Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
028 Sht A103 NET AREA & PARKING BREAKDOWN
11146 SF Area H 8 E 6 C D B G 5 7421 A 3 F 2A3004A3001A3003A300E B5 AFLEX SPACE /OVERFLOW VIEWING CLASSROOMCLASSROOM OFFICEOFFICEOFFICE CLASSROOM COMMON / CORRIDOR OFFICECLASSROOM CHOIR / AUDIO /VIDEO 6824 SF Area Building Area Legend Gross Building Area STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2020 Springer Group Architects, P.C.8/27/2024 9:30:28 AM820 North 19th Avenue Bozeman, Montana08-01-2024 Author Checker 00-000 PROJECT STATUS A103Salvation Army Bozeman CorpsCommunity CenterNET AREA & PARKINGBREAKDOWN 1/16" = 1'-0"A103 1FIRST FLOOR NET AREA PLAN PLAN 1/16" = 1'-0"A10322ND FLOOR NET AREA PLAN Area Breakdown / Parking Calculation Total Area (6,260 + 4,312) ...............10,572 sq ftApplicable Area..................................10,572 sq ft Base Parking Requirement .......10,572/200 = 52.86 spaces`Qualifiying Deductions 38.540.050- A-2- c (1)..........................30% sub total (.70 x 52.86) = 37.0 spaces PARKING SPACES REQUIRED.......................37 SPACES MIN. BICYCLE SPACES REQUIRED 38.540.050- A-4- ..................................10% of 52.86 = 5.86 or 6Per 38.540.050- A-2-c-(6) Parking Reduction Requested............... 3 spacesParking Required after reducion............ 34 spaces PARKING SPACES PROVIDED.......................34 SPACES COMPACT SPACES @ .25 % .......................... 9 SPACES (ALLOWED)(9 PROVIDED) FIRST FLOOR NET PARKING AREA PLAN SECOND FLOOR NET PARKING AREA PLAN OPEN TO BELOW OPEN TO BELOW TABLE & CHAIR STORAGE MISC STORAGE REVISION SCHEDULENO:DESCRIPTION:DATE:BY: