Loading...
HomeMy WebLinkAbout27b - L 0.07 - LANDSCAPE COVERAGE CAULCULATIONSNO DIVINGNO DIVINGNO DIVING NO DIVINGNO DIVINGNO DIVING NO DIVINGNO DIVINGNO DIVING NO DIVING 20'20'O.S. 13,733 FT²15'BFCPBFCPBFCPBFCPBFCP1111111111111NO DIVINGNO DIVINGNO DIVING NO DIVINGNO DIVINGNO DIVING NO DIVINGNO DIVINGNO DIVING NO DIVING 20'20'O.S. 13,733 FT²15'BFCPBFCPBFCPBFCPBFCP1111111111111UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEWWWWWWWWWWWWWWOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEOHECOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM COMMCOMMWWWWWW W WWWWWWWWWWWWWWWWWWWWWW WWWSDSDSDSDSDSDSDSDSDSD SDUGE UGE UGE UGE UGE UGE UGE UGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS GASGASGASGASGASGASGASGASGASGASECSS SS SS SS SS SS SS SS SS SS SS SS SSSTATE ST(35' WIDTH - 60' ROW)S 19TH AVEKAGY BLVD(ROW VARIES)KAGY BLVD(ROW VARIES)SOUTH 17TH AVE(47' WIDTH - 70' ROW)(ROW WIDTH VARIES)S 19TH AVE(ROW WIDTH VARIES)SSSSSSSSSSSSW SD SD SD SD SD SDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD W W W W W W W W W W W W WCOMMON OPEN SPACELOT 1, BLOCK 2, 0.07 ACPLAT J-695COMMON OPEN SPACELOT 2, BLOCK 2, 0.07 ACSSSSSSSDSSSSSSSSWWWWWSDSD SD SDSDSDSDSDSDUGEUGEUGEWWWWWWWWWWWWWAISLE "C"AISLE "A"AISLE "B"AISLE "C"AISLE "6"AISLE "D"MAIL LOADINGZONEWSSSSSSSSSSSSWW SDSDSDSDSDSDSDSDSDSDSD SD WAISLE "1"AISLE "2"AISLE "3"AISLE "4"AISLE "5"SDEV STATIONEV STATIONEV STATIONEV STATIONUGEUGECOMMCOMMGASGASGASGASGASGAS GASGASGASGASGASMICR.MAIN ELEC.GARAGEACC.GARAGEGARAGEGARAGEGARAGEGARAGESTORAGEELECSTAIR 2VESTIBULEENTRYELEV 1ELEV 2CORRIDORSTORAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEMAINTENANCEWATER SERV ICE STAIR 1UNIT B2UNITA2UNITA2UNIT C1UNIT B1UNITA2UNITA2UNIT B2TRASHTERMINATIONBOILER 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12"1/4" / 12 "1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12 "1/4" / 12" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 6"4"0"4"4"4"4" 4" 4"ELEV EQUIP1/4" / 12"TRASHACCESSSWITCH GEARMICR. MAIN ELEC.GARAGEACC.GARAGEGARAGEGARAGEGARAGEGARAGESTORAGEELECSTAIR 2VESTIBULEENTRYELEV 1ELEV 2 CORRIDOR STORAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEMAINTENANCE WATER SERV ICE STAIR 1UNIT B2UNITA2UNITA2UNIT C1UNIT B1UNITA2UNITA2UNIT B2TRASHTERMINATION BOILER1/4" / 12 "1/4 " / 12"1/4" / 12 "1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12 "1/4" / 12 "1/4" / 12 " 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 4"4"4"4"4"4"4"4"4"4" 6"4"0"4"4"4"4"4"4"ELEV EQUIP1/4" / 12"TRASHACCESSSWITCH GEAR MICR.MAIN ELEC.GARAGEACC.GARAGEGARAGEGARAGEGARAGEGARAGESTORAGEELECSTAIR 2VESTIBULEENTRYELEV 1ELEV 