from unscheduled to FY27 during the previously adopted CIP. Cardiac monitors will reach the end of their service life in FY27, and the vendor will no longer provide service, repairs, or upgrades to our cardiac monitors. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $0 $0 $500,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 99 of 383 118 Station 3 Bay Doors (FE27) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $295,000 Total Scheduled Project Cost $295,000 STRATEGIC PLAN, IF APPLICABLE 3.1 Public Safety DESCRIPTION OF PROJECT Replacement of existing front bay doors at Fire Station 3. CONSEQUENCES OF DELAYING PROJECT The existing doors at Station 3 are experiencing numerous maintenance issues and downtime. By FY27 they will be 20 years old and due for replacement or major repairs. The intention of this project is to mirror the doors at other stations for maintenance and operational efficiency. If the exsisting doors remain in place, maintenance cost and downtime increase. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $0 $0 $295,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 100 of 383 119 Self-Contained Breathing Apparatus (SCBA) (FE10) FUND DEPARTMENT PROJECT TYPE Fire Department Equipment Fire Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Voted Mill $550,000 Total Scheduled Project Cost $550,000 STRATEGIC PLAN, IF APPLICABLE 7.2 a) Be a "Best in Class" Employer DESCRIPTION OF PROJECT SCBA are worn by the firefighters for respiratory protection when in immediately dangerous to life and health (IDLH) environments as required by OSHA. The anticipated life span of a SCBA is 10-12 years. The department last purchased SCBAs in 2017. SCBAs require annual maintenance by a licensed third party, and should be replaced every 10-12 years. This purchase would be for new SCBA including frames, bottles, facepiece, and regulators. CONSEQUENCES OF DELAYING PROJECT Failing to replace SCBA equipment on a regular schedule could result in a risk to the life and health of firefighters. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Fire Department Equipment $0 $0 $0 $550,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 101 of 383 120 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 102 of 383 121 PARKING Adopted FY26-30 Capital Improvement Plan Page 103 of 383 122 Parking Fund Scheduled Projects Parking Fund Unscheduled Projects Project Code Project Name Amount Description P036 Bridger Garage Roof $1,800,000 This project builds a roof for the Bridger Garage. An analysis of the Bridger Parking Garage revealed the possibility of adding a roof without the need for additional reinforcing footers. This new roof could incorporate solar panels to generate power for the garage, potentially reducing costs, especially if electric vehicle chargers are installed. The City hopes to collaborate with the Downtown Partnership and other stakeholders before scheduling this project. P024 Black Lot Improvements 801,800 Improvements to the Black Lot have been a long-term goal of the parking program to create a more welcoming environment and ensure parking lots are built up to our development code. Project has been moved to unscheduled due to current funding constraints. P2601 Willson Lot Redesign 300,000 This project will improve the parking lot layout, set-backs, landscaping, signage, lighting, required Stormwater treatment infrastructure requirements, and parking kiosk. This project is unscheduled due to current funding constraints. Total $2,901,800 Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 106 P017 Rouse Lot Improvements $ 170,500 $ -$ -$ -$ -$ 170,500 107 P030 Mobile License Plate Recognition (LPR) - 35,000 170,000 - - 205,000 108 P033 Enforcement Vehicle Replacement - 35,000 - 37,000 - 72,000 Total $ 170,500 $ 70,000 $ 170,000 $ 37,000 $ -$ 447,500 Adopted FY26-30 Capital Improvement Plan Page 104 of 383 123 Map of Parking Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 105 of 383 124 Rouse Lot Improvements (P017) FUND DEPARTMENT PROJECT TYPE Parking Fund Parking Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Permit Fees & Fines $170,500 Total Scheduled Project Cost $170,500 STRATEGIC PLAN, IF APPLICABLE 4.4 Vibrant Downtown, Districts & Centers DESCRIPTION OF PROJECT This project willl replace the asphalt in the Rouse lot. The City Commission has updated the project cost budget due to its impact on the Daylighting project for Bozeman Creek. Consequently, the scope will now focus solely on a mill and overlay of the surface lot. CONSEQUENCES OF DELAYING PROJECT Continued deterioration of the pavement in the lot, higher costs driven by rising construction costs, and continued inconvenient use of space in the lot which makes it difficult for users to access spots. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET With the adoption of the 2025 Biennium Budget, the City Commission reduced the budget for this project by $400k. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parking Fund $0 $170,500 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 106 of 383 125 Mobile License Plate Recognition (LPR) (P030) FUND DEPARTMENT PROJECT TYPE Parking Fund Parking Equipment OPERATING IMPACT COST ESTIMATE CLASS None Class 1 FUNDING SOURCE(S) AMOUNT Fines $205,000 Total Scheduled Project Cost $205,000 STRATEGIC PLAN, IF APPLICABLE 3.1 d) Update Public Safety Technology Systems DESCRIPTION OF PROJECT License Plate Recognition (LPR) is a technology that uses character recognition to read vehicle registration plates. The Parking Department utilizes this technology to enforce City ordinances. The LPR that is currently used on the parking enforcement vehicles reaches its end of life in FY28 and needs to be replaced with the newest LPR hardware. CONSEQUENCES OF DELAYING PROJECT Delaying this project will inevitably increase the overall cost of parking enforcement. LPR technology greatly increases operational efficiency, decreases maintenance costs, and mitigates potential security vulnerabilities. Failing to update to the latest hardware could slow down enforcement and prevent us from accessing new software updates. We should expect to replace this hardware every five to seven years. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. This project is a valuable addition to the CIP, driven by our expanding fleet's need for LPR technology to effectively enforce parking regulations throughout the city. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parking Fund $0 $0 $35,000 $170,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 107 of 383 126 Enforcement Vehicle Replacement (P033) FUND DEPARTMENT PROJECT TYPE Parking Fund Parking Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Fines & Permit Fees $72,000 Total Scheduled Project Cost $72,000 STRATEGIC PLAN, IF APPLICABLE 4.4 Vibrant Downtown, Districts & Centers DESCRIPTION OF PROJECT The Parking department has four enforcement vehicles which are scheduled for regular replacement every 8 years. One vehicle is scheduled for replacement every two years. The vehicles planned for purchase are hybrid Toyota Rav-4's. CONSEQUENCES OF DELAYING PROJECT Parking enforcement officers rely on enforcement vehicles to ensure compliance with the City’s parking policies. Unreliable vehicles would cause inefficiencies and delays in daily enforcement. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Reduced the amount of funding needed for replacement vehicles based on the estimate from Vehicle Maintenance. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parking Fund $52,000 $0 $35,000 $0 $37,000 $0 Adopted FY26-30 Capital Improvement Plan Page 108 of 383 127 PUBLIC WORKS Adopted FY26-30 Capital Improvement Plan Page 109 of 383 128 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 110 of 383 129 PUBLIC WORKS ADMINISTRATION Adopted FY26-30 Capital Improvement Plan Page 111 of 383 130 Public Works Administration Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 113 GF277 ERP Replacement/Upgrade $ -$ 600,000 $ -$ -$ -$ 600,000 Total $ -$ 600,000 $ -$ -$ -$ 600,000 Public Works Administration Unscheduled Projects No unscheduled projects. Adopted FY26-30 Capital Improvement Plan Page 112 of 383 131 Enterprise Resource Planning (ERP) Replacement/Upgrade (GF277) FUND DEPARTMENT PROJECT TYPE Public Works Administration Public Service Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Interfund Transfers Discretionary Permit Fees $600,000 $420,000 $135,000 Total Scheduled Project Cost $1,155,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Placeholder for examination of current ERP system and replacement/upgrade. An ERP replacement/upgrade involves careful planning, resource allocation, and coordination including assigning a project team and project manager and ensuring adequate financial and personnel resources and IT infrastructure. CONSEQUENCES OF DELAYING PROJECT Delaying the project may lead to operational inefficiencies, higher costs, limited integration, and security risks. Additionally, postponement risks hindering necessary updates and hardware/software maintenance in the case that the current system reaches end-of-life status. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Public Works Administration $0 $0 $600,000 $0 $0 $0 General Fund $0 $0 $420,000 $0 $0 $0 Planning Fund $0 $0 $67,500 $0 $0 $0 Building Inspection Fund $0 $0 $67,500 $0 $0 $0 Total $0 $0 $1,155,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 113 of 383 132 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 114 of 383 133 SHOPS COMPLEX CONSTRUCTION Adopted FY26-30 Capital Improvement Plan Page 115 of 383 134 Shops Complex Construction Fund Scheduled Projects No scheduled projects. Shops Complex Construction Fund Unscheduled Projects Project Code Project Name Amount Description SHOPS Shops Complex $56,264,800 This project will complete planning, design, and construction of a consolidated and expanded facility capacity for Streets, Water, Sewer, Stormwater, Water Conservation, Parks, and Facilities operations. As identified through studies performed in 2020 and 2023, City operations have not maintained the pace of expansion and are limited by existing facility capacity. A proposed site for a consolidated campus for the above-referenced departments has been identified at the Bozeman Water Reclamation Facility. This project will select a consultant team to lead the City through the land development process and ultimately construct the campus. This project has been moved to unscheduled. City staff have identified the need to further explore and refine the project scope and funding mechanisms. Total $56,264,800 Adopted FY26-30 Capital Improvement Plan Page 116 of 383 135 SOLID WASTE Adopted FY26-30 Capital Improvement Plan Page 117 of 383 136 Solid Waste Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 121 SW65 Side Load Truck $ 475,000 $ -$ -$ -$ -$ 475,000 122 SW80 Storage Building 150,000 - - - - 150,000 123 SW81 Tote/Dumpster Wash Truck - 235,000 - - - 235,000 124 SW75 Front Load Truck - - 440,000 - - 440,000 121 SW64 Side Load Truck - - - 477,000 - 477,000 121 SW74 Side Load Truck - - - 477,000 - 477,000 121 SW76 Side Load Truck - - - - 477,000 477,000 Total $ 625,000 $ 235,000 $ 440,000 $ 954,000 $ 477,000 $ 2,731,000 Adopted FY26-30 Capital Improvement Plan Page 118 of 383 137 Solid Waste Unscheduled Projects Project Code Project Name Amount Description SW68 Truck Wash/Paint Booth $1,500,000 The Public Works Facilities Master Plan of 2020 identifies the need for a truck wash bay and paint booth. Currently, trucks are washed in the center of the indoor truck storage building. Issues include overspray which deposits debris on surrounding equipment near the wash area, and safety protocol requires personnel to stay clear of washing activity area. Currently, we have to repaint our commercial dumpsters. We perform this activity outdoors, so weather plays a major role in our ability to complete this task. Adding a proper paint facility would allow us to perform this activity year-round. Having proper ventilation, a clean location, and light would make the process more efficient. This item has been Unscheduled to reduce impact on rates. SW67 Heated Vehicle Storage 850,000 The Public Works Facilities Master Plan of 2020 calls out the need for expanding the heated vehicle storage building. This building is used for overnight parking of collection equipment to ensure seamless startup operation for completion routes. The expansion is due to the growth of the division which equates to adding additional equipment. This item has been Unscheduled to reduce impact on rates. SW77 Sideload Garbage Truck 477,000 Side load trucks are critical to complete residential garbage and recycling collection service. This plan accounts for the replacement of one side load truck in FY27, and one in FY28, and two in FY29. All replacements are based on a 6-year replacement schedule. A new side load truck for recycling collection is in this plan for FY26. This purchase will accommodate a second recycling route. With steady increase in customers each year, a new route will be critical to maintaining the recycling schedule. This item has been Unscheduled to reduce impact on rates. SW66 SWD Wash Building 400,000 The current headquarters for the Solid Waste Division is located at the old City of Bozeman landfill site, 2143 Story Mill Rd. The container wash building was identified in the 2020 Public Works Facility Master Plan. Currently the tote wash area and tote storage are within the equipment storage area using 1/3 of available equipment storage for tote maintenance needs. Building a separate tote wash building would postpone the need for additional truck storage. This item has been Unscheduled to reduce impact on rates. Total $3,227,000 Adopted FY26-30 Capital Improvement Plan Page 119 of 383 138 Map of Solid Waste Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 120 of 383 139 Side Load Truck- (SW65/SW64/SW74/SW76) FUND DEPARTMENT PROJECT TYPE Solid Waste Solid Waste Collection Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $1,906,000 Total Scheduled Project Cost $1,906,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Side load trucks are critical for residential garbage and recycling collection service. This plan accounts for the addition of one side load truck in FY26, replacement of two in FY29, and replacement of one in FY30. All replacements are based on a 6-year replacement schedule. An additional new side load truck for recycling collection is in this plan for FY26. This purchase will accommodate a second recycling route. With steady increase in customers each year, a new route will be critical to maintaining the recycling schedule The remaining FY29 and FY30 trucks will replace existing trucks on existing garbage collection routes. CONSEQUENCES OF DELAYING PROJECT Delay would lead to increased operating cost for vehicle maintenance to keep existing equipment in service and increased service disruption caused by inevitable downtime. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY26 anticipated cost (SW65) has been increased by $50,000 due to updated supplier pricing. SW64 anticipated cost moved from FY27 to FY29, SW74 anticipated cost moved from FY28 to FY29, and SW76 anticipated cost moved from FY29 to FY30 to assist with budget balancing. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Solid Waste $0 $475,000 $0 $0 $954,000 $477,000 Adopted FY26-30 Capital Improvement Plan Page 121 of 383 140 Storage Building (SW80) FUND DEPARTMENT PROJECT TYPE Solid Waste Solid Waste Collection Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $150,000 Total Scheduled Project Cost $150,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project would construct a cold storage building for all residential totes (garbage, recycling and organics). Currently, totes are strored in the heated equipment building consuming about 3,500 square feet of space. To accommodate the new organics program and the expected increase in totes and equipment, additional covered storage is required. CONSEQUENCES OF DELAYING PROJECT Containers can be stored in Conex Boxes, it would cost $70,000 for 13 conex boxes to get us to 4,800 sq ft of storage. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Anticipated cost for this new project has been included in FY26 to align with the rollout of the new organics program. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Solid Waste $0 $150,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 122 of 383 141 Tote/Dumpster Wash Truck (SW81) FUND DEPARTMENT PROJECT TYPE Solid Waste Solid Waste Collection Equipment OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $235,000 Total Scheduled Project Cost $235,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This equipment would be used to wash residential garbage, recycling and organic totes. It will also have the ability to wash front-load dumpsters. The Isuzu diesel chassis (25,950 GVWR) has a wash system mounted on the flatbed, 500-gallon water tank & 500-gallon wastewater tank. Department seeks long-term efficiencies in light of ongoing rate study results, scheduling this item would reduce operating costs spent on annual contractor service for this type of work. CONSEQUENCES OF DELAYING PROJECT Department would continue washing using the current system which only washes residential totes. Also continue to utilize tote wash company during busy summer months. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project is new to the capital plan and has been included in Fiscal Year 2027. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Solid Waste $0 $0 $235,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 123 of 383 142 Front Load Truck (SW75) FUND DEPARTMENT PROJECT TYPE Solid Waste Solid Waste Collection Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $440,000 Total Scheduled Project Cost $440,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project is necessary to replace vehicles for which age and condition will start causing excessive down time and repairs. Purchasing new trucks will allow us to continue providing effective front-loading dumpster collection services to our commercial and multi-family customers. As our customer base grows each year, our collection trucks are working longer per day and need to be dependable. CONSEQUENCES OF DELAYING PROJECT Delay would lead to reduced ability to meet demands of customer growth. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY28 anticipated cost increased by $10,000 due to updated supplier pricing. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Solid Waste $0 $0 $0 $440,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 124 of 383 143 LANDFILL POST-CLOSURE Adopted FY26-30 Capital Improvement Plan Page 125 of 383 144 Landfill Post Closure Scheduled Projects Landfill Post Closure Unscheduled Projects No unscheduled projects. Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 128 SW78 Cover System Improvements $ 351,500 $ -$ -$ -$ -$ 351,500 129 SW79 Lined Cell Landfill Gas System Completion - 700,000 - - - 700,000 130 SW73 Landfill SE LFG Wells - 101,000 - - - 101,000 Total $ 351,500 $ 801,000 $ -$ -$ -$ 1,152,500 Adopted FY26-30 Capital Improvement Plan Page 126 of 383 145 Map of Landfill Post-Closure Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 127 of 383 146 Cover System Improvements (SW78) FUND DEPARTMENT PROJECT TYPE Landfill Closure Costs Landfill Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $351,500 Total Scheduled Project Cost $351,500 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT Projects in the landfill post-closure fund are required to mitigate environmental impact to the community from closed landfill cells. The Cover System Improvements project is proposed to be completed on the lined and unlined cells to maintain the cover depth, reduce infiltration into the cells, and prevent the escape of methane gas. Soil will be placed in areas of settling, cracks, and areas exhibiting methane gas emissions during the 2023 gas sweep. Work will include soil procurement, hauling, placement, and restoration. CONSEQUENCES OF DELAYING PROJECT Failure to complete this project would result in noncompliance with State Department of Environmental Quality regulations and likely fines. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Landfill Closure Costs $0 $351,500 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 128 of 383 147 Lined Cell Landfill Gas System Completion (SW79) FUND DEPARTMENT PROJECT TYPE Landfill Closure Costs Landfill Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $700,000 Total Scheduled Project Cost $700,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT Projects in the landfill post-closure fund are required to mitigate environmental impact to the community from closed landfill cells. The Lined Cell Landfill Gas System Completion project is proposed to install a complete landfill gas well collection system on the lined cell. The project will include drilling and installing approximately 15 to 20 new landfill gas wells in the lined cell and connecting the new wells to the existing system and flare. Further monitoring following the FY23 installation of three new landfill gas wells in the lined cell will be used to determine the need for additional wells and the full scope of the project. CONSEQUENCES OF DELAYING PROJECT Failure to complete this project would result in noncompliance with State Department of Environmental Quality regulations and likely fines. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY27 anticipated cost has decreased by $87,400 after new cost estimate received from consultant. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Landfill Closure Costs $0 $0 $700,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 129 of 383 148 Landfill SE LFG Wells (SW73) FUND DEPARTMENT PROJECT TYPE Landfill Closure Costs Landfill Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 4 FUNDING SOURCE(S) AMOUNT Property Tax $101,000 Total Scheduled Project Cost $101,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT Projects in the landfill post-closure fund are required to mitigate environmental impact to the community from closed landfill cells. The southeast corner Landfill Gas Wells project is proposed to provide gas removal in areas of the landfill that are outside of the radius of influence of the existing landfill gas wells. The project will include drilling and installing three new landfill gas wells in the southeast corner of the landfill. These new wells will be connected to the existing landfill gas collection system and flare. This project will only be necessary if monitoring shows that the soil vapor wells installed in this area in FY24 are not effective at collecting enough landfill gas. CONSEQUENCES OF DELAYING PROJECT Failure to complete this project would result in noncompliance with State Department of Environmental Quality regulations and likely fines. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY27 anticipated cost has increased by $32,500 after new cost estimate received from consultant. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Landfill Closure Costs $0 $0 $101,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 130 of 383 149 STORMWATER Adopted FY26-30 Capital Improvement Plan Page 131 of 383 150 Stormwater Fund Scheduled Projects Stormwater Fund Unscheduled Projects Project Code Project Name Amount Description STDM19 Downtown Stormwater Capacity $650,000 Results of the Stormwater Facility Plan, scheduled to be completed in FY25, will recommend ways to increase capacity and improve water quality in the downtown area. Some recommendations may be addressed during projects that fall under Historic Pipe Replacement (STDM04), while this CIP item will address upgrades which are not associated with a pipe replacement project. The total anticipated project cost is $1,264,800 with the remainder scheduled in FY30. Total $650,000 Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 134 STOP08 Vacuum & Jetting Truck $ 650,000 $ -$ -$ -$ -$ 650,000 135 STDM04 Historic Pipe Replacement Program 535,400 100,000 613,800 110,000 675,500 2,034,700 136 STRM60 River Health - Mechanical Treatment - Peach 280,000 - - - - 280,000 137 STDM05 Annual Unplanned Pipe Rehabilitation 59,100 64,500 70,400 76,900 - 270,900 138 STOP03 Stormwater Vehicle (#01) - 48,000 - - - 48,000 139 STRM61 River Health - Mechanical Treatment - Tamarack - - 300,000 - - 300,000 140 STDM06 N 9th Ditch Rehab - - - 450,000 - 450,000 141 STDM19 Downtown Stormwater Capacity - - - - 614,800 614,800 142 STRM58 Operations Site Upgrade & Maintenance - - - - 176,400 176,400 Total $ 1,524,500 $ 212,500 $ 984,200 $ 636,900 $ 1,466,700 $ 4,824,800 Adopted FY26-30 Capital Improvement Plan Page 132 of 383 151 Map of Stormwater Fund Infrasture Projects Adopted FY26-30 Capital Improvement Plan Page 133 of 383 152 Vacuum & Jetting Truck (STOP08) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $650,000 Total Scheduled Project Cost $650,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project is for the replacement of the department's vacuum and jetting truck purchased in 2015. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the purchase of this truck will include down time for maintenance and reduced operational efficiency are possible consequences of delaying the project. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Funding for this project has been increased from $590,000 to $650,000 based on new EPA emissions requirements for Model Year 2027 heavy trucks, known as the Phase 3 Greenhouse Gas Rule. Cost to procure the truck will increase, but maintenance costs should decrease. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $650,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 134 of 383 153 Historic Pipe Replacement Program (STDM04) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $2,034,700 Total Scheduled Project Cost $2,034,700 STRATEGIC PLAN, IF APPLICABLE 2. An Innovative Economy DESCRIPTION OF PROJECT This project consists of annual rehabilitation of approximately 700 feet of 100-year-old vitrified clay stormwater sewer which has exceeded its life cycle, does not meet capacity standards, and includes many structural failures. CONSEQUENCES OF DELAYING PROJECT Waiting for pipe failure to replace pipes results in inefficient design, a patchwork of pipe sizes, and additional costs due to flooding when pipes collapse. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This item reflects a construction project every other year and now includes a larger amount for construction. Other remaining years reflect project design for the following year. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $156,000 $535,400 $100,000 $613,800 $110,000 $675,500 Adopted FY26-30 Capital Improvement Plan Page 135 of 383 154 River Health - Mechanical Treatment - Peach (STRM60) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 2 FUNDING SOURCE(S) AMOUNT Rate Revenue $280,000 Total Scheduled Project Cost $280,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project includes installation of a mechanical separator unit inline with the current stormwater main in Peach Street to improve the quality of stormwater discharge. The mechanical treatment will remove sediments, oils, greases, and other contaminants from the stormwater before discharge to the local watershed. Mechanical separators are typically installed in place of an existing manhole and use the flow of stormwater to screen and settle out particles. Pollutants are vacuumed out of the unit once or twice per year. The basin it will treat is 49 acres and developed prior to modern stormwater quality requirements. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include continued impacts to water quality and ability to comply with the City’s DEQ MS4 permit. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project was originally budgeted as Downtown Mech Storm Phase 3 (STRH01). Subsequently, it was split into two projects after design and bid resulted in high cost and difficult logistics of closing both Peach and Tamarack with STRH01 in the same year as construction on Mendenhall, Main, and Babcock. The original estimate for both projects was $300,000, but costs have increased due to local inflation of construction costs and the size of the units. Recent comparable projects installed 6-foot-diameter units, while hydraulic modeling determined that these need to be 8 feet. The larger size costs more, but also requires mobilization of larger equipment to deliver and install the units. The River Health – Mechanical Treatment – Tamarack project has the remaining costs included in FY26. That project is estimated to cost $300,000, resulting in a total increase to the CIP of $280,000. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $280,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 136 of 383 155 Annual Unplanned Pipe Rehabilitation (STDM05) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $270,900 Total Scheduled Project Cost $270,900 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project consists of an annual program that provides funding for the design and construction of unplanned pipe, drainage, and treatment projects to address failed infrastructure. CONSEQUENCES OF DELAYING PROJECT Budget amendments and extra time would be required to respond to issues. This could eventually be managed as reserve funding rather than an annual line item. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $54,100 $59,100 $64,500 $70,400 $76,900 $0 Adopted FY26-30 Capital Improvement Plan Page 137 of 383 156 Stormwater Vehicle (#01) (STOP03) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Vehicle OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $48,000 Total Scheduled Project Cost $48,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This item includes replacement of a 2000 Dodge Dakota with a modern, efficient light SUV or light truck. The truck has been in operation for 27 years and has served numerous divisions. CONSEQUENCES OF DELAYING PROJECT Stormwater Division has five administrative employees who share three dedicated vehicles. Breakdowns impact field operations and delay inspections. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $0 $48,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 138 of 383 157 River Health - Mechanical Treatment - Tamarack (STRM61) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 2 FUNDING SOURCE(S) AMOUNT Rate Revenue $300,000 Total Scheduled Project Cost $300,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project includes installation of a mechanical separator unit in line with the current stormwater main in Tamarack Street to improve the quality of stormwater discharge. The mechanical treatment will remove sediments, oils, greases, and other contaminants from the stormwater before discharge to the local watershed. Mechanical separators are typically installed in place of an existing manhole and use the flow of stormwater to screen and settle out particles. Pollutants are vacuumed out of the unit once or twice per year. The basin it will treat is 75 acres and developed prior to modern stormwater quality requirements. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include continued impacts to water qualityand ability to comply with the City’s DEQ MS4 permit. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project was originally budgeted as Downtown Mech Storm Phase 3 (STRH01). Subsequently, it was split into two projects after design and bid resulted in high cost and logistic difficulties. The original estimate for both projects was $300,000, but costs have increased due to local inflation of construction costs and the size of the units. Recent comparable projects installed 6-foot-diameter units, while hydraulic modeling determined that these need to be 8 feet. The larger size costs more, but also requires mobilization of larger equipment to deliver and install the units. The River Health – Mechanical Treatment – Tamarack project has the remaining costs included in FY26. The River Health – Mechanical Treatment – Peach project has the remaining costs included in FY26. That project is estimated to cost $280,000, resulting in a total increase to the CIP of $280,000. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $0 $0 $300,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 139 of 383 158 N 9th Ditch Rehab (STDM06) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $450,000 Total Scheduled Project Cost $450,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project consists of design and rehabilitation of 900 feet of stormwater surface conveyance located near North 9th Avenue from West Villard Street to West Peach Street. The ditch conveys stormwater generated from a 142-acre urban drainage basin and includes a vegetated swale that has experienced significant degradation. Specific issues include sediment deposition, overgrown vegetation, and bank erosion. CONSEQUENCES OF DELAYING PROJECT Delaying the project will increase the risk of flooding. This project now aligns with a sanitary sewer rehab project, gaining efficiency in planning and construction. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Moved from unscheduled to FY29 to align with WW140 project, North 9th Avenue, West Villard Street, and South 9th Avenue Sewer Main Replacement. Cost estimates increased by $325K due to originally being a conceptual estimate from 2017. The current estimate is based on the actual linear feet of pipe that would be required to pipe this conveyance. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $0 $0 $0 $450,000 $0 Adopted FY26-30 Capital Improvement Plan Page 140 of 383 159 Downtown Stormwater Capacity (STDM19) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $614,800 Total Scheduled Project Cost $614,800 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Results of the Stormwater Facility Plan, scheduled to be completed in FY25, will recommend ways to increase capacity and improve water quality in the downtown area. Some recommendations may be addressed during projects that fall under Historic Pipe Replacement (STDM04), while this CIP item will address upgrades which are not associated with a pipe replacement project. The total anticipated project cost is $1,264,800 with the remainder expected to be spent after FY30. CONSEQUENCES OF DELAYING PROJECT Delaying the project could lead to continued or increased impacts to water quality and quantity. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project has been consolidated from FY28 and FY29 into one project in FY30 with a more specific design which is detailed in the current draft of the Stormwater Facilities Plan Update, anticipated to be adopted in Spring 2025. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $0 $0 $0 $0 $614,800 Adopted FY26-30 Capital Improvement Plan Page 141 of 383 160 Operations Site Upgrade & Maintenance (STRM58) FUND DEPARTMENT PROJECT TYPE Stormwater Stormwater Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $176,400 Total Scheduled Project Cost $176,400 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT Upgrade one City site where operations and/or storage take place. Older sites have fewer controls to protect water quality. The most likely project will add additional treatment to the snow storage facility by the Softball Complex. Snow hauled from downtown streets is kept here until it melts, releasing its pollutants. Most of the pollutants settle in place and are removed, while some escapes in runoff. Operations facilities are evolving quickly as the City grows, and we will ensure that this site or other site will have an adequate lifespan before constructing a water quality project. CONSEQUENCES OF DELAYING PROJECT Impacts to water quality would continue and staff would need to maintain existing facilities more frequently than the installation of a passive system. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project was moved from FY29 to FY30 to spread workload and allow time for design. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Stormwater $0 $0 $0 $0 $0 $176,400 Adopted FY26-30 Capital Improvement Plan Page 142 of 383 161 TRANSPORTATION Adopted FY26-30 Capital Improvement Plan Page 143 of 383 162 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 144 of 383 163 STREET MAINTENANCE Adopted FY26-30 Capital Improvement Plan Page 145 of 383 164 Street Maintenance Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 149 STR71 Street Improvement Mill and Overlay $ 1,136,100 $ 1,240,600 $ 1,354,700 $ 1,479,400 $ 1,597,000 $ 6,807,800 150 STR40 Dump Truck W/ Plow Sander 297,400 - - - - 297,400 151 STR93 Snow Blower 220,000 - - - - 220,000 152 STR162 Routing Software 216,200 - - - - 216,200 153 STR139 Mini Excavator 200,000 - - - - 200,000 154 STR155 Flanders Mill Shared Use Path 182,300 - - - - 182,300 155 STR20 Annual Multimodal Improvements 158,200 150,000 150,000 150,000 150,000 758,200 156 STR30 Annual Median & Boulevard 125,000 125,000 125,000 125,000 125,000 625,000 157 STR75 Annual Pedestrian Ramp Repair 120,000 125,000 130,000 135,000 140,000 650,000 158 STR159 Road Weather Information System (RWIS) Stations 110,000 - - - - 110,000 159 STR161 Automatic Vehicle Location (AVL) Update With Dash Cams 99,200 - - - - 99,200 160 STR123 Light Duty Fleet Addition 80,000 - 80,000 - 170,000 330,000 161 STR129 Light Duty Replacements 80,000 80,000 - - - 160,000 162 STR157 Wing Plows for Existing Trucks 60,000 60,000 - - - 120,000 163 STR145 Smart Paving Technology Attachment 55,000 - - - - 55,000 164 STR117 Annual Sidewalk Improvements 50,000 50,000 50,000 50,000 50,000 250,000 165 STR49 Sander Replacement 40,000 40,000 40,000 50,000 50,000 220,000 166 STR135 Diesel Fuel Tank & Kiosk 32,000 32,000 - - - 64,000 167 STR111 Paint Truck - 650,000 - - - 650,000 168 STR149 Loader Mounted Mill - 250,000 - - - 250,000 169 STR119 Tractor Truck For Trailer - 210,000 - - - 210,000 170 STR146 Single Drum Roller - 200,000 - - - 200,000 171 STR120 Side Dump Trailer - 120,000 - - - 120,000 172 STR58 Tandem Axle Dump Trucks (2) - - 700,000 - - 700,000 173 STR92 Oak St Median Landscaping - - 300,000 - - 300,000 174 STR126 Loader - - 275,000 - - 275,000 175 STR136 Path Tractor with Attachments - - 230,000 - 250,000 480,000 176 STR142 Lift Truck for Street Lights - - - 225,000 - 225,000 177 STR151 Mini Loader - - - 120,000 - 120,000 178 STR148 Replace Sign Printer - - - 65,000 - 65,000 179 STR158 Trailer Mounted Vacuum Unit - - - - 45,000 45,000 Total $ 3,261,400 $ 3,332,600 $ 3,434,700 $ 2,399,400 $ 2,577,000 $ 15,005,100 Adopted FY26-30 Capital Improvement Plan Page 146 of 383 165 Street Maintenance Unscheduled Projects Project Code Project Name Amount Description STR150 Large Milling Machine $750,000 This item would add a large milling machine to Streets Division equipment fleet. Our current milling machine mills a 40” path while this replacement will mill an 80” path, doubling our output. By using Streets Division crews to do more of the local street mill and overlays, we can keep streets from failing and increasing cost to our residents. This item will serve to build internal paving capacity that can reduce reliance on contractors and increase service to our residents. Project moved to unscheduled to reduce assessment impacts. STR131 Tow Plow 500,000 This item would add to Streets Division plowing fleet. This plow unit is towed by a truck and when combined with the truck's plow can clear the same road width as two trucks. This equipment would be used on the City’s four-lane roads such as Oak, S. 19th, Kagy, Durston, etc. Project moved to unscheduled to reduce assessment impacts. STR154 Track Loader 280,000 This item would add a track loader to Streets Division equipment fleet. The loader would allow the City to build infill missing path segments and new paths. The loader can remove the existing soil and replace it with compactable sub surface to ensure a smooth product enjoyable for all users. Project moved to reduce assessment impacts. STR152 Compact Asphalt Paver 220,000 This item would add a specialized asphalt paving machine to Streets Division equipment fleet. A smaller paver will allow City crews to efficiently pave small projects such as utility cuts, small asphalt failures, paths, and transit stops. Project moved to unscheduled to reduce assessment impacts. STR141 Rear Load Garbage Truck 200,000 This item requests funding to replace a 30-year-old truck currently used by Streets Division for leaf cleanup and by Solid Waste Division as their backup compost truck. Project moved to unscheduled to reduce assessment impacts. STR153 Tanker For Deicing 150,000 This item would add a tanker trailer to Streets Division equipment fleet. Efficient application of pre-storm-liquids keeps ice from forming before snow is plowed. A 4000-gallon tanker trailer would allow the City to cover current and future routes without several trips back to the shops to refill. Project moved to unscheduled to reduce assessment impacts. STR147 Solar Level 2 EV Charger 110,000 This project would install a solar powered EV charging station for City fleet. The solar unit requires no infrastructure and can be placed anywhere there is solar exposure and two parking spots. Grant funding will be pursued by the Sustainability Division. Project moved to unscheduled while plans are finalized for City Shops Complex expansion. STR138 Covered Parking 100,000 This project would add covered parking at the existing City Shops Complex. It may be possible to include charging sites for public use. The project is planned to be built at the SE corner lot at the Shops at Rouse and Aspen. Project moved to unscheduled while Shops Expansion plan is finalized. STR94 Mastic Patch Machine 77,000 This item would purchase a hot applied mastic machine. The mastic machine allows City crews to repair asphalt without it needing to be compacted, and therefore can be open to traffic within hours. It is an excellent long-lasting repair to pavement surface imperfections that otherwise would need to be milled up and patched. The product applied is similar to what is put on flat roofs but includes aggregate. Project moved to unscheduled to reduce assessment impacts. STR137 Spray Insulate Green Shed 50,000 This project would insulate an existing equipment shed. This request represents the Streets Division cost for half of the building. Project moved to unscheduled to reduce assessment impacts. Total $2,437,000 Adopted FY26-30 Capital Improvement Plan Page 147 of 383 166 Map of Street Maintenance Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 148 of 383 167 Street Improvement Mill and Overlay (STR71) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Assessment Revenue & Other $6,807,800 Total Scheduled Project Cost $6,807,800 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project represents the City’s annual funding for the mill and overlay phase of asphalt pavement maintenance. Mill and overlays are a critical component to the City’s pavement preservation program. Mill & Overlay is planned for 1.9 miles of City streets in FY26. This includes Highland from Pinecrest to Curtiss, Ferguson from Durston to Oak, and several local streets in and adjacent to the downtown core. Final locations and limits of work will be adjusted to maximize the annual allocation in each given year. These and future projects are selected based on the 2020 Pavement Condition Assessment and site visits by Streets Division and Engineering staff. All routes will be evaluated for potential low-cost Complete Streets improvements prior to completion of design. CONSEQUENCES OF DELAYING PROJECT Delays will create deferred maintenance of City street pavement assets resulting in significantly higher pavement rehabilitation costs in the future. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY30 estimate has been scheduled. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $1,040,400 $1,136,100 $1,240,600 $1,354,700 $1,479,400 $1,597,000 Adopted FY26-30 Capital Improvement Plan Page 149 of 383 168 Dump Truck W/ Plow Sander (STR40) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $297,400 Total Scheduled Project Cost $297,400 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds a single axle dump truck outfitted with plow and sander. Dump trucks with plow/sander attachments are used for plowing snow and sanding intersection approaches in the winter and hauling materials to job sites the rest of the year. The Streets Division currently operates eight tandem axle plow trucks, when all are in working order. The addition of this truck to the Streets Division fleet will improve all-season maintenance capacity to keep pace with growth of City infrastructure assets and will be available for use by other departments. The City will explore the possibility of an electric or hybrid unit. CONSEQUENCES OF DELAYING PROJECT Delay would risk a decreased level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $297,400 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 150 of 383 169 Snow Blower (STR93) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $220,000 Total Scheduled Project Cost $220,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds the replacement of a 10-year-old large snow blower used by the Streets Division. Snow blowers are used in snow hauling operations for routes that do not have snow storage capacity, such as Main Street and the downtown alleys. Snow blowers are also required at the City’s snow storage sites in order to maximize available space. The City’s only existing snow blower is reaching the end of its useful life and must be replaced. The existing snow blower will be kept as backup capacity for situations in which this budget item is down or in use. CONSEQUENCES OF DELAYING PROJECT Without a snow blower, City staff would need to remove berms on Main Street and other high traffic areas using loaders and hand tools adding a significant amount of labor hours to clear snow after each storm. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $220,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 151 of 383 170 Routing Software (STR162) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Software as a Service OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $216,200 Total Scheduled Project Cost $216,200 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds routing software with driver focus technology for Streets Division plow trucks and graders. Recent hiring trends have staffed the Streets Division with operators less experienced with City infrastructure. As the City grows, operations have become more complex, and it is increasingly important to have clear and accurate routes with step-by-step navigation. This technology will provide navigation, driver, and task-focused tracking software which will significantly improve our efficiency. In addition, this technology improves real-time tracking, enabling improved status updates to better serve our community. CONSEQUENCES OF DELAYING PROJECT Delays would force City to continue to issue paper route maps forcing operators to use flashlights to track where they are on any given route. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New project added after 2025 Biennium Budget upon completing research into operational improvements. Additional costs in FY26 will be absorbed using 2025 biennium budget savings, if available, otherwise a budget amendment may be requested at a later date. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $216,200 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 152 of 383 171 Mini Excavator (STR139) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $200,000 Total Scheduled Project Cost $200,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds a mini excavator for the Streets Division. The Streets Division currently shares a mini excavator with the Water and Sewer Departments. The City’s existing excavator is in use almost every day which results in scheduling issues and a frequent need to rent equipment. This budget item would procure a larger unit that would be more useful for Streets Division needs, allowing Water and Sewer to use the smaller unit for better maneuverability in tight work areas. CONSEQUENCES OF DELAYING PROJECT Delay would force the City to continue sharing equipment, potentially leading to delays in work and increased operating costs from renting equipment. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This item has been moved from FY27 to FY26 due to increased Streets Department in-house construction work requiring the additional equipment capacity. Additional costs will be absorbed using 2025 biennium budget savings, if available, otherwise a budget amendment may be requested at a later date. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $200,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 153 of 383 172 Flanders Mill Shared Use Path (STR155) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Grant(s) & Assessment Revenue $182,300 Total Scheduled Project Cost $182,300 STRATEGIC PLAN, IF APPLICABLE 4.5 a) Enhance Non-motorized Transportation DESCRIPTION OF PROJECT This project will design and construct a missing section of 10' of a shared use pathway along the east side of Flanders Mill from Durston Rd. north to Sunstone St. The City has been awarded a Transportation Alternatives grant for this project requiring a local match of $28,410 from the Street Maintenance Fund. Engineering is being completed in-house and began in the summer of 2024. Construction is anticipated in FY26. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $227,200. CONSEQUENCES OF DELAYING PROJECT Delay to this project would require grant funding to be returned and the project to be Unscheduled. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $44,900 $182,300 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 154 of 383 173 Annual Multimodal Improvements (STR20) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $758,200 Total Scheduled Project Cost $758,200 STRATEGIC PLAN, IF APPLICABLE 4.5 Housing and Transportation Choices DESCRIPTION OF PROJECT This project provides annual funding for multimodal improvements intended to increase connectivity throughout the City and promote active transportation modes. Multimodal improvements completed with this funding include bike racks, signage, striping, crack & fog sealing, asphalt overlay, curb cuts, shared use pathways, and traffic calming. Individual improvements will be selected by City staff based on synergies with other projects, the 2017 Transportation Master Plan, and public feedback throughout the year. CONSEQUENCES OF DELAYING PROJECT Delay would remove funding for these improvements causing the City to defer critical multimodal safety improvements. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Annual funding has been increased by approximately $50,000 as requested by the Bozeman City Commission during adoption of the 2025 Biennium Budget. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $154,000 $158,200 $150,000 $150,000 $150,000 $150,000 Adopted FY26-30 Capital Improvement Plan Page 155 of 383 174 Annual Median & Boulevard (STR30) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $625,000 Total Scheduled Project Cost $625,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This item funds annual contractor services to assist the Streets Division with maintenance of medians and boulevards in public right-of-way. Typical work includes irrigation installation and maintenance, mowing, landscaping, and general maintenance items. CONSEQUENCES OF DELAYING PROJECT Delay in funding this item would leave the Streets Division understaffed, delaying the required maintenance of all medians and boulevards in the public right- of-way, leading to overgrown vegetation. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Annual funding estimates have been revised upward to $125,000 to account for increases in contractor pricing, growth of the City’s use of landscaping in the right-of-way, and addition of roundabouts added to the list of contracted services. Additional costs in FY26 will be absorbed using 2025 biennium budget savings, if available, otherwise a budget amendment may be requested at a later date. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $88,400 $125,000 $125,000 $125,000 $125,000 $125,000 Adopted FY26-30 Capital Improvement Plan Page 156 of 383 175 Annual Pedestrian Ramp Repair (STR75) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Assessment Revenue $650,000 Total Scheduled Project Cost $650,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project funds an annual program to continue upgrading pedestrian facilities to ADA compliance. Upgrading pedestrian facilities will allow the City to continue steps towards compliance with the Americans with Disabilities Act of 1990 and Section 504 of the Rehabilitation Act of 1973. CONSEQUENCES OF DELAYING PROJECT Delays will reduce the pace of coming into compliance with the Americans with Disabilities Act requirements for pedestrian ramps. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Annual funding added in FY30 reflecting an $5,000 increase to the prior-year amount to keep pace with inflation. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $115,000 $120,000 $125,000 $130,000 $135,000 $140,000 Adopted FY26-30 Capital Improvement Plan Page 157 of 383 176 Road Weather Information System (RWIS) Stations (STR159) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $110,000 Total Scheduled Project Cost $110,000 STRATEGIC PLAN, IF APPLICABLE 7.3 Best Practices, Creativity & Foresight DESCRIPTION OF PROJECT This project would fund four Road Weather Information Systems (RWIS) stations placed at the intersections of 1.) Highland and Ellis 2.) Griffin and Manley 3.) Cottonwood and Durston 4.) S.19th and Graf. RWIS technology will give Streets Division Management the ability to remotely access information on road conditions, road temperatures, and pavement surface friction. Advanced notice of weather conditions will allow us to be more efficient in deploying Streets Division staff, better serving the community, before bad weather impacts travel. CONSEQUENCES OF DELAYING PROJECT Delay to this project would force staff to remain dependent on dispatch for maintenance needs across City, slowing response times. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New project added after 2025 Biennium Budget upon completing research into operational improvements. This project is added due to challenges in recent snow years with prioritizing clearing of snow and will help optimize street safety after snow events. Additional costs will be absorbed using 2025 biennium budget savings, if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $110,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 158 of 383 177 Automatic Vehicle Location (AVL) Update With Dash Cams (STR161) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Software as a Service OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $99,200 Total Scheduled Project Cost $99,200 STRATEGIC PLAN, IF APPLICABLE 7.3 Best Practices, Creativity & Foresight DESCRIPTION OF PROJECT This item funds updating and increasing of Streets Division Automatic Vehicle Locators from 31 vehicles and equipment to 63 units. In addition, this funding would add 43 front facing cameras to safety-critical equipment such as trucks, plows, graders, and sweepers. As our fleet grows it becomes more and more necessary to have tracking technology to optimize our operations, ensure accountability of operators, and validate our operator safety in the public right of way. Exterior facing dash cameras provide an additional amount of validation and confirmation of actions and a new ability to remotely diagnose issues that occur in our line of duty. CONSEQUENCES OF DELAYING PROJECT Delay would continue to track only half of the Streets Division vehicles, without video capability. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New project added after 2025 Biennium Budget upon completing research into operational improvements. Additional costs in FY26 will be absorbed using 2025 biennium budget savings, if available, otherwise a budget amendment may be requested at a later date. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $99,200 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 159 of 383 178 Light Duty Fleet Addition (STR123) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $330,000 Total Scheduled Project Cost $330,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds additions to the Streets Division light duty pickup truck fleet. The current estimated cost of one vehicle is $80,000. Ability to respond to requests by citizens and transportation staff to and from jobsites requires increased mobility. Light duty trucks are easier and more efficient to drive around town than a full-size dump truck. Streets Division, including Signs & Signals, is projected to have 30 FTE staff by the end of the FY25-27 staffing plan, and targets one light duty vehicle per two to four FTE for purposes of efficient transport to various work sites across the city each shift. Four additions are scheduled in this Capital Plan. Total light duty fleet is projected to be 13 vehicles by FY30 including four additions in this plan. These trucks will typically require towing capacity and may not be appropriate for electric engines due to reduced payload. CONSEQUENCES OF DELAYING PROJECT Delays force City to continue operating older, less-efficient vehicles. This inhibits our ability to service requests in a timely manner. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Added two additional trucks totalling $170k to FY30; no change to amounts in FY26 and FY28. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $80,000 $80,000 $0 $80,000 $0 $170,000 Adopted FY26-30 Capital Improvement Plan Page 160 of 383 179 Light Duty Replacements (STR129) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $160,000 Total Scheduled Project Cost $160,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds replacements to the Streets Division light duty pickup truck fleet. Currently each light duty replacement is estimated to cost $80,000. Ability to respond to requests by citizens and transportation staff to and from jobsites requires increased mobility. Light duty trucks are easier and more efficient to drive around town than a full-size dump truck. Streets Division, including Signs & Signals, is projected to have 30 FTE staff by the end of the FY25-27 staffing plan, and targets one light duty vehicle per two to four FTE for purposes of efficient transport to various work sites across the City each shift. Two replacements are scheduled in this Capital Plan for existing assets #3345 (2006 model) and #3666 (2013 model). Total light duty fleet is projected to be 13 vehicles by FY30 including four additions in this plan. These trucks will typically require towing capacity and may not be appropriate for electric engines due to reduced payload. CONSEQUENCES OF DELAYING PROJECT Delay would force City to continue using a less-efficient truck. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Combined project codes for light duty replacements (STR129 and STR130) into one project code. No change to budgeted amounts. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $80,000 $80,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 161 of 383 180 Wing Plows for Existing Trucks (STR157) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $120,000 Total Scheduled Project Cost $120,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item would add wing attachments to the eight Plow Trucks currently used by the Streets Division. This equipment will allow an additional 6 feet of snow removal on each pass reducing the number of passes needed to clear a street. CONSEQUENCES OF DELAYING PROJECT Delays would risk inability to clear routes in a timely manner. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New project added after 2025 Biennium Budget upon completing research into operational improvements. Additional costs in FY26 will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be requested at a later date. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $60,000 $60,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 162 of 383 181 Smart Paving Technology Attachment (STR145) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $55,000 Total Scheduled Project Cost $55,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds technology to improve Streets Division asphalt paving ability. Streets Division staff will improve quality and efficiency of paving operations by adding this technology commonly used in industry practice. Local streets often present the challenge of slope and drainage while trying to keep a smooth surface for all forms of transportation. This item will serve to build internal paving capacity that can reduce reliance on contractors and increase service to our residents. CONSEQUENCES OF DELAYING PROJECT Delay of this item will require manual adjustments and calculations during paving operations, reducing operational effciency. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $55,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 163 of 383 182 Annual Sidewalk Improvements (STR117) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Unknown Class 4 FUNDING SOURCE(S) AMOUNT Assessment Revenue $250,000 Total Scheduled Project Cost $250,000 STRATEGIC PLAN, IF APPLICABLE 4.5 a) Enhance Non-motorized Transportation DESCRIPTION OF PROJECT This project funds annual sidewalk improvements to public right of way allowing for broader sidewalk repair & construction. Priority projects will be established by City staff working with the Transportation Advisory Board and public comment. This funding may also be used to supplement the City ordering in property- owner sidewalk improvements or combined with street reconstruction projects to reconstruct sidewalks at the same time. CONSEQUENCES OF DELAYING PROJECT Delay will remove the City’s only Capital funding for missing sidewalk gaps and repair needs, leading to ADA compliance risk and reduced pedestrian safety. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Annual estimates added in FY26-FY30 to serve Bozeman City Commission goals addressed in the City’s ongoing Bicycle and Pedestrian Gap Analysis. Additional costs in FY26 will be absorbed using 2025 biennium budget savings, if available, otherwise a budget amendment may be requested at a later date. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $50,000 $50,000 $50,000 $50,000 $50,000 Adopted FY26-30 Capital Improvement Plan Page 164 of 383 183 Sander Replacement (STR49) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $220,000 Total Scheduled Project Cost $220,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds street sanders on plow trucks required for adequate winter maintenance. Current City strategy is to replace each Sander on an 8-year cycle. Vehicle Maintenance rebuilds the conveyor & hydraulic system in the first four years and experience has shown that more significant structural components start to fail by the 7th year. The City currently has eight sanders, which are typically all out on the street during winter storms. Mid-winter repairs are unlikely due to time required for parts delivery and overall winter maintenance workloads. By replacing the sander every eight years we can avoid failure to one of our plow/sander units. CONSEQUENCES OF DELAYING PROJECT Failing to replace sanders on a regular basis could result in significant downtime due to maintenance and an inability to respond in a timely manner for icy conditions, which has significant safety risks. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $40,000 $40,000 $40,000 $40,000 $50,000 $50,000 Adopted FY26-30 Capital Improvement Plan Page 165 of 383 184 Diesel Fuel Tank & Kiosk (STR135) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $64,000 Total Scheduled Project Cost $64,000 STRATEGIC PLAN, IF APPLICABLE 7.3 Best Practices, Creativity & Foresight DESCRIPTION OF PROJECT This item funds facility improvements at the City shops complex. The City currently has 1500 gallons of fuel storage capacity at the City shops complex. Fuel consumption by department is currently tracked by manual data collection. Operations staff often run out of fuel and then have to fuel large equipment at retail stations, which is not safe. This station would increase fuel capacity and be placed in the same location of the current tank at the Shops. This item is funded as a four-year lease with City ownership coming at the end of the 4th year. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $128,000. CONSEQUENCES OF DELAYING PROJECT Delay risks running out of fuel during snowstorms. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $32,000 $32,000 $32,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 166 of 383 185 Paint Truck (STR111) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Debt Proceeds $650,000 Total Scheduled Project Cost $650,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This item would add a line painting truck to the Streets Division fleet. Pavement marking services are limited statewide due to contractor availability. City currently depends on the Montana Department of Transportation (MDT) for refreshment of long-line pavement markings on City streets through a shared maintenance agreement. This agreement requires City needs to be fit into MDT scheduling and Sign & Signal Divison staff are still required to assist with traffic control. MDT staffing and equipment shortages have led to reduced quality and quantity of work. This funding will allow Sign & Signal Division to perform line painting on schedule and increase capacity of work without requiring staff augmentation. CONSEQUENCES OF DELAYING PROJECT Delay would risk inability to keep pace with line painting needs resulting in reduced safety to the traveling public. Contracting these services as an alternative would significantly increase Streets Division operating costs. Small scal e to full MDT work plus chasis cost increases. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Anticipated cost for this item has increased from $250,000 to $650,000. The Division initially budgeted for a machine with capacity to cover small-scale line painting needs. In order to take over line painting from MDT, a high-capacity machine is required with anticipated present-day cost of approximately $550,000. When sourcing quotes, the vendor recommended an anticipated FY27 budget year cost of $650,000 based on recent escalation of chasis cost. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $650,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 167 of 383 186 Loader Mounted Mill (STR149) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $250,000 Total Scheduled Project Cost $250,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item replaces the Streets Division’s 20-year-old milling machine used for pavement maintenance. Milling machine technology has made great improvements over that time and the Streets Division is due to replace the existing mill for improved operations. CONSEQUENCES OF DELAYING PROJECT Delay would decrease level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $250,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 168 of 383 187 Tractor Truck For Trailer (STR119) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $210,000 Total Scheduled Project Cost $210,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds a second tractor truck to be used by the Streets Division for pulling a lowboy or side dump trailer. The tractor truck addition provides the Division with the ability to haul three times the amount of materials and equipment leading to less trips. This increases efficiency of operations and decreases emissions. CONSEQUENCES OF DELAYING PROJECT Delays would result in increased labor costs from making more trips than necessary to transport materials and equipment. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $210,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 169 of 383 188 Single Drum Roller (STR146) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $200,000 Total Scheduled Project Cost $200,000 STRATEGIC PLAN, IF APPLICABLE 4.5 a) Enhance Non-motorized Transportation DESCRIPTION OF PROJECT This item funds the addition of a single drum roller to our asphalt fleet for constructing transportation paths and facilities. Base course compaction is critical to the longevity of asphalt pavements. This item will serve to build internal paving capacity, reducing reliance on contractors and increasing service to our residents. CONSEQUENCES OF DELAYING PROJECT Delay would force staff to rent equipment or fail to obtain maximum compaction before paving. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $200,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 170 of 383 189 Side Dump Trailer (STR120) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $120,000 Total Scheduled Project Cost $120,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds a second side dump trailer to pair with STR119 Tractor Truck scheduled in FY27 for the Streets Division which will enable transportation of three times the amount of snow, materials, and sweepings compared to the current equipment. CONSEQUENCES OF DELAYING PROJECT Delays result in inefficient labor, making more trips than necessary to transport materials. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $120,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 171 of 383 190 Tandem Axle Dump Trucks (2) (STR58) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $700,000 Total Scheduled Project Cost $700,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds two new tandem axle dump trucks for all-season maintenance and construction. The Streets Division currently has eight tandem axle dump trucks which are used to plow and sand arterials & collectors, haul asphalt during paving operations, haul leaves, haul waste from camping sites, haul snow, tow equipment trailers, and perform general street maintenance. The City targets plowing and sanding by 8am after a winter storm event and can typically serve 100 miles per route. It requires eight tandem axle dump trucks to currently meet this goal. With the widening of multiple collectors & arterials and additional lane mileage added in the City, the Division has a need for larger tandem axle trucks to finish plow & sanding routines in the future. Tandem axle trucks are also able to haul twice as much asphalt as a single axle truck which cuts down on the number of trips to the asphalt plant. CONSEQUENCES OF DELAYING PROJECT Failure to replace and increase number of tandem axle dump trucks will lead to a decline in level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This item has been moved from FY26 to FY28. This adjustment is based on the city’s current estimated timing of increases in street mileage to be built and staffing additions required to service the additional mileage. Total anticipated expense increased by $30,000 based on latest pricing received from vendor for the FY28 budget year. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $700,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 172 of 383 191 Oak St Median Landscaping (STR92) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $300,000 Total Scheduled Project Cost $300,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will install water efficient landscaping & irrigation utilizing best management practices to reduce overall water use & maintenance associated with the median landscape. The landscaping & irrigation installed in these medians will be appropriate for harsh roadway conditions and will reduce water use, chemical weed mitigation, and maintenance associated with the landscape. These landscapes are suited to withstand drought events, reducing socio-economic impacts from the loss of outdoor landscapes. Finally, the landscape aesthetics will exemplify the beauty of drought tolerant landscapes, contribute to quality of life for Bozeman residents, and demonstrate the City's commitment to water stewardship. This project is a partnership between the City's Water Conservation Division & Streets Division. Water efficient landscape & irrigation designs to be utilized for these medians were a deliverable from the water fund WC01 CIP project. This funding will fund only partial landscaping of Oak St medians. Significant inflation for these services will require substantially higher funding allocation to complete work for the entirety of Oak St. CONSEQUENCES OF DELAYING PROJECT Oak Street medians will remain in their current state. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $300,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 173 of 383 192 Loader (STR126) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $275,000 Total Scheduled Project Cost $275,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds an addition to the City’s loader fleet. Streets Division often deploys multiple crews requiring use of a loader in a given shift. This addition will give Superintendent’s more flexibility in project scheduling. CONSEQUENCES OF DELAYING PROJECT Delay would risk decreased efficiency and level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $250,000 $0 $0 $275,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 174 of 383 193 Path Tractor with Attachments (STR136) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $480,000 Total Scheduled Project Cost $480,000 STRATEGIC PLAN, IF APPLICABLE 4.5 a) Enhance Non-motorized Transportation DESCRIPTION OF PROJECT This item funds two tractors sized for path and sidewalk maintenance. With the addition of many multi-modal transportation facilities and increased City Commission desire for improved maintenance, this funding would provide additional capacity to the fleet for year-round maintenance including mowing, sweeping and plowing. CONSEQUENCES OF DELAYING PROJECT Delay would risk deferring maintenance on multi-use paths. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY30 anticipated cost added for a second tractor in anticipation of increased path mileage. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $230,000 $0 $250,000 Adopted FY26-30 Capital Improvement Plan Page 175 of 383 194 Lift Truck for Street Lights (STR142) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $225,000 Total Scheduled Project Cost $225,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds an improved lift truck for the Sign and Signal Division. The current bucket truck in the Sign & Signal Division does not reach all luminaires in the City and equipment failures are becoming more frequent. Repairs to the existing truck in FY25 took six months to complete. This new truck would include a mechanism with increased utility. It would be able to raise light and signal poles. Currently the division has to outsource this service to a crane company, leading to delays in work and increases in operational costs. CONSEQUENCES OF DELAYING PROJECT Delay would reduce level of service to the community through delayed maintenance and would require the Street Division to continue contracting for crane services. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $0 $225,000 $0 Adopted FY26-30 Capital Improvement Plan Page 176 of 383 195 Mini Loader (STR151) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $120,000 Total Scheduled Project Cost $120,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This items funds the addition of a mini loader to the City’s equipment fleet for alternative transportation path maintenance, residential grading support, and plowing. CONSEQUENCES OF DELAYING PROJECT Delay would decrease level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $0 $120,000 $0 Adopted FY26-30 Capital Improvement Plan Page 177 of 383 196 Replace Sign Printer (STR148) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $65,000 Total Scheduled Project Cost $65,000 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT This item funds a replacement of the Sign & Signal Division sign printer with new technology and improved efficiency. The Division’s existing printer exceeds 10 years old and limits capacity for sign production. CONSEQUENCES OF DELAYING PROJECT Delay would risk continued down-time and inability to print signs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $0 $65,000 $0 Adopted FY26-30 Capital Improvement Plan Page 178 of 383 197 Trailer Mounted Vacuum Unit (STR158) FUND DEPARTMENT PROJECT TYPE Street Maintenance Streets Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $45,000 Total Scheduled Project Cost $45,000 STRATEGIC PLAN, IF APPLICABLE 7.3 Best Practices, Creativity & Foresight DESCRIPTION OF PROJECT This item funds a vacuum attachment mounted to a trailer for transport. This device will be used by the Sign & Signal Division to dig sign posts or locate utilities instead of hand digging. This will be used by the Streets Division to clean out curb chases, remove water to prep for patching, and culvert maintenance. CONSEQUENCES OF DELAYING PROJECT Delay would decrease efficiency of service. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Maintenance $0 $0 $0 $0 $0 $45,000 Adopted FY26-30 Capital Improvement Plan Page 179 of 383 198 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 180 of 383 199 STREET IMPACT FEE Adopted FY26-30 Capital Improvement Plan Page 181 of 383 200 Street Impact Fee Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 185 SIF114 Fowler Avenue Connection: Huffine to Oak $ 9,551,800 $ 2,984,400 $ -$ -$ -$ 12,536,200 186 SIF009 Kagy: 19th to Willson 2,690,000 - - - - 2,690,000 187 SIF118 Babcock: 15th to 19th 2,151,100 - - - - 2,151,100 188 SIF112 Highland/Main Intersection Improvement 850,000 - - - - 850,000 189 SIF188 Oak Street Intersections 750,000 - - - - 750,000 190 SIF191 Stucky: 19th to Fowler - 3,225,600 3,509,600 - - 6,735,200 191 SIF159 Oak: 27th to 19th Widening - - - 3,250,000 - 3,250,000 Total $ 15,992,900 $ 6,210,000 $ 3,509,600 $ 3,250,000 $ -$ 28,962,500 Adopted FY26-30 Capital Improvement Plan Page 182 of 383 201 Street Impact Fee Unscheduled Projects Project Code Project Name Amount Description SIF193 Fowler: Cattail to E Valley Center $12,958,500 This project will complete construction of this section of Fowler to City standards with curb and gutter as well as sidewalks/pathways and street lighting. This project is identified in the 2017 Transportation Master Plan as MSN-11. This project is Unscheduled due to lack of funding. SIF114 Fowler Avenue Connection: Huffine to Oak 2,250,700 This project will complete the final phase of the Fowler Avenue Connection consisting of intersection improvements at Fowler and Huffine. Staff intends to work toward a cost-share agreement with Montana Department of Transportation prior to re-scheduling. SIF149 Babcock: 11th to 15th 3,531,200 This project will improve Babcock from 11th to 15th. This project increases capacity directly by a left turn lane, bike lanes, and sidewalks. A payback district or Special Improvement District may be created to leverage other stakeholders. Design is planned in FY25 to align with design work on the Babcock project between 15th-19th. Right of Way acquisition and construction have been unscheduled due to funding constraints. This project is identified in the 2017 Transportation Master Plan as CMSN-9. This project has been unscheduled to consider a right-sized scope and prioritize higher needs within the Fund. SIF156 Highland/Kagy Intersection Improvement 3,260,000 This project will upgrade the intersection of Highland and Kagy. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout intersection control. This project is identified in the 2017 Transportation Master Plan as TSM-24. This project is Unscheduled due to lack of funding. SIF164 S 3rd: Kagy to Graf 2,445,000 This project consists of widening S 3rd from Graf to Kagy with a 3-lane urban arterial roadway. Project scope includes one travel lane in each direction, bike lanes or shared use path on each side, curb and gutter, sidewalks, and a raised median. This project also includes intersection improvements to address operational improvements for multimodal traffic. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout intersection control. This project is identified in the 2017 Transportation Master Plan as MSN-3 and SPOT-36. This project is Unscheduled due to lack of funding. SIF192 Fowler: Baxter to Cattail 2,300,000 This project will complete construction of this section of Fowler Ave. (currently Davis Ln.) to City standards with curb and gutter as well as sidewalks/pathways and street lighting. This project is identified in the 2017 Transportation Master Plan as MSN-11. This project is Unscheduled due to lack of funding. SIF190 N 15th: Tschache to Baxter 1,222,500 This project will construct N 15th Avenue from the intersection with Tschache Street to the intersection with Baxter Lane to a three-lane urban collector standard. This project is identified in the 2017 Transportation Master Plan as MSN-4. This project is Unscheduled due to lack of funding. SIF169 Durston/Laurel Parkway Intersection Improvement 975,000 This project consists of operational improvements to the intersection driven by development in the vicinity. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout intersection control. This project is Unscheduled due to lack of funding. Total $28,942,900 Adopted FY26-30 Capital Improvement Plan Page 183 of 383 202 Map of Street Impact Fee Fund Infrastrcuture Projects Adopted FY26-30 Capital Improvement Plan Page 184 of 383 203 Fowler Avenue Connection: Huffine to Oak (SIF114) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 2 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Assessment Revenue $12,536,200 $ 4,389,200 Total Scheduled Project Cost $16,925,400 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will complete Fowler Avenue from Huffine to Oak in four phases; North - Oak to Durston (FY26 & FY27), Middle - Durston to Babcock (FY27 & FY28), South - Babcock to Huffine (FY28), Intersection of Huffine and Fowler (Unscheduled). Project scope approved by Bozeman City Commission includes one travel lane in each direction, shared use paths, traffic signalization at Babcock, and roundabout at Durston. This project is identified in the Transportation Master Plan as MSN-13 and SPOT-39. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $24,391,594. Design is now at 60%. Engineering: funded in prior fiscal years | Utilities: Sewer installation included in Wastewater Impact Fee fund | Right of Way: $8,165,358 | Construction: $14,013,474. CONSEQUENCES OF DELAYING PROJECT Delaying project will result in significant traffic on surrounding streets which is expected to continue to increase over the next five years. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Total project cost has been revised downward by approximately $2.2 million compared to the prior CIP due to unscheduling of the Huffine Intersection phase. Staff intends to work toward a cost-share agreement with Montana Department of Transportation prior to re-scheduling. The project time line has been revised to include Construction for Phase I and ROW for Phase II in FY26. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $5,463,600 $9,551,800 $2,984,400 $0 $0 $0 Arterial & Collector District $0 $401,700 $1,730,700 $2,256,800 $0 $0 Total $5,463,600 $9,953,500 $4,715,100 $2,256,800 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 185 of 383 204 Kagy: 19th to Willson (SIF009) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 3 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Cash-in-Lieu of Infrastructure $2,690,000 $310,000 Total Scheduled Project Cost $3,000,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will reconstruct Kagy Blvd from the intersection of S 19th to Willson including two travel lanes in each direction, turn lanes as needed, roundabouts at the intersections with S 11th S 7th, traffic signal upgrades at the intersection with Willson and 19th, a 10-foot shared-use path on both sides of the corridor, pedestrian tunnels at S 11th and S 7th, landscaping, and street lighting. This project is identified in the 2017 Transportation Master Plan as MSN-8, SPOT-1, SPOT-6, SPOT-7, and SPOT-8. The City has been awarded a $24,289,622 federal grant from the Multimodal Project Discretionary Grant (MPDG) Program. Montana Department of Transportation (MDT) will lead the project through design and construction and administer the federal grant. The City’s contribution has been reduced to $3,000,000 with payment to MDT expected in FY26. Total project cost is estimated at $31,690,000. Project funds include STBDP funds totalling $4,440,000, State funds totalling $688,000 and Local funds totalling $3,000,000. Engineering and Inspection: $6,546,000 |Utilities: $1,306,000 |Right of Way: $2,567,000 |Construction: $20,221,000 CONSEQUENCES OF DELAYING PROJECT Kagy Boulevard is near vehicular capacity and lacks bike and pedestrian infrastructure in sections, increasing safety risks as development continues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Budget amounts reduced to include only the City’s contribution. Timing has been revised based on updated project funding agreement with MDT after MPDG Rural grant award was received. Prior CIP assumed City would administer grant, if awarded. Cash-in-Lieu of Infrastructure collected from adjacent development has been deposited in the Street Reconstruction Fund for use on the Kagy project FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $0 $2,690,000 $0 $0 $0 $0 Street Reconstruction $0 $310,000 $0 $0 $0 $0 Total $0 $3,000,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 186 of 383 205 Babcock: 15th to 19th (SIF118) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Assessment Revenue $2,151,100 $1,927,900 Total Scheduled Project Cost $4,079,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will improve Babcock from 15th to 19th including signalized intersection improvements at 19th and Babcock. This project will improve Babcock from 15th to 19th by adding a left turn lane, signal improvements at 19th, bike facilities and/or sidewalks. This project is identified in the Transportation Master Plan as CMSN-9. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $6,329,600. Engineering (FY25): $690,426 | Utilities (FY26): included in pipe rehab portion of utility funds Right of Way (FY25): $1,590,000 | Construction (FY26): $4,010,500 CONSEQUENCES OF DELAYING PROJECT Increased congestion, lack of multimodal safety and connectivity. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Cost estimates have been updated based on advancement of design resulting in a $450K increase to construction cost. Increases are primarily based on recent comparable bid prices FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $1,967,700 $2,151,100 $0 $0 $0 $0 Arterial & Collector District $282,900 $1,927,900 $0 $0 $0 $0 Total $2,250,600 $4,079,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 187 of 383 206 Highland/Main Intersection Improvement (SIF112) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $850,000 Total Scheduled Project Cost $850,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This item is for partial reimbursement of cost for a developer-led project to install a traffic signal at Highland and Main. Bozeman City Commission approved a funding contribution of $850,000 during the Commission meeting held on November 18, 2019 and confirmed through subsequent CIP approvals. CONSEQUENCES OF DELAYING PROJECT Delay of action would take a City Commission action to undo a prior City Commission action on this item. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $0 $850,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 188 of 383 207 Oak Street Intersections (SIF188) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Fund Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Assessment Revenue $750,000 $150,000 Total Scheduled Project Cost $900,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Following the completion of the Oak Street Intersections study approved in previous Capital Improvement Plans to identify, prioritize, and invest in operational improvements to intersections along the Oak St corridor west of N 27th, this item will fund construction of two specific intersection improvements recommended in the study. First, a project at the intersection of Oak and Flanders in 2025 will reduce conflicting turning movements by closing all or a portion of the Oak Street median, pending outcomes of the 2024 pilot project. Second, a project at the intersection of Oak and Ferguson in 2026 will add left turn lanes to Oak and modify the existing traffic signal for improved safety and intersection capacity. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $1,050,000. CONSEQUENCES OF DELAYING PROJECT Delay operational and safety improvements to intersections in need. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Added Impact Fee contribution of $750,000 in FY26 to fund the capacity improvement at Oak and Ferguson after completion of the study phase identified the proposed solution and provided a conceptual cost estimate. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $0 $750,000 $0 $0 $0 $0 Arterial & Collector District $150,000 $150,000 $0 $0 $0 $0 Total $150,000 $900,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 189 of 383 208 Stucky: 19th to Fowler (SIF191) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Assessment Revenue $6,735,200 $2,744,700 Total Scheduled Project Cost $9,479,900 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will complete construction of Stucky Road to a City collector standard with curb and gutter as well as sidewalks/pathways and street lighting. Improvements to the signal at S 19th will be included as necessary along with widening S 19th immediately south of 19th/Stucky to complete the necessary additional traffic lane on 19th adjacent to the existing church. This project is identified in the 2017 Transportation Master Plan as MSN-16. Engineering: $2,060,600 | Right of Way: $1,500,000 | Construction: $5,849,300 Utilities: water utility included in water fund otherwise incidental to project CONSEQUENCES OF DELAYING PROJECT This project will support the higher capacity of vehicles, bicycles, and pedestrians anticipated due to substantial development immediately south of Stucky Road. Delaying the project could compromise safety and level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Total cost has been reduced by $2.5 million to account for additional right of way to be dedicated to the City as a condition of approval for new development in the area. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $0 $0 $3,225,600 $3,509,600 $0 $0 Arterial & Collector District $0 $0 $405,000 $2,339,700 $0 $0 Total $0 $0 $3,630,600 $5,849,300 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 190 of 383 209 Oak: 27th to 19th Widening (SIF159) FUND DEPARTMENT PROJECT TYPE Street Impact Fee Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Assessment Revenue $3,250,000 $1,000,000 Total Scheduled Project Cost $4,250,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will widen Oak St to a 5-lane configuration that better aligns with the adjacent sections of Oak St. This project includes an eastbound lane reconfiguration & signal upgrade at N 19th. This project will create improvements to the capacity of this intersection by aligning lane configuration with the 2016 Oak St 15th to 19th project. The project will also address multimodal considerations by adding shared use path to this corner of the intersection. This project is identified in the 2017 Transportation Master Plan as TSM-16 and MSN-9. CONSEQUENCES OF DELAYING PROJECT Increased delays and reduced level-of-service at the intersection as growth continues to add demand. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project is combined with SIF147 Oak and 19th Intersection improvement and scheduled in five-year plan based on administrative policy to prioritize capacity and safety improvements within developed areas of the City. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Impact Fee $0 $0 $0 $0 $3,250,000 $0 Arterial & Collector District $0 $0 $0 $0 $1,000,000 $0 Total $0 $0 $0 $0 $4,250,000 $0 Adopted FY26-30 Capital Improvement Plan Page 191 of 383 210 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 192 of 383 211 ARTERIAL & COLLECTOR DISTRICT Adopted FY26-30 Capital Improvement Plan Page 193 of 383 212 Arterial & Collector District Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 198 SIF157 College: 8th to 11th $ 2,465,800 $ -$ -$ -$ -$ 2,465,800 199 SIF118 Babcock: 15th to 19th 1,927,900 - - - - 1,927,900 200 A&C007 Shared Use Path: Valley Center Infill Sections 527,600 - - - - 527,600 201 A&C016 Shared Use Path: S 19th Lincoln to Kagy 432,600 - - - - 432,600 202 SIF114 Fowler Avenue Connection: Huffine to Oak 401,700 1,730,700 2,256,800 - - 4,389,200 203 SIF188 Oak Street Intersections 150,000 - - - - 150,000 204 A&C029 McIlhattan: Bikefill Access Improvements - 1,500,000 - - - 1,500,000 205 A&C024 Shared Use Path: Frontage - 500,000 - 200,000 - 700,000 206 SIF191 Stucky: 19th to Fowler - 405,000 2,339,700 - - 2,744,700 207 SIF158 College: 11th to 19th - - 2,117,400 7,239,100 - 9,356,500 208 A&C001 Shared Use Paths: Citywide Improvements - - 500,000 500,000 - 1,000,000 209 SIF159 Oak: 27th to 19th Widening - - - 1,000,000 - 1,000,000 Total $ 5,905,600 $ 4,135,700 $ 7,213,900 $ 8,939,100 $ -$ 26,194,300 Adopted FY26-30 Capital Improvement Plan Page 194 of 383 213 Arterial & Collector District Unscheduled Projects Project Code Project Name Amount Description SIF195 Church: Garfield to Kagy $4,840,000 This project consists of reconstructing Church Street from the intersection with Garfield Street to Kagy Boulevard with a two-lane urban collector standard. Project scope would include one travel lane in each direction, curb and gutter, and shared use path. This project will improve the capacity of motorized vehicles as well as pedestrians and cyclists. It is possible that due to land constraints that a shared use path may not be feasible on both sides of the street. This project is identified in the 2017 Transportation Master Plan as MSN-30. This project is Unscheduled due to lack of funding. SIF194 Church: Story to Garfield 3,330,000 This project consists of reconstructing Church Street from the intersection with Story to Garfield with a two-lane urban collector standard. Project scope would include one travel lane in each direction, curb and gutter, and shared use path. This project will improve the capacity of motorized vehicles as well as pedestrians and cyclists. It is possible that due to land constraints that a shared use path may not be feasible on both sides of the street. This project is identified in the 2017 Transportation Master Plan as MSN-30. This project is Unscheduled due to lack of funding. A&C014 S 19th/Blackwood Intersection Improvement 2,445,000 This project will design and construct upgrades to the intersection of S 19th and Blackwood. Development in this area is contributing to increased demand at this intersection leading to the intersection eventually warranting traffic control. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout or traffic signal control. This project is Unscheduled due to lack of funding. SIF164 S 3rd: Kagy to Graf 2,445,000 This project consists of widening S 3rd from Graf to Kagy with a 3-lane urban arterial roadway. Project scope includes one travel lane in each direction, bike lanes or shared use path on each side, curb and gutter, sidewalks, and a raised median. This project also includes intersection improvements to address operational improvements for multimodal traffic. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout intersection control. This project is identified in the 2017 Transportation Master Plan as MSN-3 and SPOT-36. This project is Unscheduled due to lack of funding. SIF192 Fowler: Baxter to Cattail 2,300,000 This project will complete construction of this section of Fowler Ave. (currently Davis Ln.) to a City standard with curb and gutter as well as sidewalks/pathways and street lighting. This project is identified in the 2017 Transportation Master Plan as MSN-11. This project is Unscheduled due to lack of funding. SIF149 Babcock: 11th to 15th 1,367,000 This project will improve Babcock from 11th to 15th. This project increases capacity directly by a left turn lane, bike lanes, and sidewalks. A payback district or Special Improvement District may be created to leverage other stakeholders. Design is planned in FY25 to align with design work on the Babcock project between 15th-19th. Right of Way acquisition and construction have been unscheduled due to funding constraints. This project is identified in the 2017 Transportation Master Plan as CMSN-9. This project has been unscheduled to consider a right-sized scope and prioritize higher needs within the Fund. (Continued on next page) Adopted FY26-30 Capital Improvement Plan Page 195 of 383 214 Arterial & Collector District Unscheduled Projects Continued Project Code Project Name Amount Description A&C019 Huffine Lane Crossing 1,222,500 This project will construct an enhanced active transportation crossing of Huffine Lane in the area of Fowler Ave. This project is identified in the 2017 Transportation Master Plan as a grade separated crossing. This project was identified in the 2017 Transportation Master Plan as SPOT-39. This project is Unscheduled due to lack of funding. SIF190 N 15th: Tschache to Baxter $1,222,500 This project will construct N 15th Avenue from the intersection with Tschache Street to the intersection with Baxter Lane to a three-lane urban collector standard. This project is identified in the 2017 Transportation Master Plan as MSN-4. This project is Unscheduled due to lack of funding. SIF169 Durston/Laurel Parkway Intersection Improvement 975,000 This project consists of operational improvements to the intersection driven by development in the vicinity. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout intersection control. This project is Unscheduled due to lack of funding. SIF114 Fowler Avenue Connection: Huffine to Oak 562,700 This project will complete the final phase of the Fowler Avenue Connection consisting of intersection improvements at Fowler and Huffine. Staff intends to work toward a cost-share agreement with Montana Department of Transportation prior to re-scheduling. SIF156 Highland/Kagy Intersection Improvement 500,000 This project will upgrade the intersection of Highland and Kagy. An Intersection Control Evaluation will be performed in the pre-design phase to determine feasibility of roundabout intersection control. This project is identified in the 2017 Transportation Master Plan as TSM-24. This project is Unscheduled due to lack of funding. A&C020 Cottonwood High- Intensity Activated Crosswalk (HAWK) Signal 244,500 This project will design and construct a High-Intensity Activated Crosswalk (HAWK) signal at on Cottonwood Rd connecting Harvest Parkway and the Sports Park. This project is Unscheduled due to lack of funding. Total $ 21,454,200 Adopted FY26-30 Capital Improvement Plan Page 196 of 383 215 Map of Arterial & Collector District Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 197 of 383 216 College: 8th to 11th (SIF157) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $2,465,800 Total Scheduled Project Cost $2,465,800 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will design and construct multimodal improvements to College between 8th and 11th. Anticipated improvements include pavement reconstruction, bicycle facilities, and pedestrian enhancements to improve connections across College. This project was identified in the 2017 Transportation Master Plan as MSN-19, SPOT-27, and BL-9. Consultant selection is anticipated in Fall of 2024 with design complete in 2025 and construction scheduled in 2026. Engineering: $665,773 Construction: $2,465,824 CONSEQUENCES OF DELAYING PROJECT Delays will prolong pedestrian safety challenges and allow pavement to deteriorate further. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Cost estimate has been revised upward by $118,700 due to updated unit costs. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $660,400 $2,465,800 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 198 of 383 217 Babcock: 15th to 19th (SIF118) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Assessment Revenue Impact Fee Revenue $1,927,900 $2,151,100 Total Scheduled Project Cost $4,079,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will improve Babcock from 15th to 19th including signalized intersection improvements at 19th and Babcock. This project will improve Babcock from 15th to 19th by adding a left turn lane, signal improvements at 19th, bike facilities and/or sidewalks. This project is identified in the Transportation Master Plan as CMSN-9 The total cost of this project including prior year actuals and FY25 budget is anticipated to be $6,329,600.Engineering (FY25): $690,426 Utilities (FY26): included in pipe rehab portion of utility funds Right of Way (FY25): $1,590,000 Construction (FY26): $4,010,500 CONSEQUENCES OF DELAYING PROJECT Increased congestion, lack of multimodal safety and connectivity. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Cost estimates have been updated based on advancement of design resulting in a $450K increase to construction cost. Increases are primarily based on recent comparable bid prices. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $282,900 $1,927,900 $0 $0 $0 $0 Street Impact Fee $1,967,700 $2,151,100 $0 $0 $0 $0 Total $2,250,600 $4,079,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 199 of 383 218 Shared Use Path: Valley Center Infill Sections (A&C007) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Grant(s) & Assessment Revenue $527,600 Total Scheduled Project Cost $527,600 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will design and construct incomplete sections of the 10-foot shared use path along E Valley Center between Catron and Catamount and along the west side of N 19th between Baxter and Rawhide Ridge. The City has been awarded Transportation Alternatives grants for this project. The local match required from the Aerterial & Collector fund is $88,938. Projects have been selected based on projected demand and were presented to Engineering work will be performed in-house by Engineering Division staff in FY25 the Bozeman Transportation Advisory Board for agreement and construction will be performed in FY26. This project was identified in the 2017 Transportation Master Plan as SP - 27, 28, and 29. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $662,800. CONSEQUENCES OF DELAYING PROJECT This project must be delivered on the timeline of funding requests for grant compliance or grant funding may be forfeited. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $135,200 $527,600 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 200 of 383 219 Shared Use Path: S 19th Lincoln to Kagy (A&C016) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $432,600 Total Scheduled Project Cost $432,600 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will widen the existing sidewalk on the east and west sides of S 19th Ave between Lincoln St and Kagy Blvd to 10’ wide shared use paths. Scheduling of this project is based on projected demand and was supported by the Bozeman Transportation Advisory Board. This project was identified in the 2017 Transportation Master Plan as SP-6. Engineering (FY26): $54,000 Construction (FY26): $ 346,600 Construction Administration (FY26): $32,000 CONSEQUENCES OF DELAYING PROJECT The Bozeman SAFE Plan of 2023 identifies separated bicycles facilities as a priority improvement. Further need for project prioritization is requested in the next Transportation Master Plan. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $432,600 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 201 of 383 220 Fowler Avenue Connection: Huffine to Oak (SIF114) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 2 FUNDING SOURCE(S) AMOUNT Assessment Revenue Impact Fee Revenue $ 4,389,200 $12,536,200 Total Scheduled Project Cost $16,925,400 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will complete Fowler Avenue from Huffine to Oak in four phases; North - Oak to Durston (FY26 & FY27), Middle - Durston to Babcock (FY27 & FY28), South - Babcock to Huffine (FY28), Intersection of Huffine and Fowler (Unscheduled). Project scope approved by Bozeman City Commission includes one travel lane in each direction, shared use paths, traffic signalization at Babcock, and roundabout at Durston. This project is identified in the Transportation Master Plan as MSN-13 and SPOT-39. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $24,391,594. Design is now at 60%. Engineering: funded in prior fiscal years | Utilities: Sewer installation included in Wastewater Impact Fee fund. Right of Way: $8,165,358 | Construction: $14,013,474 CONSEQUENCES OF DELAYING PROJECT Delaying project will result in significant traffic on surrounding streets which is expected to continue to increase over the next five years. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Total project cost has been revised downward by approximately $2.2 million compared to the prior CIP due to unscheduling of the Huffine Intersection phase. Staff intends to work toward a cost-share agreement with Montana Department of Transportation prior to re-scheduling. The project time line has been revised to include Construction for Phase I and ROW for Phase II in FY26. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $401,700 $1,730,700 $2,256,800 $0 $0 Street Impact Fee $5,463,600 $9,551,800 $2,984,400 $0 $0 $0 Total $5,463,600 $9,953,500 $4,715,100 $2,256,800 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 202 of 383 221 Oak Street Intersections (SIF188) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue Impact Fee Revenue $150,000 $750,000 Total Scheduled Project Cost $900,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Following the completion of the Oak Street Intersections study approved in previous Capital Improvement Plans to identify, prioritize, and invest in operational improvements to intersections along the Oak St corridor west of N 27th, this item will fund construction of two specific intersection improvements recommended in the study. First, a project at the intersection of Oak and Flanders in 2025 will reduce conflicting turning movements by closing all or a portion of the Oak Street median, pending outcomes of the 2024 pilot project. Second, a project at the intersection of Oak and Ferguson in 2026 will add left turn lanes to Oak and modify the existing traffic signal for improved safety and intersection capacity. The total cost of this project including prior year actuals and FY25 budget is anticipated to be $1,050,000. CONSEQUENCES OF DELAYING PROJECT Delay operational improvements to intersections in need. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Added Impact Fee contribution of $750,000 in FY26 to fund the capacity improvement at Oak and Ferguson after completion of the study phase identified the proposed solution and provided a conceptual cost estimate. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $150,000 $150,000 $0 $0 $0 $0 Street Impact Fee $0 $750,000 $0 $0 $0 $0 Total $150,000 $900,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 203 of 383 222 McIlhattan: Bikefill Access Improvements (A&C029) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Assessment Revenue $1,500,000 Total Scheduled Project Cost $1,500,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project consists of roadway improvements to McIlhattan Road to support the future development of the Bikefill Park. Anticipated scope includes pavement construction, slope remediation, and stormwater management. Conceptual Design and cost estimate have been completed in partnership with Gallatin Valley Land Trust (GVLT). GVLT will continue leading design with approvals from City staff. Upon completion, the City will bid the construction project and assist in construction administration. CONSEQUENCES OF DELAYING PROJECT Reduction in safety induced by lack of adequate roadway and increased traffic volume due to park operations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a newly scheduled project added to support the anticipated completion of a Bikefill park. STR140 - Reconstruction of McIlhattan Rd Design has been removed from the CIP to account for design completion by GVLT. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $0 $1,500,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 204 of 383 223 Shared Use Path: Frontage (A&C024) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $700,000 Total Scheduled Project Cost $700,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will construct a 10-foot shared use path along Frontage Road between Cherry River fishing access and Springhill Road. This is an initial portion of the overall Frontage Pathway from Bozeman to Belgrade, however, no County or City of Belgrade support has currently been identified to complete the path outside of city limits. Additional funding for this project is provided through a Trails, Open, Space and Parks (TOP) grant and through private fundraising identified in the TOP application. This project was identified in the 2017 Transportation Master Plan as SP-34. Right of Way agreements are required before this project can advance to construction. CONSEQUENCES OF DELAYING PROJECT The Bozeman SAFE Plan of 2023 identifies separated bicycles facilities as a priority improvement. Further need for project prioritization is requested in the next Transportation Master Plan. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $500,000 $0 $0 $200,000 $0 Adopted FY26-30 Capital Improvement Plan Page 205 of 383 224 Stucky: 19th to Fowler (SIF191) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue Impact Fee Revenue $2,744,700 $6,735,200 Total Scheduled Project Cost $9,479,900 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will complete construction of Stucky Rd to a City collector standard with curb and gutter as well as sidewalks/pathways and street lighting. Improvements to the signal at S 19th will be included as necessary along with widening S 19th immediately south of 19th/Stucky to complete the necessary additional traffic lane on 19th adjacent to the existing church. This project is identified in the 2017 Transportation Master Plan as MSN-16. Engineering: $2,060,600 | Right of Way: $1,500,000 | Construction: $5,849,300 Utilities: water utility included in water fund otherwise incidental to project CONSEQUENCES OF DELAYING PROJECT This project will support the higher capacity of vehicles, bicycles, and pedestrians anticipated due to substantial development immediately south of Stucky Road. Delaying the project could compromise safety and level of service to the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Total cost has been reduced by $2.5 million to account for additional right of way to be dedicated to the City as a condition of approval for new development in the area. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $0 $405,000 $2,339,700 $0 $0 Street Impact Fee $0 $0 $3,225,600 $3,509,600 $0 $0 Total $0 $0 $3,630,600 $5,849,300 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 206 of 383 225 College: 11th to 19th (SIF158) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Grant(s) $9,356,500 Total Scheduled Project Cost $9,356,500 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will design and reconstruct College between 11th and 19th to a three-lane urban minor arterial standard including Rectangular Rapid Flashing Beacons at 13th and 15th crossings. Anticipated improvements will upgrade the street to a City minor arterial standard including pavement reconstruction, addition of left turn lane, storm drainage, new sidewalk or shared use paths on both side of the street, and replace lighting to accommodate a wider street section. This project was identified in the 2017 Transportation Master Plan as MSN-17, SPOT-9, SPOT-10, and BL-10. Engineering: $863,400 Right of Way: $1,254,000 Construction: $7,239,100 CONSEQUENCES OF DELAYING PROJECT Delays will prolong pedestrian safety challenges and allow pavement to deteriorate further. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Funding for this project is assumed to come from the city’s MDT Urban Route funding source following reallocation from Kagy Blvd. Bozeman City Commission and State Transportation must concur through future agreements for the project to move forward. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $0 $0 $2,117,400 $7,239,100 $0 Adopted FY26-30 Capital Improvement Plan Page 207 of 383 226 Shared Use Paths: Citywide Improvements (A&C001) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $1,000,000 Total Scheduled Project Cost $1,000,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This annual project allocation will serve to construct missing sections of Shared Use Path identified for prioritization through the City's upcoming Bike/Ped Gap Analysis Study and Transportation Master Plan Update. Shared Use Path projects left Unscheduled in the FY25-29 Capital Improvement Plan have been moved under this new annual project for future consideration once planning efforts are complete. CONSEQUENCES OF DELAYING PROJECT City lacks dedicated funding sources to construct standalone shared use path projects. Delays to this request will allow lack of safe, connected bicycle infrastructure to continue. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Newly scheduled project. A&C008/16/17/18/23 have been consolidated into this item. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $0 $0 $500,000 $500,000 $0 Adopted FY26-30 Capital Improvement Plan Page 208 of 383 227 Oak: 27th to 19th Widening (SIF159) FUND DEPARTMENT PROJECT TYPE Arterial & Collector District Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue Impact Fee Revenue $1,000,000 $3,250,000 Total Scheduled Project Cost $4,250,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will widen Oak St to a 5-lane configuration that better aligns with the adjacent sections of Oak St. This project includes an eastbound lane reconfiguration & signal upgrade at N 19th. This will create improvements to the capacity of this intersection by aligning lane configuration with the 2016 Oak St 15th to 19th project. The project will also address multimodal considerations by adding shared use path to this corner of the intersection. This project is identified in the 2017 Transportation Master Plan as TSM-16 and MSN-9. CONSEQUENCES OF DELAYING PROJECT Increased delays and reduced level-of-service at the intersection as growth continues to add demand. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project has been combined with SIF147 Oak and 19th Intersection improvement and scheduled in five-year plan based on administrative policy to prioritize capacity and safety improvements within developed areas of the city. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Arterial & Collector District $0 $0 $0 $0 $1,000,000 $0 Street Impact Fee $0 $0 $0 $0 $3,250,000 $0 Total $0 $0 $0 $0 $4,250,000 $0 Adopted FY26-30 Capital Improvement Plan Page 209 of 383 228 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 210 of 383 229 STREET RECONSTRUCTION Adopted FY26-30 Capital Improvement Plan Page 211 of 383 230 Street Reconstruction Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 214 SIF009 Kagy: 19th to Willson $ 310,000 $ -$ -$ -$ -$ 310,000 215 SCR01 Curb Spot Repair 124,400 135,000 146,200 158,200 169,700 733,500 Total $ 434,400 $ 135,000 $ 146,200 $ 158,200 $ 169,700 $ 1,043,500 Street Reconstruction Unscheduled Projects Project Code Project Name Amount Description SCR31 S Grand (Olive to College) $2,101,800 Reconstruction of South Grand Avenue from Olive Street to College Street including replacement of failed curb and gutters, a City standard street section, asphalt, pedestrian ramps, pavement markings and signage. This project will also include replacement of failed City utilities under the street. Utility costs are budgeted in their respective annual replacement projects including water (W03), sewer (WW07), and storm drains (STDM05). Americans with Disabilities Act (ADA) compliance and Municipal Separated Storm Sewer (MS4) compliance will be met through this project. This project has been Unscheduled until updated funding policy for Local Street Reconstructions is determined. SCR32 W Lamme (7th to Tracy) 2,071,100 Reconstruction of West Lamme Street from 7th Avenue to Tracy Avenue including replacement of failed curb and gutters, a City standard street section, asphalt, pedestrian ramps, pavement markings and signage. This project will also include replacement of failed City utilities under the street. Utility costs are budgeted in their respective annual replacement projects including water (W03), sewer (WW07), and storm drains (STDM05). Americans with Disabilities Act (ADA) compliance and Municipal Separated Storm Sewer (MS4) compliance will be met through this project. This project has been Unscheduled until updated funding policy for Local Street Reconstructions is determined. SCR30 N Grand (Beall to Peach) 1,769,400 Reconstruction of North Grand Avenue from Beall Street to Peach Street including replacement of failed curb and gutters, a City standard street section, asphalt, pedestrian ramps, pavement markings and signage. This project will also include replacement of failed City utilities under the street. Utility costs are budgeted in their respective annual replacement projects including water (W03), sewer (WW07), and storm drains (STDM05). Americans with Disabilities Act (ADA) compliance and Municipal Separated Storm Sewer (MS4) compliance will be met through this project. This project has been Unscheduled until updated funding policy for Local Street Reconstructions is determined. SCR34 W Koch (4th to 8th) 1,302,200 Reconstruction of West Koch Street from 4th Avenue to 8th Avenue including replacement of failed curb and gutters, a City standard street section, asphalt, pedestrian ramps, pavement markings and signage. This project will also include replacement of failed City utilities under the street. Utility costs are budgeted in their respective annual replacement projects including water (W03), sewer (WW07), and storm drains (STDM05). Americans with Disabilities Act (ADA) compliance and Municipal Separated Storm Sewer (MS4) compliance will be met through this project. This project has been Unscheduled until updated funding policy for Local Street Reconstructions is determined. Total $7,244,500 Adopted FY26-30 Capital Improvement Plan Page 212 of 383 231 Map of Street Reconstruction Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 213 of 383 232 Kagy: 19th to Willson (SIF009) FUND DEPARTMENT PROJECT TYPE Street Reconstruction Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 3 FUNDING SOURCE(S) AMOUNT Cash-in-Lieu of Infrastructure Impact Fee Revenue $310,000 $2,690,000 Total Scheduled Project Cost $3,000,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will reconstruct Kagy Blvd from the intersection of S 19th to Willson including two travel lanes in each direction, turn lanes as needed, roundabouts at the intersections with S 11th S 7th, traffic signal upgrades at the intersection with Willson and 19th, a 10-foot shared-use path on both sides of the corridor, pedestrian tunnels at S 11th and S 7th, landscaping, and street lighting. This project is identified in the 2017 Transportation Master Plan as MSN-8, SPOT-1, SPOT-6, SPOT-7, and SPOT-8. The City has been awarded a $24,289,622 federal grant from the Multimodal Project Discretionary Grant (MPDG) Program. Montana Department of Transportation (MDT) will lead the project through design and construction and administer the federal grant. The City’s contribution has been reduced to $3,000,000 with payment to MDT expected in FY26. Total project cost is estimated at $31,690,000. Project funds include STBDP funds totalling $4,440,000, State funds totalling $688,000 and Local funds totalling $3,000,000. Engineering and Inspection: $6,546,000 |Utilities: $1,306,000 |Right of Way: $2,567,000 |Construction: $20,221,000 CONSEQUENCES OF DELAYING PROJECT Kagy Boulevard is near vehicular capacity and lacks bike and pedestrian infrastructure in sections, increasing safety risks as development continues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Budget amounts reduced to include only the City’s contribution. Timing has been revised based on updated project funding agreement with MDT after MPDG Rural grant award was received. Prior CIP assumed City would administer grant, if awarded. Cash-in-Lieu of Infrastructure collected from adjacent development has been deposited in the Street Reconstruction Fund for use on the Kagy project. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Reconstruction $0 $310,000 $0 $0 $0 $0 Street Impact Fee $0 $2,690,000 $0 $0 $0 $0 Total $0 $3,000,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 214 of 383 233 Curb Spot Repair (SCR01) FUND DEPARTMENT PROJECT TYPE Street Reconstruction Streets Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 1 FUNDING SOURCE(S) AMOUNT Assessment Revenue $733,500 Total Scheduled Project Cost $733,500 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT Curb and gutter is a critical part of the City’s street network. When a pedestrian ramp is installed, many times the adjacent curbs need to be replaced in order to get drainage to continue at the new ramp. Smaller curb repairs can be necessary rather than replacing a whole block. These repairs result in improved Stormwater control and facilitates better street sweeping. Additionally, broken curbs can be hazardous to vehicle tires. These improvements can be combined with ADA ramp replacement work and inlet replacement work. CONSEQUENCES OF DELAYING PROJECT Delays to this project will continue defering necessary maintenance. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Continuation of annual funding in FY30. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Street Reconstruction $114,400 $124,400 $135,000 $146,200 $158,200 $169,700 Adopted FY26-30 Capital Improvement Plan Page 215 of 383 234 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 216 of 383 235 VEHICLE MAINTENANCE Adopted FY26-30 Capital Improvement Plan Page 217 of 383 236 Vehicle Maintenance Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 220 VM08 Mobile Column Wheel Lifts $ 52,000 $ -$ -$ -$ -$ 52,000 221 VM09 Vehicle Maintenance Spill Response Unit - 90,000 - - - 90,000 222 VM10 Vehicle Maintenance Parts Truck - - 81,000 - - 81,000 Total $ 52,000 $ 90,000 $ 81,000 $ -$ -$ 223,000 Vehicle Maintenance Unscheduled Projects Project Code Project Name Amount Description STR143 Add Air Conditioning to Vehicle Maintenance Shop $40,000 Summer temperatures have continued to increase year-over-year due to climate change, resulting in the need to consider air conditioning in the Vehicle Maintenance Shop. This project has been Unscheduled to reduce assessment impacts. $40,000 Adopted FY26-30 Capital Improvement Plan Page 218 of 383 237 Map of Vehichle Maintenance Projects Adopted FY26-30 Capital Improvement Plan Page 219 of 383 238 Mobile Column Wheel Lifts (VM08) FUND DEPARTMENT PROJECT TYPE Vehicle Maintenance Vehicle Maintenance Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Interfund Transfers $52,000 Total Scheduled Project Cost $52,000 STRATEGIC PLAN, IF APPLICABLE 7.3 Best Practices, Creativity & Foresight DESCRIPTION OF PROJECT This item funds Mobile Column Wheel Lifts to lift Heavy Duty vehicles that do not fit on the existing four post lift, as well as give an additional way to lift vehicles for preventative and reactive repairs. CONSEQUENCES OF DELAYING PROJECT Delay will risk fewer preventative and reactive repairs that require the lifting of Heavy Duty vehicles. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Vehicle Maintenance $0 $52,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 220 of 383 239 Vehicle Maintenance Spill Response Unit (VM09) FUND DEPARTMENT PROJECT TYPE Vehicle Maintenance Vehicle Maintenance Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Interfund Transfer $90,000 Total Scheduled Project Cost $90,000 STRATEGIC PLAN, IF APPLICABLE 6.2 Protect Local Air Quality DESCRIPTION OF PROJECT This item funds the replacement of Vehicle Maintenance’s 1987 3/4-ton Spill Response Truck (#1056). Due to varying size of spills, the unit shall consist of a 1/2-ton or smaller crew cab hybrid or electric truck for small spills, and small enclosed trailer for large. CONSEQUENCES OF DELAYING PROJECT Delay will risk environmental impacts from emissions, lack of safety for passengers (no airbags, antilock brakes, traction control, stability control, etc.) CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY27 anticipated cost added due to increased down time and maintenance requirements to keep existing truck operable. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Vehicle Maintenance $0 $0 $90,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 221 of 383 240 Vehicle Maintenance Parts Truck (VM10) FUND DEPARTMENT PROJECT TYPE Vehicle Maintenance Vehicle Maintenance Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Interfund Transfer $81,000 Total Scheduled Project Cost $81,000 STRATEGIC PLAN, IF APPLICABLE 6.2 Protect Local Air Quality DESCRIPTION OF PROJECT This item funds the replacement of the department’s 2008 1/2-ton Parts Truck (#3417). Unit shall consist of 1/2-ton or smaller crew cab electric pickup. CONSEQUENCES OF DELAYING PROJECT Delay will risk environmental impacts from emissions, lack of passenger seating requiring more vehicles used to transport crew, lack of traction and stability control in a winter climate. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY28 anticipated cost added due to increased down time and maintenance requirements to keep existing truck operable. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Vehicle Maintenance $0 $0 $0 $81,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 222 of 383 241 WASTEWATER Adopted FY26-30 Capital Improvement Plan Page 223 of 383 242 Wastewater Fund Scheduled Projects (continued on next page) Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 228 WW09 Annual 6-Inch Wastewater Pipe Replacement $ 811,200 $ 984,300 $ 1,169,900 $ 1,399,200 $ 1,400,000 $ 5,764,600 229 WW08 Wastewater Pipe Replacement 762,000 - 1,449,000 1,149,700 1,050,000 4,410,700 230 WWIF58 Fowler Sewer Upgrade 521,700 - - - - 521,700 231 WW138 MSU Interceptor 443,500 2,613,900 - - - 3,057,400 232 WW121 Water Reclamation Facility (WRF) Motor Control Center (MCC) Replacements 282,000 - - - - 282,000 233 WW114 Dump Truck 236,000 - - - - 236,000 234 WW69 Small Works Projects 162,200 168,700 175,500 182,500 190,000 878,900 235 WW92 Dewater Pumps Replacement 162,200 - - - - 162,200 236 WW115 3/4 Ton Pickup Replacement 95,000 - - - - 95,000 237 WW148 Food Truck and RV Dump Site Joint Project with Gallatin County 86,000 - - - - 86,000 238 WW113 Skid Steer Loader Replace 72,500 - - - - 72,500 239 WW112 East Gallatin River Data Collection 66,200 69,500 72,900 75,000 80,000 363,600 240 WW141 Treatment Wetlands 50,000 50,000 - - 525,000 625,000 241 WW147 Joint DEQ/City Water Reclamation Biologically Available Phosphorus Study 50,000 - - - - 50,000 242 WW07 Annual Wastewater Pipe Replacement Design 34,300 35,700 37,100 38,600 40,000 185,700 243 WW120 Replace Sewer Jetter - 462,000 - - - 462,000 244 WW116 Peps Lower Rebuild - 380,000 - - - 380,000 245 WWIF20 N. Frontage Interceptor - 304,000 - 1,791,700 - 2,095,700 246 WW119 Replace #3620 1 Ton - 100,000 - - - 100,000 247 WW118 Replace #3360 3/4 Ton with 1 Ton - 72,000 - - - 72,000 248 WW139 4th Avenue, Babcock Street and Grand Avenue Sewer Main Replacement - 69,700 410,900 - - 480,600 249 WW149 Forklift - 50,000 - - - 50,000 250 WW140 N 9th Avenue, W Villard Street, and S 9th Avenue Sewer Main Replacement - - 321,000 1,891,900 - 2,212,900 251 WW117 Boiler Replacement - - 150,000 - - 150,000 252 WW150 Huber Headworks Screen Plates - - 100,000 - - 100,000 253 WW128 Replace Ford F150 1/2 Ton - - 80,500 - - 80,500 254 W135 Replace Mini Excavator - - 60,400 - - 60,400 255 WW137 Replace Sewer Easement Machine - - - 130,000 - 130,000 256 WW136 New 1/2 Ton Utility Truck - - - 84,000 - 84,000 Adopted FY26-30 Capital Improvement Plan Page 224 of 383 243 Wastewater Fund Scheduled Projects Continued Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 257 WW144 New Combination Vaccuum / Jetter Truck - - - - 745,000 745,000 258 WW153 N 11th Ave Sewer Main Replacement - - - - 698,800 698,800 259 WWW03 Midsized Excavator - - - - 165,000 165,000 260 WWW05 New Tandem Axle Dump Truck - - - - 148,500 148,500 261 WW145 New 1 Ton Service Truck - - - - 120,000 120,000 262 WW151 Digester Cleaning - - - - 100,000 100,000 263 WW146 Replace 1/2 Ton Truck - - - - 89,000 89,000 264 WW152 Solids Building Roof - - - - 80,000 80,000 265 WWW04 New Equipment Trailer - - - - 25,000 25,000 Total $ 3,834,800 $ 5,359,800 $ 4,027,200 $ 6,742,600 $ 5,456,300 $ 25,420,700 Adopted FY26-30 Capital Improvement Plan Page 225 of 383 244 Wastewater Fund Unscheduled Projects Project Code Project Name Amount Description WW142 WRF Limit of Technology Nutrient Process Upgrades $98,000,000 Nutrient water quality standards and compliance is a complex and contentious issue in Montana with many current unknowns and uncertainties that make capital project planning a significant challenge. DEQ is currently in the process of developing new nutrient water quality standards rules that once adopted and approved by EPA will lay the groundwork for establishing Water Reclamation Facility (WRF) discharge permit limits for nutrients. The WRF must comply with nutrient permit limits established by DEQ to ensure the nutrient water quality standard is achieved. This $98 million capital outlay represents the cost to construct the current limit of technology for nutrient treatment performance for both total nitrogen (TN) and total phosphorus (TP). It is presently unknown whether the nutrient water quality standards will be established by DEQ at such a stringent level to necessitate construction to the limit of technology for both TN and TP. This would be the worst-case cost scenario. The $98 million upgrade identified in the 2022 WRF Facility Plan Update includes construction of: a 4th bioreactor, post anoxic carbon addition for bioreactors 1 - 4, a side stream enhanced biological phosphorous removal process, a tertiary membrane filtration process and filter pump station, and new chemical and coagulant dosing systems. A $98 million dollar project will have a significant rate impact, and debt coverage requirements will not allow the use of sewer revenue bonds to fund this project. The City is working closely with the Montana League of Cities and Towns, the Montana Department of Environmental Quality (DEQ), and other state-wide partners to work towards reasonable policy solutions that mitigate the impact on rate payers while encouraging appropriate nutrient water quality standards. This project is not currently included in long-term financial models or rate setting considerations. WW141 Treatment Wetlands 4,750,000 This project involves the construction of a vertical flow tertiary treatment wetland at the Water Reclamation Facility. Wetlands treatment may present an elegant solution to achieve water quality standards utilizing natural treatment methods to remove an additional fraction of total nitrogen and total phosphorus prior to discharge to the East Gallatin River. Effectiveness of wetland treatment is being evaluated by Montana State University (MSU) under a grant agreement with the City and Montana Department of Environmental Quality (DEQ). Upon completion of the pilot, project and resolution of nutrient water quality standards by the State of Montana and DEQ, this project may show promise as a final nutrient treatment polishing process, possibly eliminating the need for costly limit of technology nutrient treatment. The limit of technology treatment defined in the City’s Water Reclamation Facility Plan comes at capital cost of $92.5 million with extremely high operational costs. A wetlands treatment polishing step may produce similar results but at a much lower cost. Initial results of the joint MSU/DEQ/City pilot work are promising, so the next step is continuation of the pilot study joint effort with MSU to develop design information for full scale wetland design. The continuation of pilot study work is programmed in fiscal year 2026 and fiscal year 2027 with full-scale design work programmed in fiscal year 30. Construction phase services are anticipated in the unscheduled portion of the CIP, but the costs of a full-scale facility are not yet known. A full-scale facility can only be roughly estimated at $10,000,000 until further pilot scale work is completed. Total $102,750,000 Adopted FY26-30 Capital Improvement Plan Page 226 of 383 245 Map of Wastewater Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 227 of 383 246 Annual 6-Inch Wastewater Pipe Replacement (WW09) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $5,764,600 Total Scheduled Project Cost $5,764,600 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT The 6-inch wastewater replacement program sets aside funds to replace older failing and undersized wastewater collection pipes. The program is designed to replace approximately 19 miles of undersized main over a 25-year period. All 6-inch pipes will be upsized to the minimum 8-inch city standard or upsized based on the City's Wastewater Facility Plan and hydraulic model. Priority for 6-inch replacement projects will generally be associated with the City's street reconstruction program, new development, and system risk in relation to other 6-inch pipes within the system. Remaining funds will be used to update pipe condition assessment information to better inform the City's capital program and future project prioritization. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include deferred maintenance and increased risk of sewage backups. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $650,000 $811,200 $984,300 $1,169,900 $1,399,200 $1,400,000 Adopted FY26-30 Capital Improvement Plan Page 228 of 383 247 Wastewater Pipe Replacement (WW08) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $4,410,700 Total Scheduled Project Cost $4,410,700 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT The wastewater pipe replacement program sets aside funds to assess and replace failing or high-risk wastewater collection pipes. Priority for replacement or rehabilitation projects will generally be associated with system risk and capacity, and pipe replacements will be coordinated with the City's annual street reconstruction program. Remaining funds will be used to update pipe condition assessment information to better inform the City's capital program and future project prioritization. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include deferred maintenance and increased risk of sewage backups. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET FY26 amount has been reduced due to concurrently planned projects not moving forward and contractor availability. FY30 cost added. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Wastewater $1,430,000 $762,000 $0 $1,449,000 $1,149,700 $1,050,000 Adopted FY26-30 Capital Improvement Plan Page 229 of 383 248 Fowler Sewer Upgrade (WWIF58) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 3 FUNDING SOURCE(S) AMOUNT Rate Revenue Impact Fee Revenue $521,700 $466,800 Total Scheduled Project Cost $988,500 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will construct a 24-inch sanitary sewer main in conjunction with Fowler Road construction project. Sewer main construction will occur from Oak to Durston. This work was initially thought to be 100% capacity expanding as the original pipe was going to be left in place. Given the latest iteration of the design, the existing pipe will be abandoned, so a portion of this project is now in the wastewater fund. Total Project Cost: $1,134,199 | Design (FY25): $145,600 Construction and Construction Administration (FY26): $988,500 (60.6% wastewater fund and 39.4% wastewater impact fee fund totals split over 2 years matching the capacity upgrade of the sewer construction work). CONSEQUENCES OF DELAYING PROJECT If not constructed simultaneous with the Fowler Road Street Impact Fee project, this sanitary sewer must be constructed in the next 5 years, which would subsequently damage new pavement associated with the Fowler Road Project and be much more expensive to construct. The sewer main is necessary to accommodate redevelopment growth in the south and central parts of the City. If not constructed, growth will be restricted until the sewer capacity is upgraded. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Shifted some funds from wastewater impact fees into wastewater fund due to changes in the design of this project resulting in replacement of the existing pipe that is under capacity. The replacement portion of the project is now covered by the Wastewater Fund while the increased pipe size, which is capacity expanding, is covered by the impact fee program. The funding split is reflected below. Line item WW08 was reduced to make this a budget neutral change. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $521,700 $0 $0 $0 $0 Wastewater Impact Fee $145,600 $466,800 $0 $0 $0 $0 Total $145,600 $988,500 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 230 of 383 249 MSU Interceptor (WW138) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue Impact Fee Revenue $3,057,400 $2,711,300 Total Scheduled Project Cost $5,768,700 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT A critical section of existing sewer main begins on Kagy Blvd and Hoffman Drive as 10-inch diameter asbestos concrete pipe and continues to run north through Mason, Wilson Ave, College, 4th Avenue, and finally ending on 6th Ave. Once the sewer main reaches Olive Street, the diameter has increased to 18-inches in size. Portions of the existing main have been identified as high-risk given both the condition and age of the existing asset. In addition, the City’s hydraulic model has shown that several segments of main are near hydraulic capacity during wet weather modeling scenarios. The project includes both the replacement and upsizing of approximately 10,250 ft of existing sewer main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions while decreasing overall risk associated with critical aging infrastructure. The project was recommended to occur within the City’s 5-year planning horizon and is in conformance with the City’s Wastewater Collection Facility Master Plan. Engineering is scheduled in FY26 and construction in FY27. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include limitation on development immediately south of Kagy and east of 11th Ave as well as the inability to serve new projects from MSU. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $443,500 $2,613,900 $0 $0 $0 Wastewater Impact Fee $0 $393,300 $2,318,000 $0 $0 $0 Total $0 $836,800 $4,931,900 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 231 of 383 250 Water Reclamation Facility (WRF) Motor Control Center (MCC) Replacements (WW121) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS None Class 2 FUNDING SOURCE(S) AMOUNT Rate Revenue $282,000 Total Scheduled Project Cost $282,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project will replace three existing motor control centers (MCC) at the water reclamation facility that are original to the facility and at the end of their useful life. These motor control centers provide electrical controls to activate critical equipment that subsequently treats the City’s wastewater before being discharged to the E. Gallatin River. The total project cost is expected to be $632,000 including $350,000 which will be spent prior to the capital planning period 2026-2030. CONSEQUENCES OF DELAYING PROJECT Without replacement, critical MCC failure will lead to wastewater treatment system upsets, with subsequent reductions in water quality and Montana DEQ discharge permit violations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Consolidated MCC 1 (WW121) and MCC 2 (WW122) into a single project and added MCC 3, since these replacements were all designed concurrently by engineer consultant. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required at a later date. FUND FY25 Estimated FY26 FY27 FY28 FY29 FY30 Wastewater $64,000 $282,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 232 of 383 251 Dump Truck (WW114) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $236,000 Total Scheduled Project Cost $236,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This projects consists of replacing the existing dump truck that is primarily used for hauling materials associated with excavation for water and sewer repair but is also used to haul snow in the winter. This project will replace an existing dump truck that was purchased in 2011. CONSEQUENCES OF DELAYING PROJECT If this replacement is delayed, the truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $236,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 233 of 383 252 Small Works Projects (WW69) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS Unknown N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $878,900 Total Scheduled Project Cost $878,900 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT Repair and replacement of equipment is an ongoing job at the Bozeman Water Reclamation Facility. These funds would be used to repair or replace equipment that fails unexpectedly in an emergency situation. An unforeseen mechanical failure needs to be remedied quickly to protect the quality of facility effluent discharged into the East Gallatin. CONSEQUENCES OF DELAYING PROJECT Deferred maintenance cost increases will result in the delaying funding for this project as well as significant water quality impacts to the E. Gallatin River. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $156,000 $162,200 $168,700 $175,500 $182,500 $190,000 Adopted FY26-30 Capital Improvement Plan Page 234 of 383 253 Dewater Pumps Replacement (WW92) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $162,200 Total Scheduled Project Cost $162,200 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project would provide for the replacement of three crucial pump units that are nearing the end of their reliable life. There are two, 20- horse-power pumps as well as one, five-horse-power pump that require replacement. CONSEQUENCES OF DELAYING PROJECT Deferred maintenance cost increases will result if the project is delayed as well as impact ability to perform maintenance on many elements of the water reclamation facility. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $162,200 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 235 of 383 254 3/4 Ton Pickup Replacement (WW115) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $95,000 Total Scheduled Project Cost $95,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT One ton service trucks are first line trucks which reponds to emergencies and are equipped with tools to handle most of our work and are assigned to foreman and leadworkers. They are the one of the primary assets on our excavations. This project will replace an existing ¾ ton truck with a one ton truck outfitted to accommodate a new leadworker position granted in FY 2024. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, the truck is more likely to have maintenance issues and may not have the necessary state of readiness. In addition, this truck will be replaced with something more suitable to handle a new leadworker position and the growth in the City of Bozeman. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $95,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 236 of 383 255 Food Truck and RV Dump Site Joint Project with Gallatin County (WW148) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Rate Revenue $86,000 Total Scheduled Project Cost $86,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This is a joint project between the County and City. The amounts in the CIP reflect the City’s anticipated cost only. The project would install a sanitary sewer dump station site serving food trucks and RVs, and charge customerson a per-use basis. The City's portion of the project would be a sanitary sewer service from the City's sewer main in E. Tamarack Street onto the County Fairgrounds property as well as a grease interceptor on the Fairgrounds property. The County would provide the land and an automated charging station to charge customers on a per use basis. Currently, there is no location for food trucks to dump their grey waste, which is heavily laden with grease. Grease has a significantly disruptive impact on the City's sanitary sewer system if not treated properly. The City-County Health Department recently approached the City to help develop a solution to this issue and provide food truck vendors a legal location to dispose of their liquid kitchen waste. The site would also serve as a single-use RV dump site. CONSEQUENCES OF DELAYING PROJECT There will be no adequate location for food truck waste to be dischared to the City's sanitary sewer system until this system is installed. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a new item to the CIP. The City-County Health Department approached the City identifying this as an urgent issue. Currently, food truck waste is being illegally dumped into various locations throughout the City and County, which is very difficult to track and subsequently enforce illicit discharge or pretreatment regulations. The City is impacted by illegal dumping into the sanitary sewer system via grease accumulation that causes sewer backups, property damage, and raw sewage exposure to the public. Some of the illegal dumping also occurs directly to the environment causing environmental contamination and impacts to the ecosystem. The goal is to provide a location to food truck vendors to legally dump their waste in a way that is protective of the environment, whereas there isn’t a location to legally dispose of the waste currently. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $86,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 237 of 383 256 Skid Steer Loader Replace (WW113) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $72,500 Total Scheduled Project Cost $72,500 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT The Water and Sewer Division uses this equipment primarily for manhole and valve adjusting, site cleanup, paving, loading, and snow removal. This project will replace an existing skid steer loader. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, this equipment is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $72,500 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 238 of 383 257 East Gallatin River Data Collection (WW112) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Other OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $363,600 Total Scheduled Project Cost $363,600 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This item includes consultant services to sample water quality in the East Gallatin River and update our water quality model for the East Gallatin. This will be used to support the negotiations of Water Reclamation Facility discharge permitting. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include reduced understanding of water quality conditions in the East Gallatin impacting the City’s support for discharge permit negotiations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Added FY29 and FY30. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $63,000 $66,200 $69,500 $72,900 $75,000 $80,000 Adopted FY26-30 Capital Improvement Plan Page 239 of 383 258 Treatment Wetlands (WW141) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS High Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $625,000 Total Scheduled Project Cost $625,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project involves the construction of a vertical flow tertiary treatment wetland at the Water Reclamation Facility. Wetlands treatment may present an elegant solution to achieve water quality standards utilizing natural treatment methods to remove an additional fraction of total nitrogen and total phosphorus prior to discharge to the East Gallatin River. Effectiveness of wetland treatment is being evaluated by Montana State University (MSU) under a grant agreement with the City and Montana Department of Environmental Quality (DEQ). Upon completion of the pilot, project and resolution of nutrient water quality standards by the State of Montana and DEQ, this project may show promise as a final nutrient treatment polishing process, possibly eliminating the need for costly limit of technology nutrient treatment. The limit of technology treatment defined in the City’s Water Reclamation Facility Plan comes at capital cost of $92.5 million with extremely high operational costs. A wetlands treatment polishing step may produce similar results but at a much lower cost. Initial results of the joint MSU/DEQ/City pilot work are promising, so the next step is continuation of the pilot study joint effort with MSU to develop design information for full scale wetland design. The continuation of pilot study work is programmed in fiscal year 2026 and fiscal year 2027 with full-scale design work programmed in fiscal year 30. Construction phase services are in the unscheduled portion of the CIP. Costs are unknown, but a full-scale facility can be roughly estimated at $10,000,000 until further work is completed. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project may be compliance issues with the City’s Montana Pollutant Discharge Elimination System permit requirements. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The current wetland pilot project jointly funded by MSU, DEQ, and the City has proven highly successful. The next step will be to continue efforts by MSU to provide wetlands design criteria over the next two years including funding in FY26 and FY27. Wetlands design criteria will be essential to taking the next design step. Full-scale design work is programmed in FY30 with construction to follow in subsequent fiscal years. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $50,000 $50,000 $0 $0 $525,000 Adopted FY26-30 Capital Improvement Plan Page 240 of 383 259 Joint DEQ/City Water Reclamation Biologically Available Phosphorus Study (WW147) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Other OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue Montan DEQ $50,000 Total Scheduled Project Cost $50,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT The Montana Department of Environmental Quality (DEQ) proposed a joint project between the City and DEQ that would be an MSU research project. The project would be to study biologically available phosphorus in the City's Water Reclamation Facility discharge. This work could have significant positive impacts in understanding both ongoing protection of water quality in the E. Gallatin as well as potentially reducing wastewater treatment costs in the future. This funding would support MSU graduate level research work. This work builds on recent successful research and collaboration between MSU, DEQ, and the City described in the Treatment Wetlands Project – WW141. The project may benefit the City with reduced requirements associated with its discharge permit, subsequently reducing long-term capital investments and ongoing operations and maintenance costs. The work could also benefit other municipalities throughout the State. As such, DEQ is approaching other municipalities to support this project with funding as well. CONSEQUENCES OF DELAYING PROJECT The consequence of delaying is the potential loss of positive impacts on future discharge permit requirements and potentially reduced treatment costs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a new project proposed as an opportunity by Montana DEQ. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $50,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 241 of 383 260 Annual Wastewater Pipe Replacement Design (WW07) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Rate Revenue $185,700 Total Scheduled Project Cost $185,700 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This item is primarily surveying consulting services. In-house staff complete the design work for these projects. This Item provides for surveying work to be completed every year in anticipation of the annual pipe replacement/rehabilitation projects. Other elements of this item may include geotechnical consultant services or other design support services. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include deferred maintenance and increased risk of sewage backups. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $33,000 $34,300 $35,700 $37,100 $38,600 $40,000 Adopted FY26-30 Capital Improvement Plan Page 242 of 383 261 Replace Sewer Jetter (WW120) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $462,000 Total Scheduled Project Cost $462,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This truck is used to clean and maintain sewers to prevent backups and reduce odors. The project will replace an existing truck that was purchased in 2013. CONSEQUENCES OF DELAYING PROJECT If this project is delayed, the truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $462,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 243 of 383 262 Peps Lower Rebuild (WW116) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $380,000 Total Scheduled Project Cost $380,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project will entail the primary effluent pumps lower end pump section to be pulled, inspected, and repaired/replaced at the Water Reclamation Facility. CONSEQUENCES OF DELAYING PROJECT Deferred maintenance cost increases will result in the delay of this project. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The cost was increased by $42.5K to reflect more realistic inflationary increases for the equipment. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $380,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 244 of 383 263 N. Frontage Interceptor (WWIF20) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue Impact Fee Revenue $2,095,700 $5,721,600 Total Scheduled Project Cost $7,817,300 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will either replace and upsize, or parallel certain portions of the sanitary sewer along the 11,500 feet length of the existing North Frontage Road Interceptor. The North Frontage Road Interceptor supports large portions of the City’s southeast and eastern sewersheds. The extents of the project is generally located between Springhill Road and Bridger Drive. Portions of the interceptor have been shown to have an increased risk of failure due to the age and condition of the asset while other segments have been identified in the City’s hydraulic model to be near hydraulic capcaity during wet weather modeling scenarios. The project consists of two main components: first, the replacement of existing parallel trunk sewer, which includes the replacement and upsizing of the worst condition parallel interceptor main; second, the installation of a new parallel interceptor main along portions of the existing interceptor that currently only have a single segment of main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build- out conditions while decreasing overall risk along the interceptor corridor. Lastly, the existing interceptor main that is not mitigated as part of the project will be inspected for current condition and either replaced or rehabilitated at a later date, thus utilizing the City’s existing assets to their full expected life-cycle extent. The project will conform to the City’s Wastewater Collection Facility Master plan. Engineering is scheduled in FY27 and construction in FY29. CONSEQUENCES OF DELAYING PROJECT Limit growth until the upgrade is completed if the pipe is not upgraded prior to reaching capacity of the line. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Engineering costs have been moved up to FY27 to be completed in conjunction with the design of Shared Used Path: Frontage project (A&C024). FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $304,000 $0 $1,791,700 $0 Wastewater Impact Fee $0 $0 $830,000 $0 $4,891,600 $0 Total $0 $0 $1,134,000 $0 $6,683,300 $0 Adopted FY26-30 Capital Improvement Plan Page 245 of 383 264 Replace #3620 1 Ton (WW119) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $100,000 Total Scheduled Project Cost $100,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT One ton service trucks are first line trucks which reponds to emergencies and are equipped with tools to handle most of our work and are assigned to foreman and leadworkers. They are the one of the primary assets on our excavations. This project will replace an existing one ton truck that was purchased in 2012. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, this truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $100,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 246 of 383 265 Replace #3360 3/4 Ton with 1 Ton (WW118) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $72,000 Total Scheduled Project Cost $72,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This 3/4 ton pickup is primarily used for flowing hydrants and snow plowing but has utility purpose for small jobs as needed. This project will replace an existing truck that was purchased in 2007. This project would replace any 3/4 ton truck with a one ton truck on the recommendation of Vehicle Maintenance. The increase in cost is miniscule for the extra utility 1 ton truck provides in towing and hauling. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, this truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET In the previous CIP, this project involved replacing a ¾-ton pickup with another of the same size. The additional $4,000 reflects the decision to upgrade to a one-ton truck for improved reliability. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $72,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 247 of 383 266 4th Avenue, Babcock Street and Grand Avenue Sewer Main Replacement (WW139) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue Impact Fee Revenue $480,600 $270,300 Total Scheduled Project Cost $750,900 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT A critical section of existing 8-inch sanitary sewer main located along 4th Avenue, Babcock Street, and Grand Avenue has been identified for replacement and upsizing. The 8-inch existing vitrified clay pipe has been identified as high-risk given the condition of the asset. In addition, the City’s hydraulic model has shown that several segments of main to be near hydraulic capacity during wet weather modeling scenarios. The project includes both the replacement and upsizing of approximately 1,300 feet of existing sewer main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions, while decreasing overall risk associated with critical aging infrastructure. The project is recommended to occur within the City’s 5- year short-term planning horizon and is in conformance with the City’s Wastewater Collection Facility Plan Update. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include limitation on development served by these pipes and potential sewage backups impacting sewer customers. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $69,700 $410,900 $0 $0 Wastewater Impact Fee $0 $0 $39,200 $231,100 $0 $0 Total $0 $0 $108,900 $642,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 248 of 383 267 Forklift (WW149) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Vehicle OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $50,000 Total Scheduled Project Cost $50,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project is for a new forklift to increase safety associated with lifting and moving 1600 LB polymer totes, pallets, and equipment. CONSEQUENCES OF DELAYING PROJECT Continue renting equipment when needed, and continue to use the skid steer. This is sub-optimal from a safety perspective. As the skidsteer is not intended to be used to offload full tractor trailers. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This prioritization would increase requested funding by the $50,000 requested. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $50,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 249 of 383 268 N 9th Avenue, W Villard Street, and S 9th Avenue Sewer Main Replacement (WW140) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue Impact Fee Revenue $2,212,900 $330,700 Total Scheduled Project Cost $2,543,600 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT A critical section of existing sewer main begins on South 9th Street and continues north through Midtown, ultimately ending at Durston Ave. The existing vitrified clay pipe has been identified as high-risk given both the condition and age of the asset. In addition, the City’s hydraulic model has shown that several segments of main to be near hydraulic capacity during wet weather modeling scenarios. The project includes either replacement or upsizing of approximately 3,000 ft of existing sewer main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions, while decreasing overall risk associated with critical aging infrastructure. The project was recommended to occur withinthe City’s 5-year short-term planning horizon and is in conformance with the City’s Wastewater Collection Facility Plan Update. Engineering is scheduled in FY28 and construction in FY29. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include limitation on development served by these pipes and potential sewage backups impacting sewer customers. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $321,000 $1,891,900 $0 Wastewater Impact Fee $0 $0 $0 $48,000 $282,700 $0 Total $0 $0 $0 $369,000 $2,174,600 $0 Adopted FY26-30 Capital Improvement Plan Page 250 of 383 269 Boiler Replacement (WW117) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $150,000 Total Scheduled Project Cost $150,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT The water reclamation facility (WRF) currently operates with three boilers: two conventional boilers and one condensing boiler. Rehabilitation of these existing boilers is required due to the resulting improved quality of biogas and a reduction in corrosion. CONSEQUENCES OF DELAYING PROJECT If the boilers are not proactively replaced, they will proceed to catastrophic failure resulting in process failures at the WRF. These process failures would result in solids treatment processes shutting down with subsequent major odor impacts on the community and inability to dispose of solids with subsequent stockpiling on site. Further, buildings at the WRF would not have heat in the winter. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Reduced FY28 cost to $150,000. Recent changes in gas composition driven by our “Micro-Aeration Process” have yielded positive result and reduced the wear on the bio-gas boilers, such that we can reduce the required service. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $150,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 251 of 383 270 Huber Headworks Screen Plates (WW150) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $100,000 Total Scheduled Project Cost $100,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project entails the replacement of perforated plates and installation for Huber Fine Screens in Headworks. This is a big re-build project, we were made aware of the necessity through our vendor tracking the wear in the panels over time. These screens wear over time and are 14 years old currently and will be 17 years old at the time of proposed replacement. CONSEQUENCES OF DELAYING PROJECT Headworks failure and increased potential for debris passing into downstream process and damaging downstream equipment are possible consquences of delaying this project. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a new project in FY28. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $100,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 252 of 383 271 Replace Ford F150 1/2 Ton (WW128) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $80,500 Total Scheduled Project Cost $80,500 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Half ton trucks are used for smaller operations in our division. This project will replace a ½ ton vehicle that was purchased in 2013. CONSEQUENCES OF DELAYING PROJECT If this replacement is delayed, the truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $80,500 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 253 of 383 272 Replace Mini Excavator (W135) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $120,800 Total Scheduled Project Cost $120,800 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project is for the purchase of a mini excacator. Previously, the Water Department jointly purchased a mini excavator with the Streets Department, and the mini excavator will be 15 years old at the time of replacement. This equipment is primarily used to dig and repair water and sewer components. Mini excavators are also suitable to fit in tighter spaces than the backhoes in our fleet. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, equipment is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $60,400 $0 $0 Water $0 $0 $0 $60,400 $0 $0 Total $0 $0 $0 $120,800 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 254 of 383 273 Replace Sewer Easement Machine (WW137) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $130,000 Total Scheduled Project Cost $130,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT A sewer easement machine’s primary use is to clean and maintain sewer mains in areas that will not fit normal operating equipment. The existing equipment was purchased used over 25 years ago and has difficulty starting. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, the equipment could completely fail when we need it. Custom fabrication would likely need to take place if components are damaged because it is very old. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $130,000 $0 Adopted FY26-30 Capital Improvement Plan Page 255 of 383 274 New 1/2 Ton Utility Truck (WW136) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $84,000 Total Scheduled Project Cost $84,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project is to purchase a new half ton truck to facilitate staff growth and maintain small scale operations in water and sewer. CONSEQUENCES OF DELAYING PROJECT If we delay the purchase, we will not have enough transportation equipment for operations personnel. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $84,000 $0 Adopted FY26-30 Capital Improvement Plan Page 256 of 383 275 New Combination Vaccuum / Jetter Truck (WW144) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $745,000 Total Scheduled Project Cost $745,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT The City currently has two of these vehicles, and they are invaluable tools that are mostly used for vacuum excavation and cleaning and vacuuming debris from sewer mains. This project would provide new equipment to accommodate new growth in the City of Bozeman and its operations. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include reduced level of service due to growth. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $745,000 Adopted FY26-30 Capital Improvement Plan Page 257 of 383 276 N 11th Ave Sewer Main Replacement (WW153) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $698,800 Total Scheduled Project Cost $698,800 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Replace the existing 24" vitrified clay pipe with new 24" PVC along N 11th Ave south of Durston Rd and before the 90 degree turn East. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include deferred maintenance and increased risk of sewage backups. This is a a critical repair of the 19th Ave / Kagy Intercepter based on the City's Risk Model and Hydraulic Model. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $698,800 Adopted FY26-30 Capital Improvement Plan Page 258 of 383 277 Midsized Excavator (WWW03) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Equipment OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $330,000 Total Scheduled Project Cost $330,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Our excavation fleet currently includes six backhoes and a mini-excavator. We need something that will allow us to excavate to 20 feet deep in light of the amount of infrastructure that is that deep in the ground now. This excavator will also provide more versatility as well in other operations. This purchase is split with the water fund. CONSEQUENCES OF DELAYING PROJECT Delaying this project would necessitate contracting work out or renting on an emergency basis. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $165,000 Water $0 $0 $0 $0 $0 $165,000 Total $0 $0 $0 $0 $0 $330,000 Adopted FY26-30 Capital Improvement Plan Page 259 of 383 278 New Tandem Axle Dump Truck (WWW05) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $297,000 Total Scheduled Project Cost $297,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This dump truck will be primarily used to haul materials and trailers across town to excavation sites. It is a purchase to accommodate a growing City and workforce. CONSEQUENCES OF DELAYING PROJECT Without this new equipment, the work would need to be contracted out. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $148,500 Water $0 $0 $0 $0 $0 $148,500 Total $0 $0 $0 $0 $0 $297,000 Adopted FY26-30 Capital Improvement Plan Page 260 of 383 279 New 1 Ton Service Truck (WW145) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $120,000 Total Scheduled Project Cost $120,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT One ton service trucks are first line trucks which respond to emergencies, equipped with tools to handle most of our work, and are assigned to foremen and lead workers. They are the one of the primary assets on our excavations. This purchase will accommodate a growing city and staff. CONSEQUENCES OF DELAYING PROJECT Delaying this project will result in reduced levels of service due to growth. Reduced levels of service would include increased response times to emergencies and inability to meet existing maintenance schedules for regular sewer system maintenance. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $120,000 Adopted FY26-30 Capital Improvement Plan Page 261 of 383 280 Digester Cleaning (WW151) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $100,000 Total Scheduled Project Cost $100,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT Digester maintenance requires periodic emptying and removal of debris built up over time in the City’s solids processing system at the Water Reclamation Facility. Digesters are a treatment system at the plant that process biosolids before ultimate disposal at the Logan Landfill. A good Preventive schedule for these tanks is 5 to 10 years each, (we have 3 currently and building the 4th soon). These tanks must be proactively cleaned to maintain treatment function, avoid in-service failures, and maintain our ability to meet EPA permit requirements for the facility. CONSEQUENCES OF DELAYING PROJECT Delaying the project will significantly increase the liklihood of solids-handling failure and non-compliance with EPA 503 permit requirements leading to increased solids disposal costs and likely fines for not meeting permit conditions. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $100,000 Adopted FY26-30 Capital Improvement Plan Page 262 of 383 281 Replace 1/2 Ton Truck (WW146) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $89,000 Total Scheduled Project Cost $89,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Delaying the project will significantly increase the liklihood of solids-handling failure and non-compliance with EPA 503 permit requirements leading to increased solids disposal costs and likely fines for not meeting permit conditions. CONSEQUENCES OF DELAYING PROJECT Without replacement, the exisitng truck is more likely to have maintenance issues. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $89,000 Adopted FY26-30 Capital Improvement Plan Page 263 of 383 282 Solids Building Roof (WW152) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $80,000 Total Scheduled Project Cost $80,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project consists of repair of the Solids Dewatering Building Roof at the Water Reclamation Facility. The existing portion of the roof was identified in the solids expansion as showing deterioration due to biogas boilers exhaust debris accumulation on the surfaces of the roof. We typically expect around a 30 year life on this type of construction and this roof is approaching half way. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include potential leaks and ice damning in winter, increased damage to problem areas. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $80,000 Adopted FY26-30 Capital Improvement Plan Page 264 of 383 283 New Equipment Trailer (WWW04) FUND DEPARTMENT PROJECT TYPE Wastewater Wastewater Operations Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $50,000 Total Scheduled Project Cost $50,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project is for the purchase of an equipment trailer. This trailer will be used primarily to haul excavators and backhoes to excavation sites across town. CONSEQUENCES OF DELAYING PROJECT With the growth of the city and potential equipment satellite sites, it's not going to be sustainable or feasible to transport equipment by driving it directly there. Without this trailer, we will still be able to drive the equipment directly there, but it may be on streets with speed limits that far exceed the capability of the equipment. Travel time will continually increase and it will become more of a safety issue. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater $0 $0 $0 $0 $0 $25,000 Water $0 $0 $0 $0 $0 $25,000 Total $0 $0 $0 $0 $0 $50,000 Adopted FY26-30 Capital Improvement Plan Page 265 of 383 284 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 266 of 383 285 WASTEWATER IMPACT FEE Adopted FY26-30 Capital Improvement Plan Page 267 of 383 286 Wastewater Impact Fee Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 271 WW129 Water Reclamation Facility (WRF) Base Hydraulic Phase 1 $ 1,607,600 $ -$ -$ -$ -$ 1,607,600 272 WWIF63 Gooch Hill Lift Station 1,500,000 1,625,000 9,464,500 - - 12,589,500 273 WWIF58 Fowler Sewer Upgrade 466,800 - - - - 466,800 274 WW131 Water Reclamation Facility (WRF) Base Hydraulic Phase 2 400,000 1,607,700 14,132,300 - - 16,140,000 275 WW138 MSU Interceptor 393,300 2,318,000 - - - 2,711,300 276 WWIF99 Wastewater Development Oversizing 70,000 200,000 500,000 - - 770,000 277 WWIF20 N. Frontage Interceptor - 830,000 - 4,891,600 - 5,721,600 278 WW139 4th Avenue, Babcock Street and Grand Avenue Sewer Main Replacement - 39,200 231,100 - - 270,300 279 WWIF44 Water Reclamation Facility (WRF) Interceptor - - 231,600 1,365,100 - 1,596,700 280 WW140 North 9th Avenue, West Villard Street, and South 9th Avenue Sewer Main Replacement - - 48,000 282,700 - 330,700 281 WWIF53 Cottonwood Road Sewer Capacity - - - 327,000 2,022,000 2,349,000 Total $ 4,437,700 $ 6,619,900 $ 24,607,500 $ 6,866,400 $ 2,022,000 $ 44,553,500 Adopted FY26-30 Capital Improvement Plan Page 268 of 383 287 Wastewater Impact Fee Fund Unscheduled Projects Project Code Project Name Amount Description WWIF48 Hidden Valley Lift Station $7,000,000 Design and construct the Hidden Valley Lift Station and Force Main. This project will conform to the City's 2015 Wastewater Collection Facilities Plan Update. Pumps must be added at the Davis Lane Lift Station to accommodate this project. Development in the northwest corner of the community will drive the need and timing for this project, but the exact timing is not determined yet and is difficult to estimate. It is anticipated this lift station will be needed in roughly a 5-10 year timeframe. WWIF60 Water Reclamation Facility (WRF) Screw Press No. 3 Improvement 2,651,000 Install new screw press number three at the Water Reclamation Facility to increase solids processing capacity at the facility. This capital improvement will require solids handling building expansion. Improvements for this project are defined in the 2023 Water Reclamation Facilities Plan. Solids are a final waste product from the Water Reclamation Facility that are ultimately disposed at the Logan Landfill, but the solids must be processed to EPA and landfill requirements prior to disposal at the landfill. WWIF59 Water Reclamation Facility (WRF) Screw Press Upgrade 1,540,000 This project will replace the existing screw press number 1 with a new, larger capacity screw press of similar capacity as the unit with 2022 solids handling expansion project at the Water Reclamation Facility. This project will increase solids processing capacity at the facility. This capital improvement will require solids handling building expansion. Improvements for this project are defined in the 2023 Water Reclamation Facilities Plan. Solids are a final waste product from the Water Reclamation Facility that are ultimately disposed at the Logan Landfill, but the solids must be processed to EPA and landfill requirements prior to disposal at the landfill. WWIF61 Water Reclamation Facility (WRF) Additional Peps Pump 869,000 This project entails the installation of additional primary effluent pump station (peps) pump to provide necessary pumping capacity to treat 14.6 million-gallons-per-day plant upgrade avg day design flow. This improvement is outlined in the 2023 Water Reclamation Facilities Plan. WWIF62 Water Reclamation Facility (WRF) Additional Headworks Screen 792,000 This project includes installation of an additional headworks screen as loading increases. Use adaptive planning to determine year required per the 2023 Water Reclamation Facilities Plan. A headworks screen is the first treatment step at the facility, which functions to remove large materials from wastewater that is influent to the plant. Total $12,852,000 Adopted FY26-30 Capital Improvement Plan Page 269 of 383 288 Map of Wastewater Impact Fee Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 270 of 383 289 Water Reclamation Facility (WRF) Base Hydraulic Phase 1 (WW129) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS High Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $1,607,600 Total Scheduled Project Cost $1,607,600 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Hydraulic capacity improvements for the existing treatment processes employed at the Water Reclamation Facility (WRF) are necessary to meet the 20-year planning horizon of the facility. The anticipated 20-year flow rate is 14.6 million-gallons-per-day (mgd) average daily design flow identified in the 2022 WRF Facilities Plan. The existing WRF average day design capacity is 8.5 mgd. The 2022 WRF Facilities Plan identifies existing process improvements necessary to increase the base hydraulic capacity to 14.6 mgd and when these improvements are needed. A phased approach is called for, since some process elements have more current available capacity than others. Base hydraulic capacity improvements are intended to maintain the current treated effluent performance levels of the WRF and are not designed to further reduce effluent nutrient (nitrogen and phosphorus) concentrations. Phase 1 base hydraulic capacity improvements identified in the 2022 WRF facilities plan update include the construction of a 4th anaerobic digester, uv disinfection capacity additions, piloting of indense™ process to enhance and optimize existing bioreactor phosphorous removal, and full-scale installation of indense™ process after piloting. This project also includes renovation of existing lined solids piping restricted by struvite. Struvite accumulates in pipes at water reclamation facilities over time and restricts flow of materials in those pipes. The total project cost is expected to be $10,730,000 including $9,122,400 which will be spent prior to the capital planning period 2026-2030. CONSEQUENCES OF DELAYING PROJECT Growth of the City will be limited until WRF capacity is increased. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The total project cost has increased by $1.6 million to account for a higher cost inflation estimate received from our design consultant. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $8,122,400 $1,607,600 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 271 of 383 290 Gooch Hill Lift Station (WWIF63) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue & Developer Contributions $12,589,500 Total Scheduled Project Cost $12,589,500 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT The Gooch Hill Lift Station is defined in the City's Wastewater Collection Facilities Plan to serve the northwestern and western edge of the City. Two potential developments are looking to annex into the City. One property is 160 acres at the northwest corner of Baxter and Cottonwood. The Second development is approximately 430 acres north of Cottonwood and west of Harper Pucket Road. Both properties need the Gooch Hill Lift Station in order to provide sanitary sewer service to the area. Both developers will need to provide up-front capital funding to fund the project in addition to potential funding from the City's impact fee program with potential reimbursement via impact fee credits. The proposed costs provide one of two phases to construct the Gooch Hill Lift Station to reduce up-front costs. The Gooch Hill Lift Station will also open sanitary sewer service to many properties along the western boundary of the City. CONSEQUENCES OF DELAYING PROJECT Growth within the service area of the Gooch Hill Lift Station along the western portion of the City can not occur until the sewer infrastructure to serve the area is constructed. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project is new to the capital plan. This project is under development as a potential public-private partnership. If the partnership does not develop, this project will not advance. In the case this project does not advance, the Cottonwood Road Sewer project will be accelerated with design in FY26 and construction in FY27. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $1,500,000 $1,625,000 $9,464,500 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 272 of 383 291 Fowler Sewer Upgrade (WWIF58) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 3 FUNDING SOURCE(S) AMOUNT Wastewater Impact Fee Revenue Rate Revenue $466,800 $521,700 Total Scheduled Project Cost $988,500 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will construct a 24-inch sanitary sewer main in conjunction with Fowler Road construction project. Sewer main construction will occur from Oak to Durston. This work was initially thought to be 100% capacity expanding as the original pipe was going to be left in place. Given the latest iteration of the design, the existing pipe will be abandoned, so a portion of this project is now in the wastewater fund. Total project cost: $1,134,100 | Design (FY25): $145,600 | Construction and Construction Administration (FY26): $988,500 (60.6% wastewater fund and 39.4% wastewater impact fee fund totals split over 2 years matching the capacity upgrade of the sewer construction work). CONSEQUENCES OF DELAYING PROJECT If not constructed simultaneous with the Fowler Road Street Impact Fee project, this sanitary sewer must be constructed in the next 5 years, which would subsequently damage new pavement associated with the Fowler Road Project and be much more expensive to construct. The sewer main is necessary to accommodate redevelopment growth in the south and central parts of the City. If not constructed, growth will be restricted until the sewer capacity is upgraded. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The described changes to the design of this project result in a funding shift. Replacement of the existing pipe cannot be paid for with Wastewater Impact Fees and will need to be paid from wastewater rate revenues. Additional costs in the biennium will be funded by budget savings if available. If savings are not available a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $145,600 $466,800 $0 $0 $0 $0 Wastewater $0 $521,700 $0 $0 $0 $0 Total $145,600 $988,500 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 273 of 383 292 Water Reclamation Facility (WRF) Base Hydraulic Phase 2 (WW131) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS High Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $16,140,000 Total Scheduled Project Cost $16,140,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Hydraulic capacity improvements for the existing treatment processes employed at the Water Reclamation Facility (WRF) are necessary to meet the 20-year planning horizon. These improvements will be the second and final phase of a project to upgrade the WRF capacity to a 14.6 million-gallons-per-day (mgd) average daily design flow identified in the 2022 WRF Facilities Plan. The existing WRF average day design capacity is 8.5 mgd. The 2022 WRF Facilities Plan identifies existing process improvements necessary to increase the base hydraulic capacity to 14.6 mgd. A phased approach is called for, since some process elements have more current available capacity than others. Base hydraulic capacity improvements are intended to maintain the current treated effluent performance levels of the WRF and are not designed to further reduce effluent nutrient (nitrogen and phoshporus) concentrations. Phase 2 base hydraulic capacity improvements identified in the 2022 WRF Facilities Plan include the construction of two new secondary clarifiers, upgrade of the existing bioreactor number1 by retrofitting to a 5-stage bardenpho process, and the addition of one aeration blower. CONSEQUENCES OF DELAYING PROJECT Growth will be limited until WRF capacity is increased. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Cost inflation estimate by design consultant included in fiscal year 2028. This is additional to the previously budgeted estimate. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $400,000 $1,607,700 $14,132,300 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 274 of 383 293 MSU Interceptor (WW138) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Rate Revenue $2,711,300 $3,057,400 Total Scheduled Project Cost $5,768,700 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT A critical section of existing sewer main begins on Kagy Blvd and Hoffman Drive as a 10-inch diameter asbestos concrete pipe and continues north through Mason, Wilson Ave, College, 4th Avenue, and finally ending on 6th Ave. Once the sewer main reaches Olive Street, the diameter increases to 18-inches (diameter) in size. Portions of the existing main have been identified as high- risk given both the condition and age of the existing pipe. In addition, the City’s hydraulic model has shown that several segments of the sanitary sewer main are at or very near hydraulic capacity during wet weather modeling scenarios. This project includes both the replacement and upsizing. of approximately 10,250-feet of existing sanitary sewer main Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions while decreasing overall risk associated with critical aging infrastructure. The project was recommended to occur within the City’s 5-year short-term planning horizon in conformance with the City’s Wastewater Collection Facility Master Plan. Total project cost from Wastewater Impact Fee Fund and Wastewater Fund: $5,768,700 |Engineering (FY26): $836,800 Construction and Construction Administration (FY27): $4,931,900. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include limitation on development immediately south of Kagy and east of 11th Ave and inability to serve new building projects from MSU. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Updated Name to reflect changes in facility plan and interceptor diagrams. Scope remains the same. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $393,300 $2,318,000 $0 $0 $0 Wastewater $0 $443,500 $2,613,900 $0 $0 $0 Total $0 $836,800 $4,931,900 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 275 of 383 294 Wastewater Development Oversizing (WWIF99) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $770,000 Total Scheduled Project Cost $770,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT The City asks developers to oversize sanitary sewer mains consistent with the City’s Wastewater Collection Facilities Master Plan as developers construct their projects. The developers are responsible for the minimum pipe size required by their development, and the City reimburses developers for oversized pipes that will accommodate future growth through the wastewater impact fee program. This is a way to proactively construct the sanitary sewer system to accommodate growth such that pipes aren’t constantly excavated and replaced with larger mains each time a new development is constructed. Pipe oversizing also serves as a public-private partnership and provides a highly cost efficient means of building sewer mains to accommodate future growth. CONSEQUENCES OF DELAYING PROJECT The consequences of delaying the project include losing a high level of cost efficiency of public/private partnership associated with pipe oversizing to accommodate future development. It is much more efficient to pay for pipe oversizing when the original pipeline is being constructed instead of increasing the pipe size at a later date and with significant disruption to the public. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET All wastewater oversizing projects driven by development have been consolidated into this project for the purpose of flexibility to accommodate development projects timing. From previous capital plans, that includes Turnrow Subdivision Sewer Oversizing (WWIF57), Urban Farm Sewer Oversizing (WWIF66), Northwest Crossing Sewer Oversizing (WWIF54), Gooch Hill Gravity Sewer Main Oversizing (WWIF64), and Baxter 80 Sewer Oversizing (WWIF65). As the City does not control timing of developer-led projects, it is important to have flexibility to match this investment to the timing of the need. A generalized oversizing program allows the necessary flexibility that upon completion of a pipe improvement and final acceptance of the infrastructure by the City, developers may then be timely reimbursed for pipe oversizing. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $60,000 $70,000 $200,000 $500,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 276 of 383 295 N. Frontage Interceptor (WWIF20) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Rate Revenue $5,721,600 $2,095,700 Total Scheduled Project Cost $7,817,300 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project will either replace and upsize, or parallel certain portions of the sanitary sewer along the 11,500 feet length of the existing North Frontage Road Interceptor. The North Frontage Road Interceptor supports large portions of the City’s southeast and eastern sewersheds. The extents of the project is generally located between Springhill Road and Bridger Drive. Portions of the interceptor have been shown to have an increased risk of failure due to the age and condition of the asset while other segments have been identified in the City’s hydraulic model to be near hydraulic capacity during wet weather modeling scenarios. The project consists of two main components: first, the replacement of existing parallel trunk sewer, which includes the replacement and upsizing of the worst condition parallel interceptor main; second, the installation of a new parallel interceptor main along portions of the existing interceptor that currently only have a single segment of main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build- out conditions while decreasing overall risk along the interceptor corridor. Lastly, the existing interceptor main that is not mitigated as part of the project will be inspected for current condition and either replaced or rehabilitated at a later date, thus utilizing the City’s existing assets to their full expected life-cycle extent. The project will conform to the City’s Wastewater Collection Facility Master plan. Engineering is scheduled in FY27 and construction in FY29. CONSEQUENCES OF DELAYING PROJECT Limit growth until the upgrade is completed if the pipe is not upgraded prior to reaching capacity of the line. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Engineering costs have been moved up to FY27 to be completed in conjunction with the design of Shared Used Path: Frontage project (A&C024). FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $0 $830,000 $0 $4,891,600 $0 Wastewater $0 $0 $304,000 $0 $1,791,700 $0 Total $0 $0 $1,134,000 $0 $6,683,300 $0 Adopted FY26-30 Capital Improvement Plan Page 277 of 383 296 4th Avenue, Babcock Street and Grand Avenue Sewer Main Replacement (WW139) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Rate Revenue $270,300 $480,600 Total Scheduled Project Cost $750,900 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT A critical section of existing 8-inch sanitary sewer main located along 4th Avenue, Babcock Street, and Grand Avenue has been identified for replacement and upsizing per the City’s Wastewater Collection Facilities Plan. The existing 8-inch vitrified clay pipe has been identified as high-risk given both the condition and age of the asset. In addition, the City’s hydraulic model has shown several segments of sewer main to be near hydraulic capacity during wet weather modeling scenarios. The project includes both the replacement and upsizing of approximately 1,300-feet of existing sewer main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions while decreasing overall risk associated with critical aging infrastructure. The project was recommended to occur within the City’s 5-year short-term planning horizon per the City’s Wastewater Collection Facility Master Plan Update. CONSEQUENCES OF DELAYING PROJECT Immediate limitation on development served by these pipes and potential sewage backups impacting sewer customers. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $0 $39,200 $231,100 $0 $0 Wastewater $0 $0 $69,700 $410,900 $0 $0 Total $0 $0 $108,900 $642,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 278 of 383 297 Water Reclamation Facility (WRF) Interceptor (WWIF44) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $1,596,700 Total Scheduled Project Cost $1,596,700 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT Currently, the existing 30-inch Wastewater Reclamation Facility (WRF) interceptor supports the entire city and is the primary drainage pathway for all wastewater flow into the WRF. The existing interceptor has been identified in the City’s hydraulic model to be approaching the hydraulic capacity of the pipe, specifically during wet weather modeling scenarios. Approximately 1,200 feet of 42-inch trunk main will be installed along springhill road from the WRF to North Frontage Road. In addition, a common hydraulic control structure is also included at the interface of the WRF and interceptor tie-in location. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions while decreasing overall risk associated with a single asset. The project will conform to the City’s Wastewater Collection Facility Master Plan Update. Engineering is scheduled in FY28 and construction in FY29. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include limiting growth in the entire community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $0 $0 $231,600 $1,365,100 $0 Adopted FY26-30 Capital Improvement Plan Page 279 of 383 298 North 9th Avenue, West Villard Street, and South 9th Avenue Sewer Main Replacement (WW140) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Rate Revenue $330,700 $2,212,900 Total Scheduled Project Cost $2,543,600 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT A critical section of existing sewer main begins on South 9th Street and continues north through Midtown, ultimately ending at Durston Ave. The existing vitrified clay pipe has been identified as high-risk given both the condition and age of the asset. In addition, the City’s hydraulic model has shown that several segments of main to be at or very near hydraulic capacity during wet weather modeling scenarios. The project includes either replacement or upsizing of approximately 3,000 ft of existing sewer main. Overall, the project will provide the necessary improvements needed to increase system capacity to meet future build-out conditions while decreasing overall risk associated with critical aging infrastructure. The project is recommend to occur within the City’s 5-year short-term planning horizon and is in conformance with the City’s Wastewater Collection Facility Master Plan Update. Engineering is scheduled in FY28 and construction in FY29. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying project include limitation on development served by these pipes and potential sewage backups impacting sewer customers. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $0 $0 $48,000 $282,700 $0 Wastewater $0 $0 $0 $321,000 $1,891,900 $0 Total $0 $0 $0 $369,000 $2,174,600 $0 Adopted FY26-30 Capital Improvement Plan Page 280 of 383 299 Cottonwood Road Sewer Capacity (WWIF53) FUND DEPARTMENT PROJECT TYPE Wastewater Impact Fee Wastewater Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue & Rate Revenue $2,349,000 Total Scheduled Project Cost $2,349,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project would provide a missing link of sanitary sewer that will allow development south of Huffine. It is identified in the Wastewater Collection Facility Plan Update. CONSEQUENCES OF DELAYING PROJECT The consequences of delaying the project include limiting growth south of Huffine in the far southwest part of the community and stranding a portion of the Davis-Lane Lift Station asset. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Moved this project back in the CIP from FY25 and FY26 to accommodate the Gooch Hill Lift Station. If the Gooch Hill Lift Station project does not advance, this project will need to be shifted forward to FY26/FY27. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Wastewater Impact Fee $0 $0 $0 $0 $327,000 $2,022,000 Adopted FY26-30 Capital Improvement Plan Page 281 of 383 300 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 282 of 383 301 WATER Adopted FY26-30 Capital Improvement Plan Page 283 of 383 302 Water Fund Scheduled Projects (continued on next page) Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 289 W04 Water Pipe Replacement Program $ 2,001,000 $ 2,446,600 $ 2,924,600 $ 3,650,000 $ 3,800,000 $ 14,822,200 290 W87 Lyman Tank & Transmission Main 1,500,000 16,887,100 - - - 18,387,100 291 W167 Water Mains w/Fowler Corridor 800,000 - - - - 800,000 292 W115 Hyalite Intake Rehab 540,800 - - - - 540,800 293 W151 Water Treatment Plant (WTP) Capital Replacement 505,800 502,400 584,900 608,300 632,700 2,834,100 294 W72 Pressue Reducing Valve (PRV) Phase 1-Mechanical & Structural Upgrades 500,000 500,000 500,000 - - 1,500,000 295 W79 Hyalite Dam & Reservoir Optimization Improvements 500,000 - 4,850,000 - - 5,350,000 296 W134 Municipal Groundwater Water Right & Mitigation Plan Permitting 200,000 - - - - 200,000 297 W111 Meter Service Truck Replacement 75,000 - - - - 75,000 298 W110 Replace 3/4 Ton Truck with 1 Ton Truck 69,000 - - - - 69,000 299 W108 Ground Thawer Replacement 60,000 - - - - 60,000 300 W164 Blower and Reverse Filtration Variable Frequency Drives (VFD) Replacement 35,000 - - - - 35,000 301 W03 Annual Water Pipe Replacement Program 34,300 35,700 37,100 38,600 40,000 185,700 302 W126 WTP Security Upgrade - 500,000 - - - 500,000 303 W144 Hyalite Reservoir Equalization Storage - 250,000 750,000 9,000,000 - 10,000,000 304 W132 Replace #3662 1 Ton - 100,000 - - - 100,000 305 WIF68 Stucky/S 27th Water Improvements - 88,600 614,200 - - 702,800 306 W130 Replace #3606 3/4 Ton - 72,000 - - - 72,000 307 WC09 Sourdough Weather Station - 65,000 - - - 65,000 308 W161 Zeta Potential Meter - 60,000 - - - 60,000 309 W122 Replace Ford Escape - 56,200 - - - 56,200 310 W153 Sourdough Canyon Natural Storage - - 300,000 - 2,000,000 2,300,000 311 W138 Vehicle Storage Shed - - 175,500 - - 175,500 312 W127 Hilltop Tank Painting - - 175,000 1,700,000 - 1,875,000 313 W139 Flow Meter Replacements - - 117,000 - - 117,000 314 W135 Replace Mini Excavator - - 60,400 - - 60,400 315 W140 Chlorine Analyzer Replacement - - 50,000 - - 50,000 316 W137 Benchtop Turbidmeter - - 40,000 - - 40,000 317 W148 Replace 3716 1-Ton Service Truck - - - 110,000 - 110,000 318 W149 Replace 3780 1/2-Ton Utility Truck - - - 84,000 - 84,000 Adopted FY26-30 Capital Improvement Plan Page 284 of 383 303 Water Fund Scheduled Projects Continued Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 319 W157 Hydrant Leak Detectors - - - - 600,000 600,000 320 W131 Replace Compactor Backhoe - - - - 187,000 187,000 321 WWW03 Midsized Excavator - - - - 165,000 165,000 322 WWW05 New Tandem Axle Dump Truck - - - - 148,500 148,500 323 W162 Unit Heater Replacement - - - - 100,000 100,000 324 W158 New 1/2 Ton Utility Truck - - - - 89,000 89,000 325 W159 Replace 1/2 Ton Truck - - - - 89,000 89,000 326 W160 Replace 1/2 Ton Truck - - - - 89,000 89,000 327 W165 All Terrain Vehicle - - - - 30,000 30,000 328 WWW04 New Equipment Trailer - - - - 25,000 25,000 Total $ 6,820,900 $ 21,563,600 $ 11,178,700 $ 15,190,900 $ 7,995,200 $ 62,749,300 Adopted FY26-30 Capital Improvement Plan Page 285 of 383 304 Water Fund Unscheduled Projects Project Code Project Name Amount Description W71 PRV Ph2-Automation & Instrumentation $7,280,000 This project involves upgrades to pressure instrumentation, automated valve actuation, and network connections and SCADA programming to provide for real-time monitoring and remote control of existing pressure reducing valves in the municipal water distribution system. Without this project, system operators are without vital data on system operating conditions. Real-time data capabilities provided by this project will allow operators to anticipate, diagnose, and correct abnormal operating conditions. Upgraded pressure controls offers improved protections from surge conditions which are a likely cause of pipe failure. It will also improve service levels to existing customers. This project is not in the 5-year CIP due to funding constraints. If there were more funding capacity, this project would be in the 5-year plan. W119 Sourdough Transmission Main Ph 3 & WTP Tank Monitoring Vault and Equipment 5,300,000 This project will result in complete redundancy of transmission main infrastructure from the Water Treatment Plant (WTP) to the Sourdough tank by installing ~2000 feet of 42" main from WTP to Nash Road. The project will eliminate a high spot on existing 30" CCP main near corner of Nash and Sourdough Road which currently creates a hydraulic flow limitation of WTP treatment capacity. Construction of a vault at the outlet of the WTP tank for new valving will be included in the project, as well as the installation of flow and chlorine residual monitoring equipment. This project is not in the 5-year CIP due to funding constraints. If there were more funding capacity, this project would be in the 5-year plan. W166 Sourdough Tank - Ph 2 Rehab 5,200,000 Sourdough Tank is a 4-million-gallon, concrete-finish water storage tank constructed in the 1950's. Proactive rehabilitation of the tank is needed to prolong its useful life and has been determined to be more cost-effective than reconstructing the tank through engineering and economic analysis. This project consists of completing interior concrete restoration and rehabilitation as identified by the condition assessment planned with the Sourdough Tank Rehabilitation Phase 1 project as well as installing new tank mixers, a level sensor, a new access hatch, and replacing the existing vent. This project is not in the 5-year CIP due to funding constraints. If there were more funding capacity, this project would be in the 5-year plan. W128 Belt Filter Press 4,000,000 As WTP production increases, sludge production will increase. A belt filter press with associated building and piping will be necessary to accommodate this increase. In case of a forest fire in the watersheds, even more sludge will be produced which will out-pace drying bed capacity. This project will be added to the 5-year CIP in the year the need is anticipated It is expected to be needed in the 5-10 year timeframe. That analysis is underway. W125 Sourdough Bypass Expansion 1,250,000 The sourdough bypass flow control building is a hydraulic limitation in delivering water to the City given the existing transmission main configurations. This project will expand the hydraulic capacity of the bypass piping and flow control valve. This project may or may not be needed given the analysis in progress and alternative selected for the WIF59 West Transmission Main and New South Pressure Zone project. Alternatives for this work are currently being evaluated by engineering consultant analysis. Upon completion of that analysis, necessary improvements will be programmed in future CIPs. (continued on next page) Adopted FY26-30 Capital Improvement Plan Page 286 of 383 305 Water Fund Unscheduled Projects Continued Project Code Project Name Amount Description W157 Hydrant Leak Detectors $1,800,000 The City is looking to pilot a leak detection system that mounts to fire hydrants and will detect for leaks daily. This capital item will be the first major installation in a move to a complete install to cover the entire water system. This is a strong move toward improving our water conservation effort by being able to find and fix leaks in water mains. The first of approximately four installations is scheduled in FY30 with the remaining planned for installation FY31, FY32, and FY33 W123 Chemical Storage Tanks 1,000,000 This project is planned in anticipation of the chlorine, caustic, fluoride, ach, and citric acid chemical bulk tanks nearing end of useful life. As tanks age, the internal lining begins to break down and leak. One tank is already starting to leak and has been repaired once. In total, there are 14 storage tanks of various sizes that will need replacement. Investigation and timeline for this work are currently being evaluated by engineering consultant analysis. Upon completion of that analysis, necessary improvements will be programmed in future CIPs. W89 Membrane Replacement 750,000 Existing water filtration membranes at the Sourdough Water Treatment Plant are warrantied for 10 years and have been in use since fall 2013. This project will involve replacing 372 modules when the full useful life of the membranes is observed. The City is currently operating beyond the warranty of the membranes and getting extra life from this equipment and will work to extend the useful life as long as possible. Upon membrane failures, the membranes will be replaced. Staff have done an excellent job maintaining the existing membranes to obtain as much life from these facility elements as possible. WIF66 Davis Lane Water Improvement 609,000 Design and construction of a new 16" water main in Davis Lane from Baxter Lane to Cattail Street per recommendations in the 2015 Water Facility Plan (FP_1484). This project will coincide with the need for the work. There is significant development in this area currently, and this project be executed simultaneous with development improvements that trigger the need. That is likely to occur in the 5-10 year timeframe. WWW1 Wheeled Excavator 170,500 This excavator will allow City crews to dig up to 20 feet depth. Current excavator capabilities are limited to 12-feet depths. This equipment is not scheduled yet because there is currently nowhere to house the excavator despite the current need for this equipment. The city is hiring contractors with sufficient excavation equipment to dig deeper lines in the City when the need arises, such as for water main breaks. Contracting out this emergency work comes at a premium price to the water utility. W114 WTP Tank Mixers 124,800 This project is intended to prevent water stagnation in the City’s WTP tank and improve water quality. The project will result in the decrease of disinfection byproducts (DBP) levels and improve chlorine residual exiting the tank to the water distribution system. This project is not in the 5-year CIP due to funding constraints. If there were more funding capacity, this project would be in the 5-year plan. Total $27,484,300 Adopted FY26-30 Capital Improvement Plan Page 287 of 383 306 Map of Water Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 288 of 383 307 Water Pipe Replacement Program (W04) FUND DEPARTMENT PROJECT TYPE Water Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $14,822,200 Total Scheduled Project Cost $14,822,200 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT The water pipe replacement program sets aside funds to assess and replace failing water pipes. Priority for replacement or rehabilitation projects will generally be associated with asset management principles and coordination with the City's annual street reconstruction program. This item will also be used to perform condition assessments to better inform the City's capital program and future project prioritization. These funds are primarily for construction work. CONSEQUENCES OF DELAYING PROJECT Delaying the project will result in deferred maintenance along with increased pipe failure rates, risk of property damage, and reduced level-of-service. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $1,586,000 $2,001,000 $2,446,600 $2,924,600 $3,650,000 $3,800,000 Adopted FY26-30 Capital Improvement Plan Page 289 of 383 308 Lyman Tank & Transmission Main (W87) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue & Debt $18,387,100 Total Scheduled Project Cost $18,387,100 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project includes condition assessment and preliminary design of a new five-million-gallon storage tank at the City’s Lyman water source. The Lyman water supply is a critical element of the City's overall water supply portfolio accounting for roughly 20% of annual supply volume to the city currently. The source provides supply redundancy & resiliency as it is geographically removed from the Sourdough/Hyalite source and provides an independent connection to the distribution system. The effective available water supply will increase since the new storage system will not leak and will expand the number of customers able to be supplied by the Lyman water supply. Likelihood of failure of the Lyman supply system will be dramatically reduced by replaced storage. The project scope will include condition assessment and preliminary design of the existing Lyman transmission main, new supply main tie into new storage tank, new transmission main tie in from new storage tank to existing transmission main, and new chlorination/fluoridation feed facility. The project includes condition assessment of the existing transmission pipe to determine extents of necessary pipe replacement while keeping portions of the pipe in place that have remaining useful life. CONSEQUENCES OF DELAYING PROJECT Delays will result in continued leakage of the Lyman water storage tank and regular water loss that could be used for water supply to the city. Also, given the age the water trasmission pipe from the Lyman water storage tank into the community, the water main may need significant repairs to avoid leakage and emergency repairs. Design work will include a significant condition assessment effort with some destructive testing to determine scope of pipeline replacement. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Reduced anticipated FY25 spending to $500k (from $2.9M)and moved $1.5 million to FY26 for condition assessment and preliminary design investigation of project alternatives for transmission and storage. . The construction element of the work is moved to unscheduled due to funding constraints. If there were more funding capacity, the construction phase of the project would remain in the 5-year plan. The planning, condition assessment, and pre-design elements of the project will remain in the CIP to determine exact project definition and costs. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Water $500,000 $1,500,000 $16,887,100 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 290 of 383 309 Water Mains w/ Fowler Corridor (W167) FUND DEPARTMENT PROJECT TYPE Water Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $800,000 Total Scheduled Project Cost $800,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project is intended to coordinate utilities infrastructure with the Fowler Avenue project identified in the Street Impact Fee Fund as the SIF114. An 8-inch water main will be constructed under the new Fowler Avenue construction with a combined project. This water main is identified to be needed by the City’s engineering standards, which require looping of water mains that provides operational redundancy and fire protection service and will be constructed with the street project to benefit from cost savings and minimize future street disruption to the public. CONSEQUENCES OF DELAYING PROJECT If the water main is not constructed in conjunction with the road project, the main will need to be constructed at a later date, which would impact new street infrastructure and be disruptive to traffic and reduce the life of the new asphalt surface. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. This project was presented in previous budgetary documents under project code WIF58. The project code has been updated to reflect the Water Fund as the singular funding source. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $800,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 291 of 383 310 Hyalite Intake Rehab (W115) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $540,800 Total Scheduled Project Cost $540,800 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT The Hyalite intake diverts the City’s water rights from Hyalite Creek and Hyalite Reservoir for conveyance to the water treatment plant. The concrete dam/overflow structure show signs of age and degradation. The earthen embankment west of the concrete diversion dam is exhibiting signs of seepage at the embankment toe. This project includes in-depth inspection of embankment and concrete dam, and design and construction of necessary repairs to both, as well as dredging of intake pond to remove accumulated sediment. The scope of the project is subject to U.S. Forest Service (USFS) requirements under a pending special use permit authorization for the facility, since it is located on Custer Gallatin National Forest Service land. The special use permit has not been finalized as of this FY26-30 CIP cycle. Total project cost including the FY25 budget is $644,800. CONSEQUENCES OF DELAYING PROJECT Seepage is observed at the embankment. This seepage may lead to embankment failure and downstream property damage, if not repaired. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $104,000 $540,800 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 292 of 383 311 Water Treatment Plant (WTP) Capital Replacement (W151) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $2,834,100 Total Scheduled Project Cost $2,834,100 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project provides funding to address capital infrastructure and equipment repair or replacement on an as needed basis at the Water Treatment Plant (WTP). Unforeseen issues may materialize which create undue risk to WTP operators, or the public, if apparent or imminent failure of capital infrastructure is not addressed in a diligent manner. City staff are working on a water treatment plan facility plan to further define capital replacement needs. This item will be updated in future capital plans to reflect the more detailed analysis. CONSEQUENCES OF DELAYING PROJECT Delaying funding is anticipated to result in deferred maintenance and cost increases. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Because this project is a placeholder for future unknown capital replacements, this CIP includes a reduction in FY26 of $35K for the addition of a new project W164 in and by an additional $60K for W161 in FY27. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $505,800 $502,400 $584,900 $608,300 $632,700 Adopted FY26-30 Capital Improvement Plan Page 293 of 383 312 Pressure Reducing Valve (PRV) Phase 1-Mechanical & Structural Upgrades (W72) FUND DEPARTMENT PROJECT TYPE Water Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue & N/A $1,500,000 Total Scheduled Project Cost $1,500,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project will assess the condition of existing pressure reducing valve (PRV) vaults and inventory mechanical equipment. Pressure reducing valves (PRVs) are needed to reduce water system pressures and subsequently protect water pipes from breaking due to excessive pressures. Lower system pressures also reduce water loss rates from leaking pipes, which supports the City’s water conservation program. The assessment will identify upgrades necessary for essential safety and to support long-term maintenance and operations of the many PRVs throughout the City. Subsequently, essential mechanical and structural upgrades will be completed up to the annual funding limits. CONSEQUENCES OF DELAYING PROJECT Delaying the project is likely to result in deferred maintenance and increased pipe failures due to exceedance of useful life of PRVs. This would increase City- wide pipe failure rates and result in increased water loss from the City’s potable water system. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Staff updated the project description and added to FY2025 Biennium Budget after FY25-29 CIP Adoption after this work was delayed from past capital plans. This work was also spread out over multiple fiscal years to reduce impact to the Water Fund. Construction will be sequenced at $500,000 each year for FY26, FY27, and FY28 to limit fund impacts. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $500,000 $500,000 $500,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 294 of 383 313 Hyalite Dam & Reservoir Optimization Improvements (W79) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue & Grant(s) $5,350,000 Total Scheduled Project Cost $5,350,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Hyalite Reservoir and water rights are owned by the MT Department of Natural Resources and Conservation (DNRC), and the project is operated and maintained by the Middle Creek Water Users Association (MCWUA), of which the City is the majority shareholder member. Optimization of reservoir operations and improvements to dam infrastructure will require close coordination and agreement by the DNRC, MCWUA, and US Forest Service. This will require a heavy front-loaded planning and pre-design phase to gain stakeholder approval. The objectives of this optimization project are to armor the reservoir control tower to enable some year-over-year storage capacity or multiple reservoir fills during a single water year, and to install control upgrades to improve and allow for automated remote wintertime operation of reservoir releases. Current vulnerability of Bozeman to drought is very high due to the limited water storage in the water supply system. Hyalite Reservoir is capable of providing year-over-year storage and multiple fills but is not operated in that manner, due to concerns of ice damage to the control tower, which this project intends to correct. CONSEQUENCES OF DELAYING PROJECT Delays will result in reduced ability to respond to drought conditions. Additionally, the automation improvements will reduce ongoing operational costs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Design of this project has been pushed out one year for the City, DNRC, and MCWUA to come to agreement on project scope. Planning and design are expected to cost $500,000 and construction cost has increased to $4,850,000 and has also been pushed out to allow time for staff to apply for Bureau or Reclamation Grant Funding. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Water $0 $500,000 $0 $4,850,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 295 of 383 314 Municipal Groundwater Water Right & Mitigation Plan Permitting (W134) FUND DEPARTMENT PROJECT TYPE Water Water Plant Other OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue & Impact Fee Revenue $200,000 Total Scheduled Project Cost $200,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Municipal groundwater water right permitting in a closed basin is challenging. The process requires complicated hydrogeologic modeling of groundwater pumping, to identify hydraulically connected surface waters, and mitigation plan development to ensure no adverse effects to existing water rights. This project provides funding to work through the water right permitting process for obtaining legal water rights approval from MT DNRC for wells drilled under the municipal test well and mitigation system exploration program (WIF33). This project may fund multiple water right permit applications, including for the existing municipal test well at the Bozeman Sports Park, as well as other future test well sites. The filing of a water right application does not necessarily indicate that the City will pursue the process to the very end. Multiple decision points occur along the permitting process continuum where the City may determine it is not worth continued pursuit of the water right. CONSEQUENCES OF DELAYING PROJECT Delay of the project could result in the City not having a municipal groundwater supply available to augment its water rights, and water supply portfolio to stay ahead of water needed to support continued growth and development CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $200,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 296 of 383 315 Meter Service Truck Replacement (W111) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $75,000 Total Scheduled Project Cost $75,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project will replace an existing ¾ ton truck purchased in 2009. This is a necessary service vehicle for our meter operations. CONSEQUENCES OF DELAYING PROJECT If we delay replacement, this truck is more likely to have maintenance issues and may not have the necessary state of readiness for efficient use of resources. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $75,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 297 of 383 316 Replace 3/4 Ton Truck with 1 Ton Truck (W110) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $69,000 Total Scheduled Project Cost $69,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This truck is primarily used for routine maintenance activities. It will be used in the winter as a plow truck to plow the City utility lots and lift stations. This project will replace an existing ¾ ton truck that was purchased in 2006 with a one-ton truck. CONSEQUENCES OF DELAYING PROJECT If we delay this replacement, the truck is more likely to have maintenance issues and be unreliable. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $69,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 298 of 383 317 Ground Thawer Replacement (W108) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $60,000 Total Scheduled Project Cost $60,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT A ground thawer is necessary to thaw the ground in the winter months to do excavation work. Currently, we have rehabbed and rebuilt many of the components on our current unit. The existing ground thawer was purchased over 20 years ago. CONSEQUENCES OF DELAYING PROJECT If we delay this replacement, the equipment is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $60,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 299 of 383 318 Blower and Reverse Filtration Variable Frequency Drives (VFD) Replacement (W164) FUND DEPARTMENT PROJECT TYPE Water Water Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS None N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $35,000 Total Scheduled Project Cost $35,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project involves replacing variable frequency drives (VFDs) with ethernet capable drives, to enhance the reliability. The variable frequency drives for the water filtration membrane blowers and reverse filtration pumps are obsolete and susceptible to being destroyed by another lightning strike at the water treatment plant, similar to other equipment recently lost to a lightning strike at the plant. CONSEQUENCES OF DELAYING PROJECT If the project is delayed, it is likely that the City will be unable to produce water if VFDs are destroyed by another lightning strike. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Staff added this project to replace vital membrane equipment that is now obsolete. This project will provide more robust and reliable equipment. This project is a new project, which was triggered by a recent lightning strike that damaged equipment at the plant and uncovered this vulnerability. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $35,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 300 of 383 319 Annual Water Pipe Replacement Program (W03) FUND DEPARTMENT PROJECT TYPE Water Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $185,700 Total Scheduled Project Cost $185,700 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This item is primarily surveying consulting services. In-house staff will complete the design work for these projects. This item provides funding for surveying work to be completed every year in anticipation of the annual pipe replacement/rehabilitation projects. Other elements of this item may include geotechnical consultant services or other design support services. CONSEQUENCES OF DELAYING PROJECT Delaying this project will result in deferred maintenance with increased pipe failure rates, risk of property damage, and reduced level-of-service. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Staff added the fiscal year 30 value for this work. All other elements of this CIP item remain unchanged. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $33,000 $34,300 $35,700 $37,100 $38,600 $40,000 Adopted FY26-30 Capital Improvement Plan Page 301 of 383 320 Water Treatment Plant (WTP) Security Upgrade (W126) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $500,000 Total Scheduled Project Cost $500,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project involves the installation of new motion detection lights at all tanks, improved fencing and cameras, programmable lolgic controller cabinet alarms, hardened tank hatches with alarms, and improved door alarms on Lyman Water Treatment, Sourdough Bypass, and Sourdough Water Treatment Plant facilities. CONSEQUENCES OF DELAYING PROJECT Critical water facilities are more susceptible to security breaches resulting in violations of drinking water standards, a possible consequence of delaying this project CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET There are no changes from the prior CIP. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $500,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 302 of 383 321 Hyalite Reservoir Equalization Storage (W144) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue & Grant(s) $10,000,000 Total Scheduled Project Cost $10,000,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Equalization storage is necessary to optimize the use and conservation of the City's Hyalite Reservoir water supply. Currently, WTP operators must call for releases of reservoir water 24 hours in advance of when the water is needed to meet City water demands. This operating paradigm requires the water treatment plant (WTP) operators to call for more stored water supply to be released from the reservoir than is predicted for demand. City water that is released from Hyalite Reservoir and not treated and placed into the distribution system is directed back to Bozeman Creek as overflow from the water treatment plant. Daily overflow volumes vary but can exceed one million gallons-per-day. These overflows accumulate over the course of an irrigation season to hundreds of acre feet per year, approaching 10% of the City's Hyalite Reservoir volume being lost as overflow. The equalization reservoir will eliminate WTP overflow of Hyalite Reservoir water by providing an intermediate storage facility for City water released from Hyalite Reservoir that the WTP can then divert directly from in order to supply the City's daily water demand. The anticipated storage site is existing City-owned lands near the mouth of Leverich Gulch. There is the potential to also utilize this land as an aquifer recharge mitigation site for purposes of municipal groundwater water right permitting. The predesign effort may include evaluation of options to co-locate equalization storage and aquifer recharge infrastructure. CONSEQUENCES OF DELAYING PROJECT Delays will result in significant annual water loss each year and associated cost to the Middle Creek Water User's Association contract for that water. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Funding for design and construction phases were consolidated into one project code (previously project W143 included the design work). Other changes include reducing overall costs to $10 million in total, a reduction of approximately $2 milion. Preliminary analysis of plant overflows included in the WTP facility plan project and potential range of equalization volumes that may be suitable resulted in a lower anticipated cost. Predesign work of $250k was added to FY27 another $750k added to FY28 for design. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $250,000 $750,000 $9,000,000 $0 Adopted FY26-30 Capital Improvement Plan Page 303 of 383 322 Replace #3662 1 Ton (W132) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $100,000 Total Scheduled Project Cost $100,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT One-ton service trucks are first-line trucks which respond to emergencies and are equipped with tools to handle most of our work and are assigned to foreman and lead workers. They are one of the primary assets on our excavations. This project will replace an existing one-ton truck that was purchased in 2013. CONSEQUENCES OF DELAYING PROJECT If the replacement is delayed, this truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $100,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 304 of 383 323 Stucky/S 27th Water Improvements (WIF68) FUND DEPARTMENT PROJECT TYPE Water Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue Impact Fee Revenue $702,800 $2,108,200 Total Scheduled Project Cost $2,811,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project includes design and construction of a new 16" water main in Stucky Road from S 19th to Fowler Ave per recommendations in the Water Facility Plan (FP_1386, FP_1372, FP_1371) and simultaneous with Stucky Road street impact fee project. CONSEQUENCES OF DELAYING PROJECT This work must be matched with timing of the Stucky Road Project and cannot be delayed unless the Stucky Road project is delayed. The water main infrastructure must be constructed in conjunction with the road project, otherwise the road will be torn up again in the near future. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $88,600 $614,200 $0 $0 Water Impact Fee $0 $0 $265,700 $1,842,500 $0 $0 Total $0 $0 $354,300 $2,456,700 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 305 of 383 324 Replace #3606 3/4 Ton (W130) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $72,000 Total Scheduled Project Cost $72,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This is a necessary service vehicle for our meter operations. This project will replace an existing ¾ ton truck purchased in 2011 with a one-ton truck. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, this truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The replacement of the 3/4 ton truck with a one-ton truck is based on the recommendation of Vehicle Maintenance and resulted in a $4,000 increase in project cost. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $72,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 306 of 383 325 Sourdough Weather Station (WC09) FUND DEPARTMENT PROJECT TYPE Water Water Conservation Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 2 FUNDING SOURCE(S) AMOUNT Rate Revenue $65,000 Total Scheduled Project Cost $65,000 STRATEGIC PLAN, IF APPLICABLE 6.3 Climate Action DESCRIPTION OF PROJECT The Sourdough weather station will provide the City with important data pertaining to the Sourdough municipal watershed, which accounts for 40% of the City's annual water supply, to aid in long term water resource management and planning. Data will include snow water equivalent, soil moisture, temperature, humidity, wind speed, and solar radiation among other information. The data will support more informed and timely drought response and provide information needed to perform hydrologic modelling to better understand fluctuations in the timing of snowmelt and other hydrologic events that impact the City's water supply availability. The installation and ongoing maintenance of the station will be supported by MSU, and the data resulting from the project will support MSU research. CONSEQUENCES OF DELAYING PROJECT If this project is delayed, the City will not have weather instrumentation in the Sourdough municipal watershed to help inform water resource management. Without this instrumentation, the City will make less informed decisions about long term water resource management and planning, drought response, and will be unable to use predictive hydrologic modelling to better understand the hydrologic response in the Sourdough watershed to climate change and dry years. