Loading...
HomeMy WebLinkAboutGriffin_Drive and Manley Road Street and Stormwater Improvements_022724PROJECT NO:CONFORMS TO CONSTRUCTION RECORDS19078.01VICINITY MAPSITECITY OF BOZEMANBOZEMAN, MT 5971520 EAST OLIVEBOZEMAN, MONTANAPREPARED FOR:GRIFFIN DRIVE AND MANLEY ROADSTREET AND STORMWATER IMPROVEMENTS106 East BabcockBozeman, Montana 59715406.522.9876sandersonstewart.comNORTHSheet List TableSHEETTITLEC1.1COVER SHEETC2.1LEGEND AND ABBREVIATIONSC3.1 - C3.5EXISTING CONDITIONS AND DEMOLITION PLANC4.1 - C4.3OVERALL SITE PLANC5.1 - C5.4W GRIFFIN DRIVE PLAN AND PROFILE STA. 220+00 TO STA. 236+00C5.5 - C5.8E GRIFFIN DRIVE PLAN AND PROFILE STA. 236+00 TO STA. 252+00C5.9MANLEY ROAD PLAN AND PROFILE STA. 0+00 TO STA. 23+00C6.1 - C6.3STORM DRAIN PLAN AND PROFILE STA. 10+00 TO STA. 12+00C6.4STORM DRAIN PLAN AND PROFILE STA. 232+96.75 CULVERTC6.5 - C6.8STORM DRAIN PLAN AND PROFILE STA. 30+00 TO STA. 56+40C7.1SANITARY SEWER PLAN AND PROFILEC8.1MANLEY DRIVE WATER PLAN AND PROFILEC8.2NEW WATER SERVICES PLAN AND PROFILEC8.3FIRE HYDRANT RELOCATION PLANSC9.1 - C9.14W GRIFFIN DRIVE INTERSECTION GRADINGC9.15 - C9.29E GRIFFIN DRIVE INTERSECTION GRADINGC10.1TYPICAL STREET SECTIONSC10.2TYPICAL STREET SECTIONSC10.3TYPICAL STREET SECTION AND DETAILSC10.4 - C10.12DETAILSC11.1 - C11.7GRIFFIN DRIVE CROSS SECTIONSS1.7SIGNAGE & STRIPING DETAILSE1.1POLE SCHEDULEE1.2 - E1.6ELECTRICAL LIGHTING PLANSE1.7SIGNAL PLANE1.8CONTROLLER SETTINGSE1.9WIRING DIAGRAME1.10WIRING DIAGRAME1.11 - E1.20ELECTRICAL DETAILSS1.1SIGNAGE & STRIPING W GRIFFIN DRIVE STA. 220+00 TO STA. 225+00S1.2SIGNAGE & STRIPING W GRIFFIN DRIVE STA. 226+00 TO STA. 233+00S1.3SIGNAGE & STRIPING W_E GRIFFIN DRIVE STA. 234+00 TO STA. 241+00S1.4SIGNAGE & STRIPING E GRIFFIN DRIVE STA. 242+00 TO STA. 249+00S1.5SIGNAGE & STRIPING E GRIFFIN DRIVE AND MANLEY ROADS1.6SIGNAGE & STRIPING W GRIFFIN DRIVE AND EVERGREEN DRIVEPDF Sheet Number123-78-1011-1415-181920-222324-272829303132-4546-6061626364-7475-81888990-949596979899-108828384858687LP1.1 - LP1.4LIGHTING POLE LOCATIONS109-112 ELECTRIC JUNCTION BOXSIGNPOWER POLEBOLLARDBUSHFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALSIGNAL POLETELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALDEMO AREAEW = FINISHED GRADE AT EDGE OF WALKTC = FINISHED GRADE AT TOP BACK OF CURBBC = FINISHED GRADE AT BUILDING CORNERTW = FINISHED GRADE AT TOP OF WALLAC = FINISHED GRADE AT ASPHALTEA = FINISHED GRADE AT EDGE OF ASPHALTEC = FINISHED GRADE AT EDGE OF CONCRETESDI = STORM DRAIN INLETSDMH = STORM DRAIN MANHOLEFL = FINISHED GRADE AT FLOWLINEFG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATIONPOC = POINT ON CURVEGAS WELLFOUND CORNER MONUMENT AS NOTEDSET CORNER MONUMENT, REBAR WITH CAPBENCHMARKSECTION QUARTER CORNERSECTION CORNERWTR = WATERPI = POINT OF INTERSECTIONPRC = POINT OF REVERSE CURVERT = RIGHTLT = LEFTSS = SANITARY SEWERPT = POINT OF TANGENCYSD = STORM DRAINGV = GATE VALVEBFV = BUTTERFLY VALVERED = REDUCERLF = LINEAL FOOTFT = FEETSSMH = SANITARY SEWER MANHOLEBVC = BEGIN VERTICAL CURVECS = CURB STOPEVC = END VERTICAL CURVEPVI = POINT OF VERTICAL INTERSECTIONLINETYPESABBREVIATIONSSYMBOLSKEYNOTE CALL OUT(SEE KEYNOTE LEGEND)CONFORMS TO CONSTRUCTION RECORDSSRVC = SERVICE(TYP.) = TYPICALPC = POINT OF CURVATUREEXISTING MONUMENT BOXPROPOSED MONUMENT BOXNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN AREINDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION.SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAWREQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATIONFOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANAPUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THECITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITHADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALLBE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSEDIN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF ORENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEINGPERFORMED.GR = EXISTING GRADE AT GROUNDBRK = GRADE BREAKFIBER OPTICGAS PIPELINEOIL PIPELINEUNDERGROUND POWERSANITARY SEWERSTORM DRAINTELEPHONETELEVISION/CABLEWATERCONTOUROVERHEAD POWERFENCE - VINYLFENCE - BARBWIREFENCE - WOODCURB AND GUTTEREDGE OF ASPHALTEDGE OF GRAVELFENCE - CHAINLINK/WOVEN WIREEXISTINGPROPOSEDHP = HIGH POINTFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C2.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD LEGEND AND ABBREVIATIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_COVER.DWG -W S = WATER SERVICESS S = SANITARY SEWER SERVICE(BH-1) BOREHOLE(PH-1) UTILITY POTHOLEEXISTING STORM DRAIN MANHOLEEXISTING CATCH BASINEXISTING WATER VALVEEXISTING FIRE HYDRANTEXISTING CURB STOPFIRE DEPT. CONNECTIONROOF DRAINEXISTING SANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXWELLYARD HYDRANTEXISTING WATER REDUCERPROPOSED CATCH BASINPROPOSED WATER REDUCERPROPOSED WATER VALVEPROPOSED FIRE HYDRANTPROPOSED CURB STOPPROPOSED SANITARY SEWER MANHOLEPROPOSED STORM DRAIN MANHOLEEXISTING WETLANDSPROPOSED AREA CATCH BASINPROPOSED CURB CUTEXISTING PROPERTYBOUNDARYEXISTING EASEMENTPROPOSED TEMPORARYCONSTRUCTION PERMITPROPOSED EASEMENT -REMOVE EX ASPHALT, GRAVEL, CURB & GUTTER,CONCRETE AND/OR SIDEWALK WITHIN BOUNDARY AREA.SEE SITE LAYOUT FOR MORE DETAIL OF PROPOSEDIMPROVEMENTS IN THESE AREAS AND EXTENTS OFDEMOLITION.EXISTING WETLAND(NON JURISDICTIONAL)NORTHCONFORMS TO CONSTRUCTION RECORDS2502550SCALE: 1" = 50'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C3.