Loading...
HomeMy WebLinkAbout011 Sht A102 Area breakdown2A3004A3003A30011483 SF Area G 8 E 6 C D B F 5 7421 A 3 2A3004A3001A3003A3009747 SF Area G 8 E 6 C D B F 5 7421 A 3FLEX SPACE /OVERFLOW VIEWINGCLASSROOMCLASSROOMOFFICE OFFICEOFFICE CLASSROOM COMMON / CORRIDOR OFFICECLASSROOM CHOIR / AUDIO /VIDEO STATUS: JOB NO.: CHECKED: DRAWN: Copyright © 2020 Springer Group Architects, P.C.5/17/2024 12:31:24 PM840 North 19th AvenueBozeman, Montana05-08-2024 Author Checker 00-000 PROJECT STATUS A102The Salvation ArmyBozeman CorpsCommunity CenterAREA BREAKDOWN 1/16" = 1'-0"A104RE: 2/ A300 1FIRST FLOOR GROSS AREA PLAN PLAN 1/16" = 1'-0"A104RE: 2/ A300 22ND FLOOR GROSS AREA PLAN Area Breakdown / Parking Calculation Total Area (6,260 + 4,312) ...............10,572 sq ftApplicable Area..................................10,572 sq ft Base Parking Requirement .......10,572/200 = 52.86 spaces`Qualifiying Deductions 38.540.050- A-2- c (1)..........................30% sub total (.70 x 52.86) = 37.0 spaces PARKING SPACES REQUIRED.......................37 SPACES PARKING SPACES PROVIDED.......................40 SPACES COMPACT SPACES @ .25 % .........................10 SPACES REVISION SCHEDULENO:DESCRIPTION:DATE: BY: FIRST FLOOR NET PARKING AREA PLAN SECOND FLOOR NET PARKING AREA PLAN OPEN TO BELOW OPEN TO BELOW TABLE & CHAIR STORAGE MISC STORAGE