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a new project. MSU approached the City since the prior CIP and offered to operate and maintain the proposed weather station if the City would be willing to fund the cost of the weather station. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $65,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 307 of 383 326 Zeta Potential Meter (W161) FUND DEPARTMENT PROJECT TYPE Water Water Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $60,000 Total Scheduled Project Cost $60,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This equipment will assist in further optimization of coagulant dosing for pretreatment, gravity thickener, and dissolved air floatation units. It will potentially cut down on chemical usage. It will aid in producing water that has less potential contaminants. CONSEQUENCES OF DELAYING PROJECT Consequences of delaying the project include not fully optimizing the treatment processes and incurring extra chemical costs, more water filtration membrane cleanings, and potential violations of the City’s DEQ discharge permit. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a new project, and line item W151 was reduced by the amount of this project to remain budget neutral between the two line items. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $60,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 308 of 383 327 Replace Ford Escape (W122) FUND DEPARTMENT PROJECT TYPE Water Water Plant Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $56,200 Total Scheduled Project Cost $56,200 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT An existing Ford Escape is used daily for water sampling throughout the City. The vehicle is currently driven 35-50 miles per day. This project is for the replacement of the Ford Escape. CONSEQUENCES OF DELAYING PROJECT Delaying the replacement of the vehicle will likely result in increased maintenance costs of vehicle. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $56,200 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 309 of 383 328 Sourdough Canyon Natural Storage (W153) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue & Impact Fee Revenue $2,300,000 Total Scheduled Project Cost $2,300,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project includes analysis of alternatives for planning, design and construction of the Sourdough natural storage enhancement project. The project objectives are to increase resiliency of Sourdough watershed to drought impacts, enhance reliability of existing municipal water rights, and perhaps augment municipal legal water rights volume. This project could have potential FEMA flood hazard mitigation and/or other federal and state grants that enhance municipal water supply volume and resiliency. Developing water rights may be challenging. If storage facilities are sited on federal land, then federal authorization must be given and must conform with the Custer Gallatin National Forest Plan. CONSEQUENCES OF DELAYING PROJECT The Sourdough water supply source would be more susceptible to negative reliable yield impacts related to drought and climate change. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The construction phase has been moved from unscheduled to FY30. The planning phase is now expected to cost $300,000 vs the $292,500 which was included in the prior adopted CIP. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $300,000 $0 $2,000,000 Adopted FY26-30 Capital Improvement Plan Page 310 of 383 329 Vehicle Storage Shed (W138) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $175,500 Total Scheduled Project Cost $175,500 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project is for the installation of a storage shed to provide covered vehicle storage for a tractor and tanker. The current sheds are 20 years old and need to be replaced soon. CONSEQUENCES OF DELAYING PROJECT Delaying this project will result in vital vehicles stored out in elements resulting in higher vehicle maintenance costs and additional staff time to ready the vehicles when needed. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $175,500 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 311 of 383 330 Hilltop Tank Painting (W127) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Rate Revenue $1,875,000 Total Scheduled Project Cost $1,875,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT Hilltop tank was last rehabbed and painted in 2007. Weather and external attachments have caused the paint coating to start to deteriorate in spots. Blasting the interior and exterior of the tank to bare steel and applying a new coating systems will prolong the life and integrity of the tank. Exterior blasting will require containment. This project also includes replacement of the cable chase on the tank. Blasting will require either temporary removal of the communications equipment on the tank or working around it, which increases cost. Internal roof trusses will also likely require repairs. CONSEQUENCES OF DELAYING PROJECT Delaying this project is likely to result in deferred maintenance cost increases and permenant structural degradation of the tank. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The cost for this project has increased by approximately $1M in total based on a recommendation from KLM Engineering using similar projects. The project has been moved out to begin in FY28 instead of FY27 to manage workload capacity. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $175,000 $1,700,000 $0 Adopted FY26-30 Capital Improvement Plan Page 312 of 383 331 Flow Meter Replacements (W139) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $117,000 Total Scheduled Project Cost $117,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project will replace the aging Lyman influent and effluent flow meters and Hyalite and Sourdough Bypass flow meters. The new model flow meters will be more accurate and easier to recalibrate, ensuring all water is being accounted for. CONSEQUENCES OF DELAYING PROJECT Delaying the project will result in loss of measurement capability and accuracy. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $117,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 313 of 383 332 Replace Mini Excavator (W135) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $120,800 Total Scheduled Project Cost $120,800 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project is for the purchase of a mini excavator. Previously, the Water Department jointly purchased a mini excavator with the Streets Department, which will be 15 years old at the time of replacement. This equipment is primarily used to dig and repair water and sewer components. Mini excavators are also suitable to fit in tighter spaces than the backhoes in our fleet. CONSEQUENCES OF DELAYING PROJECT If replacement is delayed, this equipment is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $60,400 $0 $0 Wastewater $0 $0 $0 $60,400 $0 $0 Total $0 $0 $0 $120,800 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 314 of 383 333 Chlorine Analyzer Replacement (W140) FUND DEPARTMENT PROJECT TYPE Water Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $50,000 Total Scheduled Project Cost $50,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project will replace soon-to-be obsolete chlorine analyzers at Sourdough and Lyman water treatment plants. New chlorine analyzers will be more accurate, user friendly, and ecofriendly. CONSEQUENCES OF DELAYING PROJECT Without timely replacement of the chlorine analyzers, is it possible to receive drinking water violations due to breakdowns, loss of chlorine measurement accuracy and ability, requiring more labor-intensive chlorine measurements. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $50,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 315 of 383 334 Benchtop Turbidmeter (W137) FUND DEPARTMENT PROJECT TYPE Water Water Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $40,000 Total Scheduled Project Cost $40,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project includes the replacement of current benchtop and surface scatter turbidimeters which will be obsolete in the next couple of years. CONSEQUENCES OF DELAYING PROJECT Delaying the project will result in obsolete equipment breakdowns, with no ability to get parts or repairs, and possible permit violations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $40,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 316 of 383 335 Replace 3716 1-Ton Service Truck (W148) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $110,000 Total Scheduled Project Cost $110,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT One-ton service trucks are front-line trucks that respond to emergencies and are the primary all-purpose vehicle for excavating and repairing water and sewer infrastructure. This project would replace an exsisting, aging vehicle. CONSEQUENCES OF DELAYING PROJECT Without replacement, the existing truck is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $110,000 $0 Adopted FY26-30 Capital Improvement Plan Page 317 of 383 336 Replace 3780 1/2-Ton Utility Truck (W149) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $84,000 Total Scheduled Project Cost $84,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Half (1/2) ton trucks are primarily used for smaller work such as weedeating, painting and shoveling hydrants, flowing fire hydrants to clean mains and leak detection. This project would replace an exsisting, aging vehicle. CONSEQUENCES OF DELAYING PROJECT Without replacement, the exisitng truck is more likely to have increased maintenance costs and potential downtime. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $84,000 $0 Adopted FY26-30 Capital Improvement Plan Page 318 of 383 337 Hydrant Leak Detectors (W157) FUND DEPARTMENT PROJECT TYPE Water Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Moderate Class 5 FUNDING SOURCE(S) AMOUNT Rate Revenue $600,000 Total Scheduled Project Cost $600,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT The City is looking to pilot a leak detection system that mounts to fire hydrants and will detect for leaks daily. This capital item will be the first major installation in a move to a complete install to cover the entire water system. This is a strong move toward improving our water conservation effort by being able to find and fix leaks in water mains. This will be the first of approximately four installations with more to be installed in future CIP years FY31, FY32, and FY33. Project budget for the additional installations totals $1.8 million and is currently unscheduled. CONSEQUENCES OF DELAYING PROJECT The water industry is innovating its ability to proactively detect leaks with daily leak detection on water distribution system pipes. This is accomplished by installing automated water distribution leak detectors, with sensors placed throughout the City. City crews will be able to repair water main leaks much faster than current operations allow, resulting in substantial water savings and reduced property damage. The City currently leak detects the system about once per year and does so manually. The longer a leak goes undetected, the more water is lost. The earlier this project can be funded, the sooner we can implement more effective leak detection, resulting in improved water conservation, reduced property damage, and reduced disruption to city services. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $600,000 Adopted FY26-30 Capital Improvement Plan Page 319 of 383 338 Replace Compactor Backhoe (W131) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $187,000 Total Scheduled Project Cost $187,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Backhoes are primarily used to excavate and repair water and sewer components, as well as perform snow removal in City lots and around fire hydrants. This project will replace an existing backhoe purchased in 2012. CONSEQUENCES OF DELAYING PROJECT If we delay this replacement, the equipment is more likely to have maintenance issues and may not have the necessary state of readiness. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This purchase was moved from FY27 to FY30 to limit increases to water rates. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $187,000 Adopted FY26-30 Capital Improvement Plan Page 320 of 383 339 Midsized Excavator (WWW03) FUND DEPARTMENT PROJECT TYPE Water Water Operations Equipment OPERATING IMPACT COST ESTIMATE CLASS Minimal N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $330,000 Total Scheduled Project Cost $330,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT The City’s excavation fleet currently includes six backhoes and a mini-excavator. The City needs an excavator that will allow excavation to 20 feet depth due to the increasing lineal feet of water and sewer pipe infrastructure that is that deep in the ground. This excavator will also provide more versatility in other areas of excavation. Currently, the City relies on hiring contractors to excavate pipes that are deeper than 12-feet and pays a premium for these services. CONSEQUENCES OF DELAYING PROJECT If the excavator is not purchased, the City will continue to contract the work out or rent the equipment. Emergency situations requiring rental equipment or contracting are expensive. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $165,000 Wastewater $0 $0 $0 $0 $0 $165,000 Total $0 $0 $0 $0 $0 $330,000 Adopted FY26-30 Capital Improvement Plan Page 321 of 383 340 New Tandem Axle Dump Truck (WWW05) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $297,000 Total Scheduled Project Cost $297,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This dump truck will be primarily used to haul materials and trailers across town to excavation sites, to accommodate a growing City. Dump trucks are frontline pieces of equipment that are necessary to excavate and repair water and sewer infrastructure. Currently the Water and Sewer division has 4 dump trucks which can facilitate approximately two excavations in a day. CONSEQUENCES OF DELAYING PROJECT Without this new equipment, we will need to contract this work out. The City is already short on the necessary equipment to meet demands. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $148,500 Wastewater $0 $0 $0 $0 $0 $148,500 Total $0 $0 $0 $0 $0 $297,000 Adopted FY26-30 Capital Improvement Plan Page 322 of 383 341 Unit Heater Replacement (W162) FUND DEPARTMENT PROJECT TYPE Water Water Plant Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $100,000 Total Scheduled Project Cost $100,000 STRATEGIC PLAN, IF APPLICABLE 2.2 Infrastructure Investments DESCRIPTION OF PROJECT This project is for the replacement of the unit heaters. The existing natural gas supplied unit heaters in the production areas of the plant necessitate replacement of inducers every year. The exhaust vents rust with the current heater configuration. The heaters will be 16 years old by FY30, which is beyond the typical service life of this equipment. CONSEQUENCES OF DELAYING PROJECT Delaying the project will result in eventual failure of the heaters and inability to rehabilitate the existing heaters. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $100,000 Adopted FY26-30 Capital Improvement Plan Page 323 of 383 342 New 1/2 Ton Utility Truck (W158) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $89,000 Total Scheduled Project Cost $89,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This new truck is to accommodate a growing city and staff. 1/2 ton trucks are primarily used for smaller scale work such as weedeating, painting, shoveling hydrants, flowing fire hydrants to clean mains, and leak detection. CONSEQUENCES OF DELAYING PROJECT Delaying this project will result in inability to maintain the current level of service for maintenance work due to increased demands from growth. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $89,000 Adopted FY26-30 Capital Improvement Plan Page 324 of 383 343 Replace 1/2 Ton Truck (W159) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $89,000 Total Scheduled Project Cost $89,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Half (1/2) ton trucks are primarily used for smaller work such as weedeating, painting, shoveling hydrants, flowing fire hydrants to clean mains, and leak detection. This project is to replace an existing ½ ton truck which will be 15 years old in FY30. Half (1/2) ton trucks are typically replaced every 15 years due to the value of the vehicle versus the repair costs, improving the safety and technology of the vehicle and the fuel mileage/sustainability of a gas versus electric vehicle. CONSEQUENCES OF DELAYING PROJECT Without replacement, the exisiting truck is more likely to have maintenance issues resulting in higher costs and down time. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $89,000 Adopted FY26-30 Capital Improvement Plan Page 325 of 383 344 Replace 1/2 Ton Truck (W160) FUND DEPARTMENT PROJECT TYPE Water Water Operations Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $89,000 Total Scheduled Project Cost $89,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT Half (1/2) ton trucks are primarily used for smaller work such as weedeating, painting and shoveling hydrants, flowing fire hydrants to clean mains, and leak detection. This project is to replace an existing ½ ton truck which will be 15 years old in FY30. Half (1/2) ton trucks are typically replaced every 15 years due to the value of the vehicle versus the repair costs, improving the safety and technology of the vehicle and the fuel mileage/sustainability of a gas versus electric vehicle. CONSEQUENCES OF DELAYING PROJECT Without replacement, the exisiting truck is more likely to have maintenance issues resulting in higher costs and down time. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $89,000 Adopted FY26-30 Capital Improvement Plan Page 326 of 383 345 All Terrain Vehicle (W165) FUND DEPARTMENT PROJECT TYPE Water Water Plant Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $30,000 Total Scheduled Project Cost $30,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This vehicle will allow City staff to access generators that provide power to the Sourdough water intake. A current project is underway to modify the intake, and as a result of the modifications, generators will be placed at the intake site. The intake site is inaccessible by a normal vehicle in the winter, and City staff will need an ability to haul fuel to the generator. This vehicle will also be used to haul tools and small equipment to remote sites as well as transport operators to spray weeds in City owned properties in the Sourdough Drainage. The vehicle is narrow and safer to use on mountainous trails that are heavily recreated. CONSEQUENCES OF DELAYING PROJECT Staff would need to continue to drive larger vehicles on narrow trails, which also may not be possible in winter conditions to provide fuel to the Sourdough intake generator. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $30,000 Adopted FY26-30 Capital Improvement Plan Page 327 of 383 346 New Equipment Trailer (WWW04) FUND DEPARTMENT PROJECT TYPE Water Water Operations Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Rate Revenue $50,000 Total Scheduled Project Cost $50,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This trailer will be used primarily to haul excavators and backhoes to excavation sites across town. With the growth of the city and potential equipment at the proposed Water Reclamation Facility site, it is not sustainable or feasible to transport equipment by driving it directly there. CONSEQUENCES OF DELAYING PROJECT The Water/Sewer Division will still be able to drive the equipment directly to excavation sites, but it may be on streets with speed limits that far exceed the capability of the equipment. Travel time will continually increase, disrupting other road users, potentially creating safety issues on City streets. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water $0 $0 $0 $0 $0 $25,000 Wastewater $0 $0 $0 $0 $0 $25,000 Total $0 $0 $0 $0 $0 $50,000 Adopted FY26-30 Capital Improvement Plan Page 328 of 383 347 WATER IMPACT FEE Adopted FY26-30 Capital Improvement Plan Page 329 of 383 348 Water Impact Fee Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 332 WIF33 Municipal Test Well & Mitigation System Exploration Program $ 1,622,400 $ -$ -$ -$ -$ 1,622,400 333 WIF99 Water Development Oversizing 355,000 720,000 305,000 - 655,000 2,035,000 334 WIF32 Municipal Groundwater Public Water Supply & Mitigation System Infrastructure - 1,000,000 9,000,000 - - 10,000,000 335 WIF68 Stucky/S 27th Water Improvements - 265,700 1,842,500 - - 2,108,200 336 WIF60 West Sourdough Reservoir #1 - - - 4,015,000 - 4,015,000 337 WIF59 Western Transmission Main / New South Pressure Zone - - - 1,350,000 16,400,000 17,750,000 Total $ 1,977,400 $ 1,985,700 $ 11,147,500 $ 5,365,000 $ 17,055,000 $ 37,530,600 Water Impact Fee Fund Unscheduled Projects Project Code Project Name Amount Description WIF59 Western Transmission Main / New South Pressure Zone $40,000,000 This project is identified as the Western Transmission Main in the 2017 water facility plan. Funding in the 5-year plan would be for Phase 1 design and construction, with subsequent phases funded outside of the 5-year window totalling $40 million. Phase 1 consists of new transmission main running on the hydraulic grade line from the sourdough water treatment plant tank to connect to the southwestern edge of the existing distribution network (S. 19th and Graf Street) to serve future anticipated growth. Project scope will be further defined with the ongoing South Pressure Zone WIF63 Sourdough Membrane WTP Expansion 28,000,000 This project consists of a new capital construction project to increase the capacity of the Sourdough Water Treatment Plant to 36 million-gallons-per-day. The original plant was constructed to a capacity of 22 million-gallons-per-day, with features that allow for expansion of the plant. The need for this expansion project will be determined by future availability of water rights and other water supply projects that may offset demand at the facility. WIF60 West Sourdough Reservoir #1 7,200,000 This project is identified as 5125 West Sourdough Reservoir 1 within the City's water facility plan and consists of planning, design, and construction of a new 5 million-gallon gravity fed ground storage reservior to the south/southwest of the City, which would tie into the west water transmission main - phase 1 (WIF59) and serve the existing City water distribution system. This project is identified as the next priority in the City's Water Facility Master Plan. Budget in FY29 is for planning and design. Budget for construction totals $7.2 milllion and is currently budgeted in unscheduled. WIF66 Davis Lane Water Improvement 240,000 This project consists of design and construction of a new 16-inch water main in Davis Lane from Baxter Lane to Cattail Street per recommendations in the Water Facility Plan Update (FP_1484). Total $75,440,000 Adopted FY26-30 Capital Improvement Plan Page 330 of 383 349 Map of Water Impact Fee Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 331 of 383 350 Municipal Test Well & Mitigation System Exploration Program (WIF33) FUND DEPARTMENT PROJECT TYPE Water Impact Fee Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $1,622,400 Total Scheduled Project Cost $1,622,400 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project provides funding for the City to conduct a municipal test well and mitigation system exploration program to drill test wells and identify mitigation options at various locations in and around the City, informed by previous groundwater investigation phase work, to incrementally develop a municipal groundwater supply that eventually achieves the groundwater target of 5,810 acre-feet contained in the 2013 Integrated Water Resources Plan. CONSEQUENCES OF DELAYING PROJECT The City's unallocated water supply is quickly being used up by new development. This project is essential for providing additional capacity for growth in the 8–10-year timeframe. Given the timeframe for water rights permitting, potentially being 3-5 years, this work must be advanced now to align with the timeframe for water supply needs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water Impact Fee $0 $1,622,400 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 332 of 383 351 Water Development Oversizing (WIF99) FUND DEPARTMENT PROJECT TYPE Water Impact Fee Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $2,035,000 Total Scheduled Project Cost $2,035,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project consists of water main oversizing associated with the development projects consistent with the City’s Water Facility Plan and the approved development plan. Public-private partnership for infrastructure construction allows for development to construct the pipe infrastructure required of the development, while the City provides oversizing funding for future growth per the water impact fee program. This is a highly cost-effective way of building infrastructure for future growth. CONSEQUENCES OF DELAYING PROJECT Without oversizing funding from the City’s Water Impact Fee program to match private development timeframe, future pipe size increases will be much more expensive than oversizing the pipe at the original construction of the pipe also allowing the full useful life (80-120 years) of the pipe to be achived before being replaced with a larger capacity pipe. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET All water pipe oversizing projects driven by development have been consolidated into this project for the purpose of flexibility to accommodate development projects timing. From previous capital plans, that includes Urban Farm Water and PRV Oversizing (WIF67), Turnrow Subdivision Water Main and PRV Oversizing (WIF69), Blackwood Groves Water Main (WIF56), Northwest Crossing Water Main Oversizing (WIF57). As the City does not control timing of developer-led projects, it is important to have flexibility to match this investment to the timing of the need. A generalized oversizing program allows the necessary flexibility that upon completion of a pipe improvement and final acceptance of the infrastructure by the City, developers may then be timely reimbursed for pipe oversizing. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Water Impact Fee $371,200 $355,000 $720,000 $305,000 $0 $655,000 Adopted FY26-30 Capital Improvement Plan Page 333 of 383 352 Municipal Groundwater Public Water Supply & Mitigation System Infrastructure (WIF32) FUND DEPARTMENT PROJECT TYPE Water Impact Fee Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS High Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $10,000,000 Total Scheduled Project Cost $10,000,000 STRATEGIC PLAN, IF APPLICABLE 4.3 Strategic Infrastructure Choices DESCRIPTION OF PROJECT This project is contingent upon obtaining a municipal groundwater water right permit from Montana Department of Natural Resources and Conservation (MT DNRC) and consists of but is not limited to the following major elements: obtaining land in fee or easement necessary to implement the mitigation plan and construct mitigation infrastructure approved with the municipal water right permit approved by MT DNRC; design, Department of Environmental Quality approval, and construction of a municipal public water supply well and attendant infrastructure to connect, operate and maintain the municipal well as part of the City's overall municipal water supply system. Attendant infrastructure may include but is not limited to: water disinfection and treatment processes, a building to house the well and treatment equipment, power, backup generator power, instrumentation and controls, site improvements, a transmission main to tie groundwater supply into the existing system, water storage, and hydraulic controls. CONSEQUENCES OF DELAYING PROJECT The City's unallocated water supply is being used up by new development. This project will help provide additional capacity for growth in the 8-10 year timeframe. Given the timeframe for water rights permitting potentially being 3-5 years, this work must be advanced now to align with the timeframe for water supply needs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET An overall cost reduction from $11.3 million to 10 million is a result of more recent planning level cost estimate from the City’s selected groundwater engineering consultant. . The project has been split between two fiscal years, with $1 million in FY27 for design, and $9 million in FY28 for construction. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water Impact Fee $0 $0 $1,000,000 $9,000,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 334 of 383 353 Stucky/S 27th Water Improvements (WIF68) FUND DEPARTMENT PROJECT TYPE Water Impact Fee Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS None Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue Rate Revenue $2,108,200 $702,800 Total Scheduled Project Cost $2,811,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project consists of design and construction of a new 16-inch water main in Stucky Road from S. 19th to Fowler Ave per recommendations in the Water Facility Plan Update (FP_1386, FP_1372, FP_1371) simultaneous with the Stucky Road street impact fee project. CONSEQUENCES OF DELAYING PROJECT This project need is driven by development along with simultaneous construction of the Stucky Road project. Delaying this project will result in signficantly higher future cost to construct the water main as well as a second construction impact on traffic on Stucky Road. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water Impact Fee $0 $0 $265,700 $1,842,500 $0 $0 Water $0 $0 $88,600 $614,200 $0 $0 Total $0 $0 $354,300 $2,456,700 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 335 of 383 354 West Sourdough Reservoir #1 (WIF60) FUND DEPARTMENT PROJECT TYPE Water Impact Fee Water Plant Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 4 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $4,015,000 Total Scheduled Project Cost $4,015,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This project is identified as 5125 West Sourdough Reservoir 1 within the City's water facility plan and consists of planning, design, and construction of a new 5 million-gallon gravity fed ground storage reservior to the south/southwest of the City, which would tie into the west water transmission main - phase 1 (WIF59) and serve the existing City water distribution system. This project is identified as the next priority in the City's Water Facility Master Plan. Budget in FY29 is for planning and design. Budget for construction totals $7.2 milllion and is currently budgeted in unscheduled. CONSEQUENCES OF DELAYING PROJECT Delay would result in limiting growth in the south and southwestern areas of the community. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water Impact Fee $0 $0 $0 $0 $4,015,000 $0 Adopted FY26-30 Capital Improvement Plan Page 336 of 383 355 Western Transmission Main / New South Pressure Zone (WIF59) FUND DEPARTMENT PROJECT TYPE Water Impact Fee Water Operations Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Impact Fee Revenue $17,750,000 Total Scheduled Project Cost $17,750,000 STRATEGIC PLAN, IF APPLICABLE 4. A Well-Planned City DESCRIPTION OF PROJECT This project is identified as the Western Transmission Main in the 2017 water facility plan. Funding in the 5-year plan would be for Phase 1 design and construction, with subsequent phases funded outside of the 5-year window totalling $40 million. Phase 1 consists of new transmission main running on the hydraulic grade line from the sourdough water treatment plant tank to connect to the southwestern edge of the existing distribution network (S. 19th and Graf Street) to serve future anticipated growth. Project scope will be further defined with the ongoing South Pressure Zone Pre-Design and WTP Facility Plan project including identification of quantity and location of hydraulic controls valves to connect the new pressure zone to the existing system. CONSEQUENCES OF DELAYING PROJECT Delay of this work will limit growth in the south and southwestern portions of the community not within the existing water pressure zones capable of serving those areas. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The updated plan includes project design phase in FY29 and Phase 1 construction will begin in FY30. This plan allows time to complete the South Pressure Zone Pre-Design and WTP Facility Plan projects which will further inform scope of the Phase 1 project and provide for potential development of a public/private partnership to fund this infrastructure. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Water Impact Fee $0 $0 $0 $0 $1,350,000 $16,400,000 Adopted FY26-30 Capital Improvement Plan Page 337 of 383 356 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 338 of 383 357 PUBLIC WELFARE Adopted FY26-30 Capital Improvement Plan Page 339 of 383 358 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 340 of 383 359 FORESTRY (TREE MAINTENANCE) Adopted FY26-30 Capital Improvement Plan Page 341 of 383 360 Tree Maintenance Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 343 FOR23 Urban Forest Management Plan: 2026 Update $ 85,000 $ -$ -$ -$ -$ 85,000 344 FOR18 Forestry Midsize Truck Replacement 45,000 - - - - 45,000 345 FOR17 Forestry Brush Chipper - - 85,000 - - 85,000 346 FOR13 Aerial Lift / Bucket Truck - - - 200,000 - 200,000 347 FOR11 Log Loader Truck - - - - 150,000 150,000 Total $ 130,000 $ -$ 85,000 $ 200,000 $ 150,000 $ 565,000 Tree Maintenance Fund Unscheduled Projects No unscheduled projects. Adopted FY26-30 Capital Improvement Plan Page 342 of 383 361 Urban Forest Management Plan: 2026 Update (FOR23) FUND DEPARTMENT PROJECT TYPE Tree Maintenance Forestry/Tree Maintenance Other OPERATING IMPACT COST ESTIMATE CLASS Moderate N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $85,000 Total Scheduled Project Cost $85,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT This item funds the contracted services to update our Urban Forest Management Plan from 2016. This project would involve ample public and City Commission input and will become the key framework for all Forestry Department Operations. Ideally the plan should be updated every 10 years. CONSEQUENCES OF DELAYING PROJECT Delaying the project would require the City to rely on an outdated, original 2016 plan for management strategies and community outreach and education goals. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Tree Maintenance $0 $85,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 343 of 383 362 Forestry Midsize Truck Replacement (FOR18) FUND DEPARTMENT PROJECT TYPE Tree Maintenance Forestry/Tree Maintenance Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $45,000 Total Scheduled Project Cost $45,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project accounts for replacements of existing half-ton pickups. The Forestry division has one remaining 2008 half-ton pickup. The CIP item will replace this with a midsize pickup. Small pickups are needed for solo work and transporting equipment. Switching to mid-size pickups provides the same function with substantial cost-savings compared to full-size trucks. CONSEQUENCES OF DELAYING PROJECT Forestry has a goal of replacing vehicles at 20-years-old to maintain reliability and upgrade to modern technologies. Replacements will be evaluated for most efficient use before purchasing. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Cost for FY26 replacement has been reduced slightly to reflect purchase of a midsize pickup instead of full size. An additional pickup for FY28 has been removed from the CIP following staff discussions deeming it unneccessary. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Tree Maintenance $52,000 $45,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 344 of 383 363 Forestry Brush Chipper (FOR17) FUND DEPARTMENT PROJECT TYPE Tree Maintenance Forestry/Tree Maintenance Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $85,000 Total Scheduled Project Cost $85,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project accounts for the replacement of the department’s 2005 brush chipper. This is a critical piece of equipment with modern improvements (chipping capacity, winch lines) to reduce worker fatigue and improve ergonomics. CONSEQUENCES OF DELAYING PROJECT Delaying the project would require the department to rely on existing chippers which are much less efficient and require more repairs. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. Our current 2005 brush chipper has parts that are increasingly difficult to find, and it is spending more time down for repairs. Chippers are a heavily utilized piece of critical equipment that are replaced at least every 20 years for safety, reliabillity, and modern emmission standards. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Tree Maintenance $0 $0 $0 $85,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 345 of 383 364 Aerial Lift / Bucket Truck (FOR13) FUND DEPARTMENT PROJECT TYPE Tree Maintenance Forestry/Tree Maintenance Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $200,000 Total Scheduled Project Cost $200,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project accounts for the replacement of a 2008 aerial lift. The Forestry Department has two aerial lifts, which are critical for productivity and emergency response. CONSEQUENCES OF DELAYING PROJECT Delaying the purchase of this lift would result in the department relying on an aging fleet (20+ yrs old). CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET None. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Tree Maintenance $0 $0 $0 $0 $200,000 $0 Adopted FY26-30 Capital Improvement Plan Page 346 of 383 365 Log Loader Truck (FOR11) FUND DEPARTMENT PROJECT TYPE Tree Maintenance Forestry/Tree Maintenance Vehicle OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $150,000 Total Scheduled Project Cost $150,000 STRATEGIC PLAN, IF APPLICABLE N/A DESCRIPTION OF PROJECT This project accounts for replacement of the department’s 2001 crane log loader. This truck would be driveable by all staff members, not limited to those with a commerical drivers license (CDL), and utilized for loading heavy materials. CONSEQUENCES OF DELAYING PROJECT Rely on existing under-CDL crane truck which has limited capacity and is very inefficient. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Tree Maintenance $0 $0 $0 $0 $0 $150,000 Adopted FY26-30 Capital Improvement Plan Page 347 of 383 366 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 348 of 383 367 PARKS & TRAILS MAINTENANCE Adopted FY26-30 Capital Improvement Plan Page 349 of 383 368 Parks & Trails Maintenance District Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 353 PTD03 Playground/Skate Park Improvements $ 200,000 $ 650,000 $ 350,000 $ 700,000 $ 400,000 $ 2,300,000 354 PTD09 Deferred Maintenance 200,000 450,000 450,000 750,000 750,000 2,600,000 355 PTD02 Parks Restroom Upgrades 200,000 200,000 - - - 400,000 356 PTD04 Park Vehicles Replacements 150,000 195,000 224,000 247,000 259,400 1,075,400 357 PTD22 Sound Mitigation 150,000 - - - - 150,000 358 PTD13 Sports Complex 90,000 1,000,000 1,000,000 - - 2,090,000 359 PTD05 Toolcat Multi Purpose 90,000 - 99,200 - 109,400 298,600 360 PTD26 Bikefill Community Park 80,000 250,000 250,000 - - 580,000 361 PTD23 Pickleball Courts 75,000 1,000,000 - - - 1,075,000 362 PTD06 Park Shelter Replacement 75,000 275,000 - - - 350,000 363 PTD20 Loop Trail Feasibility Study 70,000 - - - - 70,000 364 PTD27 Cattail Corridor Parks and Anchor Route - 300,000 300,000 - - 600,000 365 PTD19 New Multipurpose Utility/Snow Machine - 160,000 - 180,000 - 340,000 366 PTD01 Large Deck Mower Replacement - 93,700 - 103,300 - 197,000 Total $ 1,380,000 $ 4,573,700 $ 2,673,200 $ 1,980,300 $ 1,518,800 $ 12,126,000 Adopted FY26-30 Capital Improvement Plan Page 350 of 383 369 Parks & Trails Maintenance District Fund Unscheduled Projects Project Code Project Name Amount Description PTD13 Sports Complex $6,000,000 Construct 6 new fields, two with artificial turf and four with natural grass. PTD15 Softball Lighting 1,200,000 Replace the current field lights at the Softball Complex with appropriate field lights. PTD16 Irrigation System 1,000,000 Replace old and outdated irrigation systems throughout the City. PTD08 Bridge Replacements 500,000 This project will replace aging bridge structures throughout the park and trail system. Bridges scheduled for improvements and/or replacement include East Gallatin Recreation Area, Bronken Natural Area and smaller foot bridges throughout the system such as Harvest Creek and Alder Creek. PTD06 Park Shelter Replacement 320,000 Park shelters are a popular amenity in the Bozeman park system. Harsh weather conditions and general wear and tear make it necessary to improve/replace the shelters when needed. PTD11 Parks: Backhoe 130,000 This piece of equipment would replace the parks 1992 backhoe which has 4,455 hours PTD14 Sidewalk Replace- Parks 88,000 Sidewalks are identified for replacement due to deteriorating cement, missing sections, and heaving from weather and tree roots. New sidewalks must meet or exceed City code. Replacing the old sidewalk will result in a safer sidewalk year-round and enable the sidewalk plows to better clean the surfaces. Total $9,238,000 Adopted FY26-30 Capital Improvement Plan Page 351 of 383 370 Map of Parks & Trails Maintenance District Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 352 of 383 371 Playground/Skate Park Improvements (PTD03) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Equipment OPERATING IMPACT COST ESTIMATE CLASS Positive N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $2,300,000 Total Scheduled Project Cost $2,300,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT This project accounts for continued replacement and improvements of antiquated playgrounds and multi-generational amenities. Playground replacements provide citizens with safe, inclusive equipment that is modern and complies with national playground safety standards. Current playgrounds scheduled for improvements include Lindley, Kirk, and New Hyalite View. Playground structures have a 15-year lifespan, and therefore improvements are ongoing based on use and needed maintenance/replacements. CONSEQUENCES OF DELAYING PROJECT A majority of the equipment being replaced is out of safety compliance and detiorating due to the age of the playground. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET An additional playground is scheduled for improvement in FY30. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $200,000 $200,000 $650,000 $350,000 $700,000 $400,000 Adopted FY26-30 Capital Improvement Plan Page 353 of 383 372 Deferred Maintenance (PTD09) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $2,600,000 Total Scheduled Project Cost $2,600,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT This item addresses Parks and Trails District deferred maintenance items and projects as a part of the 10-year deferred maintenance plan. As budget years approach, some items are moved to operating budget or into specific capital projects. Larger projects include Softball Complex upper parking lot improvements, Anderson Pavilion at Bogert Park asphalt replacement, athletic field fencing and backstop replacements, and electrical and irrigation repairs at Lindley Park and Softball Complex. CONSEQUENCES OF DELAYING PROJECT The consequence of delaying deferred maintenance will be failing park amenities, poor aesthetics, and in some cases, unsafe access to park locations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Reduction in FY27 and FY28 to fund PTD26 Bikefill Community Park project. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $200,000 $200,000 $450,000 $450,000 $750,000 $750,000 Adopted FY26-30 Capital Improvement Plan Page 354 of 383 373 Parks Restroom Upgrades (PTD02) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $400,000 Total Scheduled Project Cost $400,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT This project is the general replacement and upgrading of the City’s parks public restroom facilities. Parks scheduled for upgrades include Kirk, Rose, and Bozeman Pond. The new units will be able to hold up to vandalism, and with no running water, stay open in the winter with no risk of freezing water. CONSEQUENCES OF DELAYING PROJECT Delaying this project could result in additional vandalism to flush restrooms, closures, and subsequent utilization of temporary portable restroom units. Examples of vandalism to flush restrooms include intentionally clogged toilets, intentionally broken fixtures, people doing laundry in the toilets and sinks. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Changed FY25 budget from $275,000 to $100,000, added $200,000 to FY26. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Revised FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $100,000 $200,000 $200,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 355 of 383 374 Park Vehicle Replacements (PTD04) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $1,075,400 Total Scheduled Project Cost $1,075,400 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT The Parks department utilizes vehicles for mowing, fertilization, irrigation, inspections, snow plowing, and repairs of 1,000 acres of City parks. The Parks & Trails District has approximately 20 full-size pickup trucks many of which are 20 to 30 years old. As a portion of deferred maintenance, we are replacing the fleet and starting a schedule of regular replacement every 10 years. Due to the Parks and Trails District being established four years ago, Park staff are playing catch-up on replacing old trucks that are at the end of useful life. CONSEQUENCES OF DELAYING PROJECT The delay of this project would impact staff’s ability to effectively and efficiently maintain City parks resulting in poor overall maintenance and aesthetics in Bozeman’s park system. Older vehicles are more costly to maintain and less efficient, as well. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Budgeted amounts in FY27-29 have been increased 5% per year to reflect anticipated inflationary increases. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $180,000 $150,000 $195,000 $224,000 $247,000 $259,400 Adopted FY26-30 Capital Improvement Plan Page 356 of 383 375 Sound Mitigation (PTD22) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Other OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $150,000 Total Scheduled Project Cost $150,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Sound mitigation for the pickleball courts at Bogert Park to reduce audio impact to adjacent neighbors. This aligns with current best practices of pickleball adjacent to residences. CONSEQUENCES OF DELAYING PROJECT Delaying the project may require that the pickleball courts at Bogert be closed more often due to noise concerns and continue to negatively affect some neighbors. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This is a new project resulting from community feedback and current best practices. Additional costs will be absorbed using 2025 Biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $150,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 357 of 383 376 Sports Complex (PTD13) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue & Other $2,090,000 Total Scheduled Project Cost $2,090,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Fiscal Year 2026 is the design of an additioanl parking lot along Cottonwood Road. Fiscal Year 2027 is the construction of the Cottonwood Road parking lot. Fiscal Year 2028 is the replacement of the synthetic turf on fields five and six. Those two fields were built in 2017 and have an eight-year warranty and 8-10-year lifespan. CONSEQUENCES OF DELAYING PROJECT The artificial turf (surface carpet portion) has an operational life span of eight to ten years, based on many factors such as hours of play, vandalism to the surface, and most importantly, weather conditions. Delaying this project could compromise player safety. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Added $1,090,000 for Cottonwood Road parking lot. Increased field usage has created a need for additional parking. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $90,000 $1,000,000 $1,000,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 358 of 383 377 Toolcat Multi Purpose (PTD05) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $298,600 Total Scheduled Project Cost $298,600 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Toolcats are valuable, multi purpose tools used for a number of purposes including snow plowing sidewalks around parks, mowing undeveloped parkland, trail maintenance, removal of snow via a snowbower attachment on the artificial turf and trail contruction. The Park & Trails Districts has three multi-purpose Toolcats that are replaced on a regular replacement schedule every 8 to 10 years. CONSEQUENCES OF DELAYING PROJECT The delay of this project would impact staff’s ability to effectively and efficiently maintain City parks resulting in poor overall maintenace and aesthetics in Bozeman’s park system. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Changes to the budget for this project are a 5% increase per year to the cost of the current prices and the addition of one new Toolcat in FY30. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $90,000 $0 $99,200 $0 $109,400 Adopted FY26-30 Capital Improvement Plan Page 359 of 383 378 Bikefill Community Park (PTD26) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $580,000 Total Scheduled Project Cost $580,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Momentum is growing on a proposal from community partners led by Gallatin Valley Land Trust (GVLT) to utilize and develop approximately 60 acres at the Bozeman Convenience Site as a 60-acre recreation area adjacent to Snowfill dog park. Total project cost is estimated to be roughly $3 million dollars; however, the scope and scale of the project will not be finalized until a public park master plan process is completed. The initial funding of $80,000 will allow the Parks and Rec Department to initiate planning and design contracts including public engagement. The total construction cost is estimated to be approximately $3.0 million dollars. The $500,000 in FY27 and FY28 is intended to serve as the City of Bozeman’s match for a federal grant through the Land and Water Conservation Fund (LWCF) Program. Discussions with GVLT, Southwest Montana Mountain Bike Association, and other partners surrounding project fundraising, construction phasing, and long-term maintenance and operations are ongoing. CONSEQUENCES OF DELAYING PROJECT Donations and other potential partner funding may not be available to complete this community project in the future. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This a new project with significant community contribution and leadership. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $80,000 $250,000 $250,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 360 of 383 379 Pickleball Courts (PTD23) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $1,075,000 Total Scheduled Project Cost $1,075,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Due to the increase in popularity of pickleball and subsequent impact to the courts and neighborhood at Bogert Park, this item will add new pickleball courts in a community park, the exact location to be determined. $75,000 in FY26 for design, $1,000,000 in FY27 for grading & base prep, paving, fencing, and landscaping. CONSEQUENCES OF DELAYING PROJECT Delaying this project could cause increased crowding, pressure, and impact to Bogert Park, parking in the area, ultimately negatively impacting the neighbors. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New project as a result of community feedback and popularity that exceeds expectations. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $75,000 $1,000,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 361 of 383 380 Park Shelter Replacement (PTD06) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue $350,000 Total Scheduled Project Cost $350,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Park shelters are a popular amenity in the Bozeman park system. Harsh weather conditions and general wear and tear make it necessary to improve/replace the shelters when needed. Identified Park pavilions/shelters scheduled for improvements include Lindley Park shelter planning and design in FY26 and Jarrett pavilion replacement in FY26. Construction of the Lindley Park pavilion in FY27 and Kirk Park pavilion replacement. CONSEQUENCES OF DELAYING PROJECT The consequence of not improving or replacing shelters as needed will be failing infrastructure which could result in serious safety issues such as a shelter breaking/falling. Additionally, park aesthetics are important, and older unkept shelters impact the safety and cleanliness of public parks. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Moved $350,000 from FY25 and placed $75,000 in FY26 and $275,000 in FY27. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $50,000 $75,000 $275,000 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 362 of 383 381 Loop Trail Feasibility Study (PTD20) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Other OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $70,000 Total Scheduled Project Cost $70,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT This project is for the compeletion of a feasibility study to determine the optimal route for the recreational Loop Trail identified in the Parks, Recreation and Active Transportation (PRAT) plan. The development of the trail system will include collaboration with Gallatin County, Belgrade, and other regional partners. CONSEQUENCES OF DELAYING PROJECT Delaying the feasibility study for the Loop Trail would likely result in the delayed development of the trail. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Project budget has been moved up to FY26 as a suitable project for the Metropolitan Planning Organization (MPO) that will align with Gallatin County’s study of Cottonwood Road. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $70,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 363 of 383 382 Cattail Corridor Parks and Anchor Route (PTD27) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Assessment Revenue Cash-in-lieu $600,000 $500,000 Total Scheduled Project Cost $1,100,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT The Cattail Creek Park and Anchor Route Master Plan is underway and this funding is for its implementation including construction or installation of the following facilities and improvements: 3 miles of shared use pathway; riparian, native and drought tolerant trees and plants and irrigation adjustments; bridges; public art; sports courts; wayfinding; and benches. This work will be completed by Parks and Recreation, community partners, and developments within the project area. CONSEQUENCES OF DELAYING PROJECT This project will be the first to implement Parks, Recreation and Trails Plan (PRAT Plan) directives broadly, demonstrating that public engagement leads to positive improvements within the park system. Consequences of delaying the project include loss of public trust, planning fatigue on behalf of the community, and without the planning of investments, the parks will remain disconnected, will not be upgraded to current water conservation standards, and parks within the system will not provide the highest level of community benefit and access. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New item for PRAT Implementation. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $0 $0 $300,000 $300,000 $0 $0 Park Land Trust $0 $500,000 $0 $0 $0 $0 Total $0 $500,000 $300,000 $300,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 364 of 383 383 New Multipurpose Utility/Snow Machine (PTD19) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $340,000 Total Scheduled Project Cost $340,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT Multipurpose heavy duty machine for clearing sidewalks and trails of heavy snow, sweeping, mowing, etc. The new machines are more robust and mechanically superior to some of our current and previous equipment. Currently, Montana State University is using MultiHogs, with excellent results. These new vehicles will supplement our existing fleet with state of the art equipment used in our most challenging areas and environments. Currently, our division still operates one of these machines (a Canadian MT trackless) and it was purchased back in 1991. These vehicles will be in addition to our current fleet. CONSEQUENCES OF DELAYING PROJECT Delaying the purchase of a snow machine will lead to less efficient processes for snow removal and City staff will continue using current inventory to do the work. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Increased budget in FY27 and FY29 to more accurately reflect anticipated costs due to inflation. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $140,000 $0 $160,000 $0 $180,000 $0 Adopted FY26-30 Capital Improvement Plan Page 365 of 383 384 Large Deck Mower Replacement (PTD01) FUND DEPARTMENT PROJECT TYPE Parks & Trails Maint Dist Parks Vehicle OPERATING IMPACT COST ESTIMATE CLASS Negligible N/A FUNDING SOURCE(S) AMOUNT Assessment Revenue $197,000 Total Scheduled Project Cost $197,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT This project accounts for the replacement of a large-deck formal turf mower in FY25, which will replace the oldest mower in the fleet. After approximately four thousand hours, mower infrastructure starts to fail on a regular basis. Additionally, new mowers are being requested in FY27 and FY29 to support an expanding Parks and Trails District. The district has a total of twelve mowers, as of fiscal year 2024. CONSEQUENCES OF DELAYING PROJECT The regular replacement of and additions to the fleet of mowers will increase mowing efficiency, reduce frequency of mechanical breakdowns, and enable the department to take on new parks and absorb parks that were previoulsy maintained by homeowners associations. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET Changes to the project include a 5% increase per year to the cost of the current mower prices. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Parks & Trails Maint Dist $85,000 $0 $93,700 $0 $103,300 $0 Adopted FY26-30 Capital Improvement Plan Page 366 of 383 385 STORY MANSION SPECIAL REVENUE FUND Adopted FY26-30 Capital Improvement Plan Page 367 of 383 386 Story Mansion Special Revenue Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 370 GF389 Story Mansion Improvements $ -$ 827,700 $ 45,300 $ 137,500 $ 150,700 $ 1,161,200 371 GF390 Story Mansion Carriage House Improvements - - 114,500 32,700 - 147,200 Total $ -$ 827,700 $ 159,800 $ 170,200 $ 150,700 $ 1,308,400 Story Mansion Special Revenue Fund Unscheduled Projects No unscheduled projects. Adopted FY26-30 Capital Improvement Plan Page 368 of 383 387 Map of Story Mansion Special Revenue Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 369 of 383 388 Story Mansion Improvements (GF389) FUND DEPARTMENT PROJECT TYPE Story Mansion Special Revenue Recreation Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $1,161,200 Total Scheduled Project Cost $1,161,200 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Per Facilities Condition Assessment (FCA) recommendations, building structure repair, electrical and lighting study and upgrades (FY27), flooring repair (FY28), plumbing upgrades (FY29), HVAC system upgrades (FY30). CONSEQUENCES OF DELAYING PROJECT Potential safety and compliance issues are likely to result if these improvements are delayed. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New as a result of the 2023 Facilities Condition Assessment (FCA). FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Story Mansion Special Revenue $0 $0 $827,700 $45,300 $137,500 $150,700 Adopted FY26-30 Capital Improvement Plan Page 370 of 383 389 Story Mansion Carriage House Improvements (GF390) FUND DEPARTMENT PROJECT TYPE Story Mansion Special Revenue Recreation Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $147,200 Total Scheduled Project Cost $147,200 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT Per Facilities Condition Assessment (FCA) recommendations, repair and paint exterior walls including wood shingle siding, painted cedar wood shingle siding, and vertical wood siding (FY28), replace exterior windows (FY29). CONSEQUENCES OF DELAYING PROJECT The integrity of the siding will be impacted as the existing paint continues to wear off. This could result in a full replacement of the siding and a much more costly project. Windows are single pane and in poor condtion, delaying replacement will further impact energy efficiency and create a potential saftey issue. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New as a result of the 2023 Facilities Condition Assessment (FCA). FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Story Mansion Special Revenue $0 $0 $0 $114,500 $32,700 $0 Adopted FY26-30 Capital Improvement Plan Page 371 of 383 390 Page Intentionally Left Blank Adopted FY26-30 Capital Improvement Plan Page 372 of 383 391 PARK LAND TRUST Adopted FY26-30 Capital Improvement Plan Page 373 of 383 392 Park Land Trust Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 376 PTD27 Cattail Corridor Parks and Anchor Route $ 500,000 $ -$ -$ -$ -$ 500,000 377 PK1820 Rose Park Phase 2 100,000 - - - - 100,000 378 PK1821 Bogert Ice Rink Improvements - - 170,000 - - 170,000 Total $ 600,000 $ -$ 170,000 $ -$ -$ 770,000 Park Land Trust Fund Unscheduled Projects No unscheduled projects. Adopted FY26-30 Capital Improvement Plan Page 374 of 383 393 Map of Park Land Trust Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 375 of 383 394 Cattail Corridor Parks and Anchor Route (PTD27) FUND DEPARTMENT PROJECT TYPE Park Land Trust Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Minimal Class 5 FUNDING SOURCE(S) AMOUNT Cash-in-lieu Assessment Revenue $500,000 $600,000 Total Scheduled Project Cost $1,100,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT The Cattail Creek Park and Anchor Route Master Plan is underway and this funding is for its implementation including construction or installation of the following facilities and improvements: 3 miles of shared use pathway; riparian, native and drought tolerant trees and plants and irrigation adjustments; bridges; public art; sports courts; wayfinding; and benches. This work will be completed by Parks and Rec, community partners and developments within the project area. CONSEQUENCES OF DELAYING PROJECT This project will be the first to implement Parks, Recreation and Trails Plan (PRAT Plan) directives broadly, demonstrating that public engagement leads to positive improvements within the park system. Consequences of delaying the project include loss of public trust, planning fatigue on behalf of the community, and without the planning of investments, the parks will remain disconnected, will not be upgraded to current water conservation standards, and parks within the system will not provide the highest level of community benefit and access. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New item for PRAT Implemetation. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Park Land Trust $0 $500,000 $0 $0 $0 $0 Parks & Trails Maint Dist $0 $0 $300,000 $300,000 $0 $0 Total $0 $500,000 $300,000 $300,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 376 of 383 395 Rose Park Phase 2 (PK1820) FUND DEPARTMENT PROJECT TYPE Park Land Trust Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 1 FUNDING SOURCE(S) AMOUNT Cash In Lieu $100,000 Total Scheduled Project Cost $100,000 STRATEGIC PLAN, IF APPLICABLE 6. A Sustainable Environment DESCRIPTION OF PROJECT Completion of Rose Park Phase 2 including tree planting, pathway connections, irrigation adjustments, and course layout improvements. Phase 1 was completed in FY24-25 by the adjacent developer as part of a master plan and improvements-in-lieu package. CONSEQUENCES OF DELAYING PROJECT The consequences of delaying the project include increased cost due to inflation, park system inequities in an area of significant residential growth, and diminished climate resiliency. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. Additional cash-in-lieu revenue generated by a development project in the vicinity allowed for scheduling this project. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Park Land Trust $0 $100,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 377 of 383 396 Bogert Ice Rink Improvements (PK1821) FUND DEPARTMENT PROJECT TYPE Park Land Trust Parks Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Positive Class 2 FUNDING SOURCE(S) AMOUNT Cash In Lieu $170,000 Total Scheduled Project Cost $170,000 STRATEGIC PLAN, IF APPLICABLE 3.4 Active Recreation DESCRIPTION OF PROJECT This project aims to reduce operational costs in terms of staff time and will improve ice conditions at the Bogert Pavilion. Increasing winter and evening recreational opportunities are actions promoted in the Parks, Recreation, and Active Transportation Plan to provide more opportunity for people to use parks all year round and throughout the entire day. The project would replace the cumbersome existing rink equipment, improve airflow under the pavilion to prevent ice melting, and other changes to the site’s access (installing a gate or bollards) to make daily operation easier and prevent misuse. CONSEQUENCES OF DELAYING PROJECT Delaying the project increases the chance for staff and public injury from cumbersome boards, prolongs the inefficient use of staff time with maintenance, and increases the likelyhood of poor or shortened skating seasons. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET This project is new to the capital plan. This project aligns with strategies and actions from the Parks, Recreation, and Active Tranposrtation (PRAT) Plan adopted in fiscal year 2024. Due to staff capacity and cash-in-lieu funding availibility this is the earliest we can address the issue and project. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Park Land Trust $0 $0 $0 $170,000 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 378 of 383 397 LIBRARY DEPRECIATION Adopted FY26-30 Capital Improvement Plan Page 379 of 383 398 Library Depreciation Fund Scheduled Projects Page Number Project Code Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total 382 LIB33 Irrigation Replacement $ 200,000 $ -$ -$ -$ -$ 200,000 383 LIB31 Aircooled Chiller Replacement - 200,000 - - - 200,000 Total $ 200,000 $ 200,000 $ -$ -$ -$ 400,000 Library Depreciation Fund Unscheduled Projects No unscheduled projects. Adopted FY26-30 Capital Improvement Plan Page 380 of 383 399 Map of Library Depreciation Fund Infrastructure Projects Adopted FY26-30 Capital Improvement Plan Page 381 of 383 400 Irrigation Replacement (LIB33) FUND DEPARTMENT PROJECT TYPE Library Depreciation Fund Library Infrastructure OPERATING IMPACT COST ESTIMATE CLASS Unknown Class 4 FUNDING SOURCE(S) AMOUNT Discretionary $200,000 Total Scheduled Project Cost $200,000 STRATEGIC PLAN, IF APPLICABLE 5. A Creative, Learning Culture DESCRIPTION OF PROJECT Replacement of Bozeman Public Library's original 2006 irrigation system to address rapidly increasing annual repair costs to maintain aging pipework, which have risen to over $15,000 per year. Replacement of the irrigation system will result in decreased annual operating costs, a reduction in water use, and improved performance of the system. Due to the invasiveness of excavating and replacing irrigation systems under existing garden beds, it is likely that additional landscape design and planting replacements will be required as the irrigation system design is developed. CONSEQUENCES OF DELAYING PROJECT Failure to replace the irrigation system will result in continually increasing maintenance and repair costs as piping continues to degrade. Failures in the irrigation system will cause intermittent loss of irrigation service risking significant impacts to the viability of landscaping. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET New. Additional costs will be absorbed using 2025 biennium budget savings if available, otherwise a budget amendment may be required. FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Library Depreciation Fund $0 $200,000 $0 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 382 of 383 401 Aircooled Chiller Replacement (LIB31) FUND DEPARTMENT PROJECT TYPE Library Depreciation Fund Library Equipment OPERATING IMPACT COST ESTIMATE CLASS Negligible Class 3 FUNDING SOURCE(S) AMOUNT Discretionary $489,400 Total Scheduled Project Cost $489,400 STRATEGIC PLAN, IF APPLICABLE 7. A High-Performance Organization DESCRIPTION OF PROJECT The Bozeman Public Library cooling system consists of a single air-cooled chiller which provides critical environmental controls for the facility. The average life expectancy of an air-cooled chiller is 15-20 years. Originally installed in 2006, the air-cooled chiller is likely nearing the end of its expected life. Additional funding for this project exists in the General Fund. Additional escalation cost was not captured in the number that was approved by the Library Board. If funds are available in FY27 in the Library Depreciation Fund, they will be used for the overage. CONSEQUENCES OF DELAYING PROJECT Parts for the existing chiller are no longer available. If it fails, the Library will lose cooling until a replacement is installed. CHANGES FROM PRIOR CIP OR 2025 BIENNIUM BUDGET The project cost was increased $85,400 due to our annual recalculation of estimated project costs based on updated construction pricing data available in our FCA system FUND FY25 Adopted FY26 FY27 FY28 FY29 FY30 Library Depreciation Fund $0 $0 $200,000 $0 $0 $0 General Fund $0 $0 $289,400 $0 $0 $0 Total $0 $0 $489,400 $0 $0 $0 Adopted FY26-30 Capital Improvement Plan Page 383 of 383 402 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Michael Stoerger, Admin Asst. II Mitch Overton, Parks & Rec Director SUBJECT:MTRPA Conference Update MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Citizen Advisory Board/Commission RECOMMENDATION:N/A STRATEGIC PLAN:3.4 Active Recreation: Facilitate and promote recreational opportunities and active health programs and facilities. BACKGROUND:N/A UNRESOLVED ISSUES:As suggested by the UPF Board ALTERNATIVES:As suggested by the UPF Board FISCAL EFFECTS:N/A Report compiled on: January 23, 2025 403 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Michael Stoerger, Admin Asst II Mitch Overton, Parks & Rec Director SUBJECT:UDC Process Update MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Citizen Advisory Board/Commission RECOMMENDATION:N/A STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of an interconnected system of parks, trails and open spaces. BACKGROUND:N/A UNRESOLVED ISSUES:As suggested by the UPF Board ALTERNATIVES:As suggested by the UPF Board FISCAL EFFECTS:N/A Report compiled on: January 23, 2025 404 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Michael Stoerger, Admin. Asst. II Mitch Overton, Parks & Rec Director SUBJECT:Commission Priorities Review MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Citizen Advisory Board/Commission RECOMMENDATION:N/A STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of an interconnected system of parks, trails and open spaces. BACKGROUND:N/A UNRESOLVED ISSUES:As suggested by the UPF Board ALTERNATIVES:As suggested by the UPF Board FISCAL EFFECTS:N/A Attachments: 070224_Bozeman_City_Commission_Priorities_List_24.26.pdf Report compiled on: January 23, 2025 405 About the Priorities Every two years, Bozeman City Commission meets to discuss the priorities process, a list of goals that the elected body directs city staff to complete within a two-year time frame. All goals are important projects that impact our community and are unique activities that staff perform within the designated timeframe. For the 2024-2026 priority cycle, Bozeman City Commission has chosen the following priorities: An Engaged Community o Foster and build public trust, support, and pride in local government. Safe, Welcoming Community o Develop a Tenants Right to Counsel Program. o Develop a comprehensive regional strategy on homelessness. o Implement at least 8 recommendations from the Belonging in Bozeman Plan. A Well-Planned City o Rework and restore a new Historic Preservation Policy - including trees and landmarks. o Encourage the creation of ADUs in our city through an ADU Incentive Program. o Create an Affordable Housing Preservation Policy. o Ramp up the SAFE Plan and become a Gold-level Bike Friendly Community. Sustainable Environment o Create a Bozeman Creek Resiliency Plan. 406 Bozeman City Commission Two-Year Priorities List 2 An Engaged Community Goal: Foster and build public trust, support, and pride in local government. Safe, Welcoming Community Goal: Develop a Tenants Right to Counsel Program. Goal: Develop a comprehensive regional strategy on homelessness. Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Create opportunities for neighborhood and community-wide outreach events involving City Commissioners. Utilize engagement plans around all major initiatives and ensure broad representation. Communicate achievements through FYI at Commission. 2024 2025 2026 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Research, analyze and develop program options. Funding and program option discussion at Commission pending positive legal review. 2024 2025 2026 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Collaborate with Regional Housing Coalition to develop a plan. Potential plan adoption. 2024 2025 2026 407 Bozeman City Commission Two-Year Priorities List 3 Goal: Implement at least 8 recommendations from the Belonging in Bozeman Plan. A Well-Planned City Goal: Rework and restore a new Historic Preservation Policy – including trees and landmarks. Goal: Encourage the creation of ADUs in our city through an ADU Incentive Program. Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Create a new Belonging in Bozeman Coordinator staff position and dedicated budget. Create a full-time position to serve as ADA Coordinator. Hire a part-time Disability Community Liaison and full-time Bozeman PD Community Liaison. Recovene the Belonging in Bozeman interdepartmental committee and update its charter. Continue to convene external partners to implement Belonging in Bozeman Plan. Support partner organizations by funding transitional and emergency housing programs. Develop an equity impacts decision-making tool and train boards, staff, Commission on its use. Implement on-demand interpretation services and train frontline staff on using it. 2024 2025 2026 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Revise the existing Historic Preservation Policy and create a Local Landmark Program. Analyze City's authority in declaring trees on private property as Landmark Trees. Include options in Urban Forestry Management Plan. 2024 2025 2026 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Produce a market analysis of ADUs in Bozeman to inform decisions. Discuss and implement policy around ADU incentives. 2024 2025 2026 408 Bozeman City Commission Two-Year Priorities List 4 Goal: Create an Affordable Housing Preservation Policy. Goal: Ramp up the SAFE Plan and become a Gold-level Bike Friendly Community. Sustainable Environment Goal: Create a Bozeman Creek Resiliency Plan. Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Identify opportunities for affordable housing preservation (mobile home parks, etc.). Explore an affordable housing preservation policy. 2024 2025 2026 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Continue work to improve bike safety throughout the community. Establish a community-wide education program for bike/ped safety. Resubmit for Gold-level status. 2024 2025 2026 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Jan-Mar Apr-Jun Jul-Sept Oct-Dec Create a project charter. Perform an analysis of Bozeman Creek's ability to handle a 100-year flood. Engage with community and educate around successes cleaning the creek. Conduct an engineering study of creek meander, braiding and re-routing options based on the results of the 100-year flood study. Conduct a study to identify areas where public interaction with Bozeman Creek can be enhanced through future parkland development.  Explore funding opportunities for potential improvements and changes. 2024 2025 2026 409 Memorandum REPORT TO:Urban Parks & Forestry Board FROM:Michael Stoerger, Admin. Asst. II Mitch Overton, Parks & Rec Director SUBJECT:Arbor Day 2025 Discussion MEETING DATE:January 23, 2025 AGENDA ITEM TYPE:Citizen Advisory Board/Commission RECOMMENDATION:N/A STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of an interconnected system of parks, trails and open spaces. BACKGROUND:N/A UNRESOLVED ISSUES:As suggested by the UPF Board ALTERNATIVES:As suggested by the UPF Board FISCAL EFFECTS:N/A Report compiled on: January 23, 2025 410