Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
003 1 Civil Cover Sheet
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS K:\Bozeman\Formescent Architects\2024261 Buffalo Restoration Site Plan\05CAD\Sheets\Site Plan.dwg Cover 10/22/2024 4:00:51 PMPROJECT LOCATION LOCATION MAP SITE PLAN FOR BUFFALO RESTORATION NO. DRAWING NO. REVISIONNO. PREPARED FOR: BY DATE 1 PREPARED BY: ENGINEERING DESIGNED BY: DRAWN BY: CHECKED BY: DATE: PCR PCR EWR 7/25/2024 106 EAST OAK ST STE 1F BOZEMAN, MT 59715 406-624-0200 PROJECT NO. 2024-261 FORMESCENT ARCHITECTS 0 SCALE: 1" = 1000' 1000'500' R5E T1SINDEX OF SHEETS SHEET NO.TITLE 1 2 3 4 COVER GENERAL NOTES EXISTING CONDITIONS SITE PLAN 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 5 DIMENSION PLAN I-90 GRIFFIN ST MAN L E Y R D N 7TH AVEBOZEMAN, MONTANA AUGUST 2024 Civil Engineering by: WWC ENGINEERING/MADISON 895 TECHNOLOGY BLVD, STE 203 BOZEMAN, MT 59718 (406) 586-0262 Architectural Design by: FORMESCENT ARCHITECTS 109 EAST OAK ST, STE 1F BOZEMAN, MT 59715 (406) 624-0200 Applicant: FORMESCENT ARCHITECTS 109 EAST OAK ST, STE 1F BOZEMAN, MT 59715 (406) 624-0200 6 GRADING & DRAINAGE PLAN7 DETAILS Owner: BUFFALO RESTORATION 555 MANLEY RD BOZEMAN, MT 59715 (406) 586-8109 PROJECT:SITE PLAN FOR BUFFALO RESTORATION LEGAL DESC.:GALLATIN PARK SUB, S36, T01, R05E, BLOCK 2, LOT 2-A ADDRESS:555 MANLEY RD, BOZEMAN, MT 59715 ZONING:M-1 SITE AREA:OVERALL LOT AREA:83,199 SF (1.91 AC) IMPERVIOUS AREA:57,260 SF BLDG AREA 9,191 SF LANDSCAPED AREA/UNDEVELOPED:16,748 SF PROPOSED FLEET LOT AREA:20,431 SF (0.67 AC) LANDSCAPED AREA/UNDEVELOPED:16,748 SF FLOOR AREA:EXISTING BUILDING:6,953 SF NEW BUILDING:2,238 SF TOTAL BLDG SF ON SITE =9,191 SF BLOCK FRONTAGE:OTHER SURFACE WATER:NO SURFACE WATER ON SITE FLOOD PLAIN:PER FEMA MAP THERE IS NO REGULATORY FLOODPLAIN ON THIS PROPERTY SITE LIGHTING:EXISTING SITE LIGHTING TO REMAIN. SNOW STORAGE:AS SHOWN ON SITE PLAN PAYBACK DISTRICTS:NO PAYBACK DISTRICTS ARE SHOWN ON THE CITY'S WEBSITE. CASH IN LIEU OF WATER RIGHTS:NO CASH IN LIEU OF WATER RIGHTS REQUIRED. PARKING: FLOOR AREA:9,191 SF X 0.85 = 7,812 SF EMPLOYEES:36 EMPLOYEES - MAX SHIFT PARKING REQ'D: FLOOR AREA:8 SPACES (1 SPACE/1,000 SF) EMPLOYEES:18 SPACES (1 SPACE/2 EMPLOYEES) TOTAL REQ'D:26 SPACES MAX PARKING (125%):32 SPACES PARKING PROVIDED:30 EXISTING SPACES ACCESSIBLE PARKING: 2 EXISTING SPACES (VAN ACCESSIBLE) PROPOSED ADDITIONAL PARKING LOT FOR FLEET PARKING ONLY STORM WATER RETENTION/DETENTION: DETENTION POND AND AREA DRAIN AS REQUIRED IN THE STORM WATER REPORT. THE EXISTING STORM WATER REPORT IS NOT AFFECTED BY THIS ADDITION SOLID WASTE:DUMPSTER AREA SHOWN ON SITE PLAN OPEN SPACE REQ'D: 580 SF OPEN SPACE PROVIDED 1,870 SF (322%) 8 DETAILS9 CONSTRUCTION MANAGEMENT PLAN 1.REVISED PER CITY REVIEW PCR 10/21/24