HomeMy WebLinkAbout521 STREETSCAPESTREETSCAPE STUDY
521 S BLACK AVE. ADU
NOTE: SEE PROPOSED PROJECT ELEVATIONS FOR ADDITIONAL INFORMATION
ALLEYE. STORY ST.STREETSCAPE
MAIN HOUSE
NORTH WESTSOUTHEAST
DESCRIPTION: THE PROPOSED GARAGE/ADU ADDITION RELATES CLOSELY TO THE PRIMARY DWELLING ON SITE IN TERMS OF FORM, MATERIALITY, AND
DETAILS. THE PROPOSED STRUCTURE WILL BE TWO STORIES WITH A RAMMED EARTH FACADE AT THE MAIN LEVEL TRANSITIONING TO CORRAL BOARD
AT THE UPPER LEVEL TO MATCH THE FRONT OF THE EXISTING HOUSE. THE ROOF PITCH WILL ALSO MATCH THAT OF THE FRONT GABLE OF THE MAIN
HOUSE, AND WILL HAVE A MATCHING STANDING SEAM METAL ROOF. THE FENESTRATIONS WILL BE HARMONIOUS WITH THOSE OF THE PRIMARY
DWELLING, AND DETAILS SUCH AS RECESSED GUTTERS AND RECESSED WINDOWS WILL HELP TO TIE THIS NEW ADDITION IN WITH THE DETAILS OF THE
EXISTING HOME.
PROJECT SITE
S BLACK AVE.
GARAGE
NORTH EAST SOUTH WEST
EXISTING GARAGE BELOW TO BE DEMOLISHED.