HomeMy WebLinkAbout48a - L 6.00 - Irrigation Notes and LegendsGENERAL IRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1" SCH 40 PVC.3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS. BUBBLERS TO BE EVENLYDISTRIBUTED AROUND BASE OF TREE WITH FOUR (4) EVENLY SPACED BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION. DRIPIRRIGATION TO BE ADJUSTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS. BUBBLERSTO BE EVENLY DISTRIBUTED AROUND BASE OF SHRUB WITH TWO (2) EVENLY SPACED BUBBLEREMITTERS.6.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING.DRIP EMITTERS TO BE ADJUSTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.RECOMMENDED EMITTERS PER PLANT TYPE:PERENNIALS- (1) 0.5 GPH EMITTERSHRUBS- (2) 1.0 GPH EMITTERS/0.25-1.0 GPM BUBBLERSTREES- (4) 1.0 GPH EMITTERS/0.25-1.0 GPM BUBBLERS***TREES UTILIZING DRIP IN PLANTING BEDS MAY NEED ADDITIONAL EMITTERS TO MEETWEEKLY WATERING REQUIREMENTS.7.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED ON PLAN.8.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.9.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.10.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECHANICAL ROOM ORAPPROVED EXTERNAL GRADEBOX. IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TOCOORDINATE INSTALLATION PER LOCAL CODES AND ORDINANCES AS WELL AS WITH ARCHITECTURE AND ALL OTHER TRADES.11.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEER,ELECTRICAL CONTRACTOR AND LANDSCAPE CONTRACTOR.12.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES AREPRESENT.13.ALL INFORMATION TO BE FIELD-VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.14.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITEAT ALL TIMES.15.SYSTEM DESIGNED TO FALL WITHIN OPERATING PRESSURE OF 50 PSI AND 12 GPM. IF NOT WITHINLIMITS, CONTRACTOR MUST CONTACT LANDSCAPE ARCHITECT.ANNUAL WATER USE BASED ON AREA USING PROPOSED SCHEDULE- ESTABLISHEDWATERING WINDOW USED: MAY-SEPTEMBER(5 MONTHS/ 22 WEEKS)PER C.O.B.WATER CONSERVATION WEBSITEWEEKLY WATER USE PER BUILDING IRRIGATION PLANS SEE L6.00-L6.41BUILDING 1= 5,581 GAL/WEEKBUILDING 2= 2,805 GAL/WEEKBUILDING 3= 3,569 GAL/WEEKCLUB HOUSE = 4,453 GAL/WEEKCOMMERCIAL = 491 GAL/WEEK-TOTAL GALLONS USED @22 WEEKS= 16,399 GAL/WK X 22 WEEKS= 360,778 GALS-AREA OF LANDSCAPE = 85,507 FT²WATER USE = 4.35 GAL/FT²1design5la.com406.587.4873www.kephart.com2555 WALNUT STREETDENVER, COLORADO 80205ALPENGLOW APTS
SOUTH UNIVERSITY DISTRICT - BLOCK 1
BOZEMAN, MONTANADATEISSUENOT FOR CONSTRUCTION09/29/23SPRNO.CHECKED BYDRAWN BYTSNB11/17/2350% DD01/12/24SPR REVISION 105/31/24SPR REVISION 208/09/24SPR REVISION 310/18/24SPR REVISION 4NOTE: SEE L0.07 FOR LANDSCAPE COVERAGE CALCULATIONS.Irrigation Notes &LegendsL 6.001