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD EXISTING CONDITIONS AND DEMOLITION PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_EXISTING_PROD.DWG - ℄ MONTANA RAILINK ROW-REMOVE EX ASPHALT, GRAVEL, CURB & GUTTER,CONCRETE AND/OR SIDEWALK WITHIN BOUNDARY AREA.SEE SITE LAYOUT FOR MORE DETAIL OF PROPOSEDIMPROVEMENTS IN THESE AREAS AND EXTENTS OFDEMOLITION.NORTHCONFORMS TO CONSTRUCTION RECORDS2502550SCALE:1:50_XREFFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C3.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD EXISTING CONDITIONS AND DEMOLITION PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_EXISTING_PROD.DWG - ℄ MONTANA RAILINK ROWEX 10" WATER MAIN TO BEABANDONED IN PLACE FROM THE90° BEND IN MANLEY ROAD TOTHE TEE IN GRIFFIN DRIVE. SEEPLAN AND PROFILE SHEET C8.1-REMOVE EX ASPHALT, GRAVEL, CURB & GUTTER,CONCRETE AND/OR SIDEWALK WITHIN BOUNDARY AREA.SEE SITE LAYOUT FOR MORE DETAIL OF PROPOSEDIMPROVEMENTS IN THESE AREAS AND EXTENTS OFDEMOLITION.NORTHCONFORMS TO CONSTRUCTION RECORDS2502550SCALE:1:50_XREFFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C3.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD EXISTING CONDITIONS AND DEMOLITION PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_EXISTING_PROD.DWG - -REMOVE EX ASPHALT, GRAVEL, CURB & GUTTER,CONCRETE AND/OR SIDEWALK WITHIN BOUNDARY AREA.SEE SITE LAYOUT FOR MORE DETAIL OF PROPOSEDIMPROVEMENTS IN THESE AREAS AND EXTENTS OFDEMOLITION.REMOVE AND REPLACE EXISTING ASPHALTFOR NEW STORM DRAIN TRENCH AND PIPENORTHCONFORMS TO CONSTRUCTION RECORDS2502550SCALE:1:50_XREFFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C3.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD EXISTING CONDITIONS AND DEMOLITION PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_EXISTING_PROD.DWG - REMOVE EXISTINGSIDEWALK-REMOVE EX ASPHALT, GRAVEL, CURB & GUTTER,CONCRETE AND/OR SIDEWALK WITHIN BOUNDARY AREA.SEE SITE LAYOUT FOR MORE DETAIL OF PROPOSEDIMPROVEMENTS IN THESE AREAS AND EXTENTS OFDEMOLITION.OBLITERATE EXISTING PAVEMENTMARKINGS AT INTERSECTIONNORTHCONFORMS TO CONSTRUCTION RECORDS2502550SCALE:1:50_XREFFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C3.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD EXISTING CONDITIONS AND DEMOLITION PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_EXISTING_PROD.DWG - PROPOSED SITE PLANIMPROVEMENTSPROJECT SURVEY CONTROLPoint #201202203204205206207208209210211212214215216217218221224230233234236238326Northing (IFT)532582.57532622.64532900.97532960.86533060.33533076.38533169.96533256.14533234.18533150.11533428.46532606.01532582.26532597.67532514.32532724.63532703.82532719.55532554.37532134.30532838.02532607.48533585.00533473.96532612.47Easting (IFT)1574922.771575810.891575812.001575812.341575812.721575812.411575796.151575755.911575868.371574925.881575869.381576685.441577337.651577384.661577331.011577637.891577609.751577629.791577725.521576885.041576816.421575325.611574928.121576149.291574922.98Elevation (USSF)4722.754724.304717.004715.734714.024713.824712.814711.514713.304712.244706.734716.354716.514716.834717.844712.674712.074713.004716.284722.794712.074725.174705.234704.714722.09DescriptionSECFPC / FND5/8"YCR15273SSPC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND5/8"YCR15273SSPC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND5/8"YCRPC / FND2DIA. IPPC / FND5/8"YCR5606GASTONWC / FND 5/8"YCR3498SURVCOPC /BCR MORRISON MAIERLE 10062 LSPC / FND5/8"YCR9518C&HPC /BCR MORRISON MAIERLE 10062 LSPC / FND5/8"YCR5606GASTONPC / FND5/8"YCR9518C&HWC / FND1.5"ACR10FT9518C&HPC / FND 2"ACR RM106ANDERSON9692ES DNRC2004PC / FND2.5"BC1970JHCHARLES R.SWART RLSPC / FND2" ACR ALLIED ENGINEERING FINCK 13174LSWC / FND5/8"OCR BENT ILLEGIBLE OBS. AT BENDPC / FND5/8"YCR3496SURVCOPC / FND5/8"YCRMORRISON&MAIERLEPPFNORTHCONFORMS TO CONSTRUCTION RECORDS4004080SCALE: 1" = 80'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C4.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD OVERALL SITE PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_OVERALL_PROD.DWG -GRID STATE PLANE COORDINATES:THIS IS A STATE PLANE COORDINATE PROJECT. ALL DIMENSIONS,DISTANCES AND AREAS ON THIS PROJECT ARE GRID, EXCEPT R/WWIDTH DIMENSION, WHICH IS RECORD.THE COMBINATION SCALE FACTOR IS 0.99942766 NORTH BUILDING26,700 SF FOOTPRINT202 E. GRIFFIN DR.PROPOSED HRDCIMPROVEMENTSSTORM WATERRETENTION AREAPROJECT SURVEY CONTROLPoint #201202203204205206207208209210211212214215216217218221224230233234236238326Northing (IFT)532582.57532622.64532900.97532960.86533060.33533076.38533169.96533256.14533234.18533150.11533428.46532606.01532582.26532597.67532514.32532724.63532703.82532719.55532554.37532134.30532838.02532607.48533585.00533473.96532612.47Easting (IFT)1574922.771575810.891575812.001575812.341575812.721575812.411575796.151575755.911575868.371574925.881575869.381576685.441577337.651577384.661577331.011577637.891577609.751577629.791577725.521576885.041576816.421575325.611574928.121576149.291574922.98Elevation (USSF)4722.754724.304717.004715.734714.024713.824712.814711.514713.304712.244706.734716.354716.514716.834717.844712.674712.074713.004716.284722.794712.074725.174705.234704.714722.09DescriptionSECFPC / FND5/8"YCR15273SSPC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND5/8"YCR15273SSPC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND5/8"YCRPC / FND2DIA. IPPC / FND5/8"YCR5606GASTONWC / FND 5/8"YCR3498SURVCOPC /BCR MORRISON MAIERLE 10062 LSPC / FND5/8"YCR9518C&HPC /BCR MORRISON MAIERLE 10062 LSPC / FND5/8"YCR5606GASTONPC / FND5/8"YCR9518C&HWC / FND1.5"ACR10FT9518C&HPC / FND 2"ACR RM106ANDERSON9692ES DNRC2004PC / FND2.5"BC1970JHCHARLES R.SWART RLSPC / FND2" ACR ALLIED ENGINEERING FINCK 13174LSWC / FND5/8"OCR BENT ILLEGIBLE OBS. AT BENDPC / FND5/8"YCR3496SURVCOPC / FND5/8"YCRMORRISON&MAIERLEPPFNORTHCONFORMS TO CONSTRUCTION RECORDS4004080SCALE: 1" = 80'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C4.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD OVERALL SITE PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_OVERALL_PROD.DWG -GRID STATE PLANE COORDINATES:THIS IS A STATE PLANE COORDINATE PROJECT. ALL DIMENSIONS,DISTANCES AND AREAS ON THIS PROJECT ARE GRID, EXCEPT R/WWIDTH DIMENSION, WHICH IS RECORD.THE COMBINATION SCALE FACTOR IS 0.99942766 PROJECT SURVEY CONTROLPoint #201202203204205206207208209210211212214215216217218221224230233234236238326Northing (IFT)532582.57532622.64532900.97532960.86533060.33533076.38533169.96533256.14533234.18533150.11533428.46532606.01532582.26532597.67532514.32532724.63532703.82532719.55532554.37532134.30532838.02532607.48533585.00533473.96532612.47Easting (IFT)1574922.771575810.891575812.001575812.341575812.721575812.411575796.151575755.911575868.371574925.881575869.381576685.441577337.651577384.661577331.011577637.891577609.751577629.791577725.521576885.041576816.421575325.611574928.121576149.291574922.98Elevation (USSF)4722.754724.304717.004715.734714.024713.824712.814711.514713.304712.244706.734716.354716.514716.834717.844712.674712.074713.004716.284722.794712.074725.174705.234704.714722.09DescriptionSECFPC / FND5/8"YCR15273SSPC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND5/8"YCR15273SSPC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND2"ACR14535ALPINE2018PC / FND5/8"YCRPC / FND2DIA. IPPC / FND5/8"YCR5606GASTONWC / FND 5/8"YCR3498SURVCOPC /BCR MORRISON MAIERLE 10062 LSPC / FND5/8"YCR9518C&HPC /BCR MORRISON MAIERLE 10062 LSPC / FND5/8"YCR5606GASTONPC / FND5/8"YCR9518C&HWC / FND1.5"ACR10FT9518C&HPC / FND 2"ACR RM106ANDERSON9692ES DNRC2004PC / FND2.5"BC1970JHCHARLES R.SWART RLSPC / FND2" ACR ALLIED ENGINEERING FINCK 13174LSWC / FND5/8"OCR BENT ILLEGIBLE OBS. AT BENDPC / FND5/8"YCR3496SURVCOPC / FND5/8"YCRMORRISON&MAIERLEPPFCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C4.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD OVERALL SITE PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_OVERALL_PROD.DWG -NORTH4004080SCALE: 1" = 80'GRID STATE PLANE COORDINATES:THIS IS A STATE PLANE COORDINATE PROJECT. ALL DIMENSIONS,DISTANCES AND AREAS ON THIS PROJECT ARE GRID, EXCEPT R/WWIDTH DIMENSION, WHICH IS RECORD.THE COMBINATION SCALE FACTOR IS 0.99942766 NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE PLAN AND PROFILE STA. 220+00 TO STA. 222+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG - NORTHCONFORMS TO CONSTRUCTION RECORDS VERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE PLAN AND PROFILE STA. 222+00 TO STA. 227+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG - PROPOSED SITE PLANIMPROVEMENTSNORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE PLAN AND PROFILE STA. 227+00 TO STA. 231+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG - NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE PLAN AND PROFILE STA. 231+00 TO STA. 236+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG - PROPOSED HRDC SITE PLANIMPROVEMENTSNORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE PLAN AND PROFILE STA. 236+00 TO STA. 240+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDS VERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE PLAN AND PROFILE STA. 240+00 TO STA. 245+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDS VERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE PLAN AND PROFILE STA. 245+00 TO STA. 249+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDS VERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.8BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE PLAN AND PROFILE STA. 249+00 TO STA. 252+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_GRIFFIN_A.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C5.9BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD MANLEY ROAD PLAN AND PROFILE STA. 0+00 TO STA. 4+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_MANLEY RD_PROD.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 219+50 TO STA. 222+50 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG - NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 222+30 TO STA. 226+25 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG - NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 226+10 TO STA. 230+50 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG - NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 230+50 TO STA. 235+40 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG - NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 235+40 TO STA. 239+75 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 239+40 TO STA. 244+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 244+25 TO STA. 249+45 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDS VERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C6.8BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD STORM DRAIN PLAN AND PROFILE STA. 248+50 TO STA. 252+15 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_STORM.DWG -2002040HORIZONTAL SCALE: 1" = 40' NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C7.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SANITARY SEWER PLAN AND PROFILE 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_SEWER.DWG -NOTE:-EXISTING UNDERGROUNDINSTALLATIONS & PRIVATEUTILITIES SHOWN AREINDICATED ACCORDING TOTHE BEST INFORMATIONAVAILABLE TO THEENGINEER. THE ENGINEERDOES NOT GUARANTEE THEACCURACY OF SUCHINFORMATION. SERVICELINES (WATER, POWER, GAS,STORM, SEWER, TELEPHONE& TELEVISION) MAY NOT BESTRAIGHT LINES OR ASINDICATED ON THE PLANS.STATE LAW REQUIRESCONTRACTOR TO CALL ALLUTILITY COMPANIES BEFOREEXCAVATION FOR EXACTLOCATIONS.-ALL IMPROVEMENTS SHALLBE PERFORMED INACCORDANCE WITHMONTANA PUBLIC WORKSSTANDARD SPECIFICATIONS6TH EDITION, APRIL, 2010,AND THE CITY OF BOZEMANSTANDARD MODIFICATIONS,DATED MARCH 31,2011,INCLUDING ALL ADDENDUM.-UNLESS OTHERWISESPECIFIED, ALLCONSTRUCTION LAYOUT ANDSTAKING SHALL BEPERFORMED UNDER THERESPONSIBLE CHARGE OF ALAND SURVEYOR LICENSED INTHE STATE OF MONTANA ANDBY A PARTY CHIEF ORENGINEERING TECHNICIANEXPERIENCED INCONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES ASARE REQUIRED BY THESPECIFIC TYPE OF WORKBEING PERFORMED. NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C8.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD MANLEY DRIVE WATER PLAN AND PROFILE 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_WATER.DWG -NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIESSHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATIONAVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEETHE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER,POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOTBE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAWREQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFOREEXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITHMONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION,APRIL, 2010, AND THE CITY OF BOZEMAN STANDARDMODIFICATIONS, DATED MARCH 31,2011, INCLUDING ALLADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT ANDSTAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGEOF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BYA PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED INCONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS AREREQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.˚ NORTHCONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C8.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD NEW WATER SERVICES PLAN AND PROFILE 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_WATER.DWG -NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCHINFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIESBEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31,2011,INCLUDING ALL ADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERINGTECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C8.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD FIRE HYDRANT RELOCATION PLANS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_PNP_WATER.DWG -1501530SCALE: 1" = 30'NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATEDACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEERDOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER,POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES ORAS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLICWORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMANSTANDARD MODIFICATIONS, DATED MARCH 31,2011, INCLUDING ALL ADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BEPERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THESTATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED INCONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFICTYPE OF WORK BEING PERFORMED. NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.8BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.9BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.10BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.11BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.12BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.13BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_A.