Loading...
HomeMy WebLinkAbout020 A3.0 Building Sections#DATETITLE SHEET NUMBER DRAWING RELEASE 109 E. Oak St., Suite 1F Bozeman, MT • 59715-2962 (406) 624-0200• www.formescent.com CONSULTANTSDRAWN BY: JJM CHECKED BY: ABR THIS DRAWING IS AN INSTRUMENT OF SERVICE AND IS TO BE USED SOLELY FOR THE PURPOSES STIPULATD UNDER SEPARATE EXECUTED CONTRACTS WITH THE ARCHITECT. THIS DOCUMENT IS COPYRIGHTED AND IS NOT TO BE USED, DUPLICATED, OR OTHERWISE MODIFIED EXCEPT WITH EXPRESS PERMISSION OF THE ARCHITECTSCOPYRIGHT © 2023 FORMESCENT ARCHITECTS, PLLC ALL RIGHTS RESERVEDSEE COVER PAGE FOR ADDITIONAL CONTACT INFORMATION1 FOR STRUCTURAL BUILDING SECTIONS A3.0 03.25.2024 PUBLISH DATE: 8/28/2024 30x42 PROJECT No.: 23112BUFFALO RESTORATION ADDITIONPROJECT INFORMATIONBOZEMAN, MT 59715GALLATIN PARK SUBDIVISION555 MANLEY RDBLOCK 2 LOT 2-A2 CITY S.P. REVIEW 08.28.2024 12 1 E D C B A 12 3 112'-0" T.O. OVERHEAD DOOR 114'-6" T.O. EAVE 122'-0" T.O. WINDOW 133'-0" T.O. PARAPET 20'-0"RACKING4'-6"RACK TOPSTORAGE2'-0"CLR.FIRESUPPRES3'-0" METAL BLDG WALL ASSEMBLY METAL CLADDING BY BUILDING MANUFACTURER 8" GIRTS BY BUILDING MANUFACTURER w/ 3/16" THERMAL TAPE UNFACED UNCOMPRESSED FIBERGLASS INSULATION BTWN. GIRTS (WALL ASSEMBLY PRE-INSTALLED R-VALUE = R-32.4, ASSEMBLY R-VALUE = R-20.4) SIMPLE SAVER CONTINUOUS FABRIC LINER / VAPOR RETARDER CONC. FND. WALL ASSEMBLY 2" RIGID INSULATION Z-FLASHING @ INSUL. ABOVE GRADE CONC. WALL PER FOUNDATION PLAN FLOOR ASSEMBLY - TYP. 6" MIN. UNINSULATED CONC. SLAB SEE FOUNDATION PLAN STEEL FRAME PER BLDG. MFG. PARAPET WALL BEYOND SIDING FROM (E) EXT. WALL TO REMAIN 100'-6" T.O. CONC. WALL 128'-0" T.O. EAVE 1 2 3 4 5 ROOF ASSEMBLY 3" METAL DECKING BY BUILDING MANUFACTURER R-13 UNFACED FIBERGLASS INSUL. INSTALL PERP. TO (& ON TOP OF) PURLINS R-25 UNFACED UNCOMPRESSED FIBERGLASS INSUL. INSTALL PARALLEL (& BTWN.) PURLINS (ROOF ASSEMBLY R-VALUE = R-32.4) 8" PURLINS PER BUILDING MANUFACTURER SIMPLE SAVER FABRIC VAPOR RETARDER (CONT. BELOW PURLINS) / FALL PROTECTION SCALE: 1/2" = 1'-0" 1 BUILDING SECTION A A3.0