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.14BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD W GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.15BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.16BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.17BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.18BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.19BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.20BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.21BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.22BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.23BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.24BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.25BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.26BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.27BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.28BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.29BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.30BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C9.31BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD E GRIFFIN DRIVE INTERSECTION GRADING 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_GRADING_PROD_B.DWG -50510HORIZONTAL SCALE: 1" = 10' CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD TYPICAL STREET SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -TYPICAL GRIFFIN DRIVE STREET SECTIONTYPICAL GRIFFIN DRIVE STREET SECTIONTYPICAL GRIFFIN DRIVE STREET SECTION CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD TYPICAL STREET SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -TYPICAL GRIFFIN DRIVE STREET SECTIONTYPICAL GRIFFIN DRIVE STREET SECTIONTYPICAL GRIFFIN DRIVE RAILROAD STREET SECTION CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD TYPICAL STREET SECTION AND DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -TYPICAL MANLEY ROAD STREET SECTIONTYPICAL GRIFFIN DRIVE STREET SECTIONFULL DEPTH EXPANSION JOINTTYPICAL GRIFFIN DRIVE STREET SECTION CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -CAPPING DETAIL-PROFILESTEP AT TOP OF WALLNOT TO SCALESTEPPING BASE DETAILNOT TO SCALEVERT. SCALE: 1" = 10'TYPICAL 42-INCH PEDESTRIAN RAILING DETAILVERSA-LOK RETAINING WALL SECTION CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -VERT. SCALE: 1" = 10'VERT. SCALE: 1" = 10'VERSA-LOK RETAINING WALL SECTION VERT. SCALE: 1" = 10'VERT. SCALE: 1" = 10'RETAINING WALL PROFILE STA. 248+96.01 TO 249+47.63RETAINING WALL PROFILE STA. 247+97.12 TO 248+51.01RETAINING WALL PROFILE STA. 249+99.63 TO 251+25.73 CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -VERT. SCALE: 1" = 10'VERSA-LOK RETAINING WALL SECTION CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -MDT TYPE "A" MEDIAN CURBMDT 3" CONCRETE MEDIAN CAPFLEXIBLE SURFACE-MOUNT DELINEATORS CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.8BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -CURB CUT INLET DETAILSWALE DRAIN PAD DETAILAACCB B A AB B CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.9BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -SLOTTED DRYWELL MANHOLE DETAIL OUTFLOW RIP-RAP DETAILSTORM DRAIN OUTLET STRUCTURE DETAIL TYPICAL GRIFFIN DRIVE GAS MAIN SECTION WITH FLOWABLE FILL CAP CURB RAMP FOR PRIVATE APPROAH OR SIDE STREETS WITH CURBRETURNS BUT WITHOUT SIDEWALKREFER TO MONTANA DEPARTMENT OF TRANSPORTATION DETAIL NO. 608-35 AND NO. 609-05AACONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.10BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -STORM DRAIN AREA INLET DETAIL CHAMBER #1 ADS STORMTECH SC-160LP STORAGE CROSS-SECTIONSECTION A-ASECTION B-BUNDERDRAIN DETAILCHAMBER #1 ADS STORMTECH SC-160LP STORAGE PLANAABBCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.11BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -CHAMBER #2 ADS STORMTECH SC-310 STORAGE CROSS-SECTIONCHAMBER #2 ADS STORMTECH SC-310 STORAGE PLANCATCH BASINORMANHOLEISOLATOR ROW PLUS DETAIL CHAMBER #3 ADS STORMTECH SC-740 STORAGE PLANCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C10.12BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_DETAILS.DWG -CHAMBER #3 ADS STORMTECH SC-740 STORAGE CROSS-SECTION CONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD GRIFFIN DRIVE CROSS SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -2002040HORIZONTAL SCALE: 1" = 40' CONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD GRIFFIN DRIVE CROSS SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -2002040HORIZONTAL SCALE: 1" = 40' CONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD GRIFFIN DRIVE CROSS SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -2002040HORIZONTAL SCALE: 1" = 40' CONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD GRIFFIN DRIVE CROSS SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -2002040HORIZONTAL SCALE: 1" = 40' CONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD GRIFFIN DRIVE CROSS SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -2002040HORIZONTAL SCALE: 1" = 40' CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD GRIFFIN DRIVE VOLUME TABLE 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -VERTICAL SCALE: 1"=10'2002040HORIZONTAL SCALE: 1" = 40' CONFORMS TO CONSTRUCTION RECORDSVERTICAL SCALE: 1"=10'FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION C11.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD MANLEY ROAD CROSS SECTIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_X-SEC_PRO.DWG -2002040HORIZONTAL SCALE: 1" = 40' USE AS ISEX. D3-1 (4)EX. R1-1CENTERLANE ONLY ENDNEWR3-9K24"x42"CENTERLANEONLYBEGINNEWR3-9J24"x42"NEWW9-X18"x18"NEWR4-1130"x30"NEWD3-1 (2)30"x10"D3-1 (2)42"x10"R1-136"x36"REMOVEEX. D3-1 (4)EX. R1-1USE AS ISR2-1REMOVEEX. D3-1 (4)EX. R1-1NEWD3-1 (2)42"x10"D3-1 (2)42"x10"R1-136"x36"GilkersonDRGriffinWDRLeaAVELeaAVEGriffinWDRGriffinW DRGriffinWDRGilkerson DR CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING W GRIFFIN DRIVE STA. 220+00 TO STA. 225+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30' RESET EX. FIBEROPTIC LINE MARKERSBY OTHERSRESET EX. GASLINE MARKERSBY OTHERSRESET EX. GASLINE MARKERSBY OTHERSRESET EX. FIBEROPTIC LINE MARKERSBY OTHERSREMOVEEX. W10-1NEWR3-9K24"x42"NEWW10-136" DIA.CENTERLANEONLYENDCENTERLANE ONLY BEGINNEWR3-9J24"x42"NEWW10-124" DIA.RRNEWW10-124" DIA.R RNEWR1-136"x36"D3-1 (2)42"x10"D3-1 (2)42"x10"NEWR4-724"x30"NEWW10-124" DIA.NEWR8-824"x30"POLEREMOVEEX. D3-1 (4)RRDREvergreenDREvergreen RRGriffinWDRGriffinWDRNEWR15-818"X9"NEWR15-818"X9"NEWR15-818"X9"CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING W GRIFFIN DRIVE STA. 226+00 TO STA. 233+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30' NEWW10-124" DIA.NEWW10-136" DIA.NEWR4-724"x30"ONLYNEWR3-5L (OH)30"x36"REMOVEEX. W10-1NEWOHDR3-1 (OH)RDManley NEWR3-5R (OH)30"x36"ONLY REMOVEEX. D3-1 (4)EX. R1-1NEWOHDR3-1 (OH)ONLYONLYNEWR3-5R (OH)30"x36"NEWR3-5L (OH)30"x36"GriffinDRWNEWOHDR3-1 (OH)DREGriffinNEW R4-7 24"x30" R R R R RDManleyNEWR15-818"X9"NEWR3-9K24"x42"CENTERLANE ONLY ENDCENTERLANEONLYBEGINNEWR3-9J24"x42"NEWR3-7R30"x30"RIGHT LANEMUSTTURN RIGHT NEWPOSTCITY-1FUTURENEWPOSTCITY-1FUTURECONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING W_E GRIFFIN DRIVE STA. 234+00 TO STA. 241+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -NORTH1501530SCALE: 1" = 30'1501530SCALE: 1" = 30'NORTH IndustrialNEWW14-1A36"x8"D3-1 (2)42"x10"D3-1 (2)42"x10"R1-136"x36"REMOVEW14-1A (2)EX. D3-1 (4)EX. R1-1DRNO OUTLETNO OUTLETGriffinWDRGriffinWDRIndustrialDRREMOVEEX. SIGNRESETM1-5M6-4RS-128M6-1RREMOVEEX. R2-1REMOVEEX. R3-7RNEWR3-9K24"x42"CENTERLANEONLYENDNEWD3-1 (2)42"x10"D3-1 (2)42"x10"R1-136"x36"RouseAVENRouse AVEN CENTERLANE ONLY BEGIN NEWR3-9J24"x42"GriffinWDRGriffinWDRCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING E GRIFFIN DRIVE STA. 242+00 TO STA. 249+00 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30' RESETM1-5M6-4RS-128M6-1R35 SPEEDLIMIT NEWR2-124"x30"REMOVEEX. R2-1REMOVEEX. R3-7RNEWR3-9K24"x42"CENTERLANEONLYENDNEWD3-1 (2)42"x10"D3-1 (2)42"x10"R1-136"x36"RouseAVENRouse AVEN CENTERLANEONLYBEGINNEWR3-9J24"x42"GriffinWDRGriffinWDRREMOVEEX. D3-1 (4)EX. R1-1NEWR2-124"x30"35SPEEDLIMITONLYNEWR3-5L (OH)30"x36"RDManleyNEWR3-5R (OH)30"x36"ONLYREMOVEEX. R2-1EX. R3-17NEWOHDR3-1 (OH)ONLY ONLYNEWR3-5R (OH)30"x36"NEWR3-5L (OH)30"x36"Griffin DRWNEWOHDR3-1 (OH)DREGriffin NEWR4-724"x30"RDManleyREMOVEEX. R4-7CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING E GRIFFIN DRIVE AND MANLEY ROAD 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30' NEWW10-136" DIA.CENTERLANEONLYBEGINR3-9J24"x42"NEWR1-136"x36"D3-1 (2)42"x10"D3-1 (2)42"x10"NEWR4-724"x30"NEWW10-124" DIA.REMOVEEX. R1-1REMOVEEX. D3-1 (4)RRDREvergreenDREvergreenRRGriffinWDRGriffinW DR NEWR15-818"X9"CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING W GRIFFIN DRIVE AND EVERGREEN DRIVE 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -NORTH1501530SCALE: 1"=30' CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION S1.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAGE & STRIPING DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_SIGNAGE_PROD.DWG -CROSSWALKCROSSWALKCROSSWALKYELLOWCURB EPOXYDIRECTION OF TRAVELDIRECTION OF TRAVEL FIRE HYDRANTPRIVATEAPPROACH20ft 20ft 30ft 20 ft., (30ft) WHENAPPROACHING A STOPSIGN OR SIGNAL20ft15ft15ft10ft10ft CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD POLE SCHEDULE 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - 13218CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL LIGHTING PLANS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30'ABDBDACONDUIT & WIRESCHEDULEACBDAACBFCCONDUIT & WIRESCHEDULEABDDF 456197CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL LIGHTING PLANS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -NORTH1501530SCALE: 1"=30'NORTH1501530SCALE: 1"=30'CBCBADADBAAADCONDUIT & WIRESCHEDULEABCDCONDUIT & WIRESCHEDULEABCD 89332628293132172730232010211122CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL LIGHTING PLANS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30'CBBCCAACBCBAAAADADACACECCONDUIT & WIRESCHEDULEABCDECONDUIT & WIRESCHEDULEABC 122413251415CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.5BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL LIGHTING PLANS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -NORTH1501530NORTH1501530SCALE: 1"=30'SCALE: 1"=30'CABDCABABBBBAAACONDUIT & WIRESCHEDULEABCDCONDUIT & WIRESCHEDULEABC 169332627282930173233CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.6BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL LIGHTING PLANS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30'CONDUIT & WIRESCHEDULEAACONDUIT & WIRESCHEDULEAA 89332628293132172730CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.7BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD SIGNAL PLAN 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -812345769101112131420NORTH10010SCALE: 1" = 20'JJHCGFCCCCBDACE NORTHCONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.8BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD CONTROLLER SETTINGS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - MANLEY RDW GRIFFIN DRE GRIFFIN DR4526MAX GREENTime of Day (TOD)TIMING PLAN 1MAX GREENTime of Day (TOD)TIMING PLAN 2WEEKLY PROGRAMThuFriSatWedSunMonTueOVERLAP DEFINITIONSOLB = 5 + 4 - 4POLC = 7 + 6 - 6PPREEMPTIONPlanCalls ØOutput123456789101112MovementExtendDelayController SettingsDETECTOR TABLE**Phase Called (Call/Call Locking/Extend)BASIC INTERVALSPhase12345678LagMax 1Max 2Time BeforeTime to ReduceMinimum GapYellowAll RedPed ClearanceMin Green10.010.05.010.0Movement-EBSBEBLWBExtension2.02.02.02.0Walk7.0RecallSOFTSOFTProg Flash DisplayYRRYStart Up Ø XTiming Plan21111123 & 84 & 75 & 21 & 6CH13RCH14RCH15RCH16R06301900MAX 1MAX 2MAX 2MAX 10900170032.432.43.623.02.0NONE2.03.611.48.42.03.629.412.4NONEX2.03.646.449.480001010C/EOffsetfrom theStop BarDetectionZoneLength FTSB/LEFTSB/RIGHTWB/THRUWB/RIGHTEB/THRUEB/LEFT-4-4004080408080*DETECTION ZONE WIDTH SHALL BE EQUAL TO 6'*** PHASE CALL C= CALL CL= CALL LOCKING E=EXTEND-SIGNAL TIMING PLANGRIFFIN DR & MANLEY RD6543Phase5NORMAL574&8 PED2G TO RR CL42&6øCLøCLCTGCTGRIGHT-OF WAYCHANGE INTERVALSCLEARTRACKINTERVALSPREEMPTION HOLDINTERVALSPRH-07SB1DetectionZoneSB2E1E2W1W2510C/EC/EEC/EEC/EEC/EC/E7EC/E10.0SBL2.07.0R14.02.03.629.412.4NONE-PRH-08PED7øCLGRRRDW6 PED4øCLDWYRRRDWDWRRRRDWDWRGRRDWWRYRRDWRRRRDWDWRRRGDWDWRRRYDWDWRRRRDWDWRRGRDWRRYRDWRRRRDWDWFLDWWFLDWGY6RRRGYRRRRRRRGYRRRRRRDWDWDWDWRRRRGDWDWRRRRRWDWRAIL ROAD SEQUENCE NOTES1- RIGHT-OF-WAY CHANGE NOTESa. G is the phase of the green interval in service when preemption occurs.b. "G", "Y", "R" refer to GREEN, YELLOW, and RED indications, respectively.2- PREEMPTION HOLD INTERVALS NOTES:a. During the preemption interval, the signal controller shall serve Phase 7 and its associated overlap, and Phase 8 Ped.b. If signals were flashing prior to preemption, all phases shall again flash yellow or red after the clear track interval.3- EXIT PHASE NOTES:a. After release of the preemption circuit, the phase in service should terminate to 2 & 6, unless local conditions requirephases 7 or 8 Ped to remain in service.b. Phases displaying flashing yellow shall change to stead yellow and other phases shall display steady red.c. An actuated controller unit should place calls on all phases displaying red during the hold interval.4.GATE DOWN TIMINGMIN GREEN 10 SECONDSEXTENSIONS5 SECONDSMAX GREEN40 SECONDS CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.9BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD WIRING DIAGRAM 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -NOT TO SCALETO POLE#19 & POLE#7S-1SINGLE TYPE "C" SERVICE WIRING DIAGRAM CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.10BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD WIRING DIAGRAM 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -TO CONTROLLERCABINETTO POLE#11TO POLE#23FROMPOLE#20FROMPOLE#21NOT TO SCALE CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.11BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.12BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.13BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.14BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.15BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.16BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.17BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.18BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.19BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG -35', 40' & 45'MOUNTINGHEIGHTCOPPER GROUNDINGSTRAP BETWEENANCHOR BOLT,CONDUIT (IF METAL)AND BARE AWG NO.6GROUND WIRECLASS STRUCTURECONCRETEFOUNDATIONANCHOR BOLTPROTRUSION5" TO 7 "PEDESTRIANPUSH BUTTONWHEN SPECIFIEDARROW TO BE LEFT OR RIGHT,OR BOTH AS REQUIRED.5" x 7 34" ALUMINUMSIGN, BLACK LETTERSON WHITE BACKGROUND.BACK OF CASTING SHAPED TOFIT CURVATURE OF POLE.TERMINALCOMPARTMENTPOLESHAFTTYPE 2ATYPE 3A2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)UPPER SHAFT4" x 6 12"HANDHOLEAND COVERPROVIDE A REMOVABLECOVER PLATE WITHEACH POLE SHAFT.COVER PLATE DETAILIS REQUIRED.2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)WELD HOOK TO POLESHAFT FOR SUPPORTOF WIRE CLAMP14" PLATE TOP,BOTTOM AND SIDESREMOVABLECAP34" THREADED SCHEDULE 40A53 PIPE (BREAK SHARP EDGESFOR WIRE PROTECTION)1 " SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGESFOR WIRE PROTECTION)2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)LUMINAIREMAST ARMFILLERMATERIAL38" PLATE TOP,BOTTOM AND SIDESREMOVABLE CAPAMIN.LUMINAIRE ARMMIN. 11 GAUGEUPPER SHAFTMIN.11 GAUGE12' 6"6"10' 0"19' 0"3" THREADED SCHEDULE 40 A53 PIPE,PROJECTING FROM SHAFT 2", WITHREMOVABLE CAP. BREAK SHARP EDGESFOR WIRE PROTECTION.7' 0"4' 0"2' 6"2' 6" ± 1' 6"*7*3*2*12' 6"3' 0"*8 IS ELEVATION AT BOTTOM OF TRAF. SIGNAL HEADS (FIELD MOUNTED)*9 IS ELEVATION AT BOTTOM OF PED. SIGNAL HEADS (FIELD MOUNTED)*10 IS ELEVATION AT BOTTOM OF CONTROLLER CABINET (BAND MOUNTED)LOWER SHAFTSIGNAL ARM*3A*3B*3CLFACE OF CURB212" CLEARANCEN2' 0" MIN.REBAR HOOPS SPACEDEQUALLY AT ABOUTUSE GRADE 60 REINFORCING STEEL1'-4"LAP3"6"3"6"2" BEVEL3' 4"2' 0"K OF #41' 0" CENTERS10 OF #6 REBARM LONG (TYP.)EQUALLY SPACEDTABLE 3MTG.PTS.15'ATABLE 2DESIGN WEIGHTDESIGN AREA135 LB.MOUNTING POINTSNILNIL100 LB.9.0 SQ.FT.9.0 SQ.FT.105 LB.3.3 SQ.FT.210 LB.3.0 SQ.FT.200 LB.TABLE 1ABCDSIGNAL ARMPOLE SHAFTEFGHJFOUNDATIONKLMN20' & 25'ANCHOR BOLTS12.0 SQ.FT.80 LB.8.0 SQ.FT.4.72 SQ.FT.50', 55' & 60'* 1SIGNAL* 2EMERG. VEHICLEDETECTOR* 7LUMINAIRE* 8SIGNALS* 9PED. SIGNAL* 10CONTROLLER CAB.30', 35', 40' & 45' *1, *2 & *3TYPE (A) LOWER SHAFTTYPE (B) LOWER SHAFT15', 20', 25', 30', 35', 40'45', 50', 55', 60'19" SQ.21" SQ.19"21"134" x 48"2" x 48"MIN.BASEDIA.1312"15"MIN.WALLTHICK.516"516"22" SQ.24" SQ.23"25"112" - 6 UNC - 6" A325112" - 6 UNC - 6" A325 *1, *1A, *2, *3, & *3A12' 0"3' 0"12' 0"4' 0"77LB.11' 6"11' 6"12122"2"TYPICAL SIGNAL MOUNTINGSTERMINALCOMPARTMENT55'60'12.60'12.60'BASE SECTIONEND SECTIONSIGNAL ARM SLIP JOINTSPANLENGTHLENGTH45.00'50.00'BASE SECTION WITHFIELD DRILLED HOLEFOR 58" BOLT58"THRUBOLTEND SECTION WITH34" HOLE FOR 58"BOLTFIELD ASSEMBLEDTO ACHIEVE A SNUGTIGHT JOINT (MIN.OVERLAP NOT LESSTHAN 2.5 FT).STANDARDMAST ARMMOUNTINGELEVATOR PLUMBIZERMAST ARM MOUNTINGUSE PIPE BRACKETS TO MOUNT TRAFFIC ANDPEDESTRIAN SIGNALS TO THE POLE SHAFT UNLESSOTHERWISE SHOWN ON THE PLANS.TYPICAL FOUNDATIONNOTESDESIGN STANDARDS IN ACCORDANCE WITH THE 2015 AASHTO LRFD SPECIFICATIONSFOR STRUCTURAL SUPPORTS FOR HIGHWAY SIGNS, LUMINAIRES AND TRAFFICSIGNALS (AND ANY AMENDMENTS THERETO).DESIGN PARAMETERSDESIGN WIND VELOCITY 700 YEAR MRI BASIC WIND SPEEDFATIGUE CATEGORY 2HEIGHT AND EXPOSURE FACTOR Kzz = 16 FEETά = 9.5zg = TAKEN AS 900 FEET FOR EXPOSURE CDIRECTIONAL FACTOR Kd = 0.95, GUST FACTOR = 1.14 DRAG COEFFICIENTSLFRD TABLE 3.8.7-1NO ICE LOADS OR GALLOPINGDESIGN AREA = AREA WITH MAXIMUM WIND LOAD (WIND IS PERPENDICULARTO STANDARD, AS SHOWN).DESIGN WEIGHT = DEAD LOAD.DESIGN ALL TYPE (A) LOWER SHAFTS FOR A = 40' AND A MOUNTING HEIGHT OF 45'.DESIGN ALL TYPE (B) LOWER SHAFTS FOR A = 60' AND A MOUNTING HEIGHT OF 45'.PROVIDE ANCHOR BOLTS CONFORMING TO ASTM F1554 OR EQUAL. GALVANIZE ANDTHREAD THE TOP END (12" MIN.).CALL OUT WELDING PROCEDURES, SYMBOLS, BASE METAL SPECIFICATIONS ANDGRADES PRIOR TO FABRICATION OR APPROVAL.GALVANIZE POLE SHAFTS, ARMS, AND ACCESSORIES PER ASTM A123. GALVANIZEHARDWARE PER ASTM F2329.DETAIL 4DETAIL 5CURBSIGNALPEDESTRIAN PUSHBUTTON SIGNTYPICAL ORIENTATION FOR PIPEBRACKET MOUNTED SIGNALSSIGNAL STANDARD TYPEDETAIL 345° (TYP.)5JHEA36 PLATEFLOWER SHAFT58"- 11 UNC - 212" A325 (TYP.)(TYP.)GCJPDETAIL 1SIGNAL ARM CONNECTIONUPPER SHAFTA36 PLATEA36 PLATE45° (TYP.)LOWER SHAFT34" PLATE13" SQ.15"34" PLATEDETAIL 2SHAFT TO SHAFTDETAIL 6114"214"34"- 10 UNC - 3" A325 (TYP.)10"1412"1" PLATE34" PLATE7"7"912"DETAIL 3LUMINAIRE ARM CONNECTIONCDLOWER SHAFTFOR GROUNDINGNOTEA HANDHOLE DETAILAND A NUT HOLDERB45° (TYP.)A36 PLATEDETAIL ARE REQUIRED.HANDHOLEAND COVERSLOT = ANCHOR BOLT + 14" (TYP.)18"12" NUT HOLDERCJP4" x 8"DETAIL 6BASESIGNAL MAST ARM2"612"1"*2*3, 3A ,3B ,3CDETAIL 5ARM TENONS212"612"*7DETAIL 4LUMINAIRE TENONDETAIL 1 & 2 *1, *1A, *1B, *2, *3, *3A, & *3B *1, *1A, *1B, *1C, *2, *3, *3A, *3B, & *3C*1B*1A*1C *1, *1A, *1B, & *1C3' 0"3' 0"3' 0"12' 0"12' 0"15' 0"*1A - *1CSIGNAL*3 - *3CSIGN PANEL2"2"2"2"7 12" DIA. HOLEIN BASE PLATEWATCH FORVEHICLESSTART CROSSINGDON'T STARTFINISH CROSS INGIF STARTEDDON'T CROSSTO CROSSPUSH BUTTONSTEADYFLASHING TWISTLOCK TYPEPHOTO-ELECTRICCONTROLFIELD DRILL ANDTAP HOLE IN POLEFOR 1/2" PIPEINSTALLATION DETAIL FORPHOTO-ELECTRIC CONTROLCONDUIT OUTLETBODYSIGNAL POLE CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION E1.20BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD ELECTRICAL DETAILS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_ELEC_PROD.DWG - 12203418CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION LP1.1BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD LIGHTING POLE LOCATIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_NEW POLE LOCATIONS.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30' 56197817CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION LP1.2BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD LIGHTING POLE LOCATIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_NEW POLE LOCATIONS.DWG -NORTH1501530SCALE: 1"=30'NORTH1501530SCALE: 1"=30'CONDUITABANDONEDEXISTINGCONDUIT USED 910212312241122CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION LP1.3BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD LIGHTING POLE LOCATIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_NEW POLE LOCATIONS.DWG -NORTH1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30' 1314251516CONFORMS TO CONSTRUCTION RECORDS FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION LP1.4BOZEMAN, MONTANA STREET AND STORMWATER IMPROVEMENTS GRIFFIN DRIVE AND MANLEY ROAD LIGHTING POLE LOCATIONS 19078.01 SUBSTANTIAL COMPLETION08/24/22 LIGHTING UPDATES FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION FOR BIDDING 100% CITY REVIEW 01/25/23 03/02/22 08/16/21 05/25/21 03/12/21 02/19/21 70% CITY REVIEW12/4/20 BMB/WDA/SH/JS/NL 19078_NEW POLE LOCATIONS.DWG -NORTH1501530NORTH1501530SCALE: 1"=30'SCALE: 1"=30'