2CORRIDOR STORAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEMAINTENANCEWATER SERVICESTAIR 1UNIT B2UNITA2UNITA2UNIT C1UNIT B1UNITA2UNITA2UNIT B2TRASHTERMINATIONBOILER1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"4"4"4"4"4"4"4"4"4"4"6"4"0"4"4"4"4"4"4"ELEV EQUIP1/4" / 12"TRASHACCESSSWITCH GEAR MOVIETHEATERSPORTS LOUNGESPORTSSIMULATORUTILITYFITNESS GAME ROOMGAME ROOMPOOL EQUIPMENTDOG WASHRISERPRIVATEGATHERINGCONFERENCE ROOMGAME ROOMCLUBROOMOFFICE WORK ROOMMAINT. OFFICEOFFICE CORRIDOR SPIN /YOGASTATIONSTATIONSTATIONSTATIONSTATION STATIONCONFERENCE ROOMUNISEX1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"MAIL ROOM[No Slope]LOW VOLT49204925493049214922492349244926492749284929493149324933SDSD SDSDSDGGGGGGGGGGGGGGGGGGGGGGSPRSPRGGGGGGGGGGGGGGGSPRSPRSPRSPRSPRGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGSPRGGGGGGGGGGGGGGSPRGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGSLOW SLOWSLOWSLOW SLOWSLOW SLOWSLOWSLOW582'-11"PROPERTY LINE626'PROPERTY LINE582'PROPERTY LINE620'-4"PROPERTY LINE25'18'9'18'24'8'9'25'9'24'NOTE:1.SHRUB AND PERENNIAL COVERAGE IS THE SUM OF ALLPLANT AREAS AT ASSUMED MATURITY SEE PLANTSCHEDULE ON PAGE L001 FOR PLANT QUANTITIES ANDASSUMED SIZES.LANDSCAPE COVERAGE SCHEDULESHRUB/PERENNIALPLANT COVER22,218SF26% TOTAL GROUND LEVELLANDSCAPE AREASEEDCOVERAGE34,862SF41%TOTAL LIVE PLANTCOVERAGE57,080 SF67%85,318SFLIVE PLANT MATERIALCOVERAGE AREA% COVERSF1WATER CONSERVATION REQUIREMENTSDESIGN PATHWAY: SEE L0.00LOCATIONCRITERIAPLAN UNITREQUIREDPROVIDEDHYDROZONEWATERUSELANDSCAPEVEGETATIVECOVERAGEREQUIREDTREESPLANTS MUST BE GROUPEDTOGETHER BY SIMILAR WATERUSE HYDROZONES.TOTALLANDSCAPE AREA85,318 SFWATERUSE NOTTO EXCEED8 GAL/SF7.3 GAL/SFSEE WATER BUDGETCALCULATOR TABLE ONSHEET L6.0060% OF LANDSCAPE MUSTCONTAIN A COMBINATION OFSHRUBS, PERENNIALS,EVERGREENS, TURF OROTHER APPROVED GROUNDCOVERS. MINIMUM OF 10%COVERAGE MUST BECOMPOSED OF CONTAINERGROWN EVERGREENS,SHRUBS OR PERENNIALS.TOTALVEGETATIVECOVER57,080 SF65%APPLICABLE AREA50,324 SF1 TREE PER 1600 SF OFAPPLICABLE LANDSCAPE AREA32 TREESTOTALVEGETATIVE COVER57,080 SF / 67%22,218 SF (26%) OFCONTAINER SHRUB &PERENNIALS34,862 SF (41%) OFOTHER GROUND COVER0 EXISTING TEES39 PROPOSED SITE TREESNOTE:1.GREEN HATCH DENOTES TOTAL NON-EXEMPT LANDSCAPE AREA2.SHRUB AND PERENNIAL COVERAGE IS THE SUM OF ALL INDIVIDUAL PLANTS ATASSUMED MATURITY. INDIVIDUAL PLANT AREAS HAVE BEEN MULTIPLIED BY THEQUANTITY REFLECTED ON THE PLAN TO GET THE TOTAL COVERAGE. SEE PLANTSCHEDULE ON PAGE L001 FOR PLANT QUANTITIES AND ASSUMED SIZES.60% OFLANDSCAPEAREA TO BECOVEREDW/ LIVEPLANTMATERIAL1TEMPORARY IRRIGATION AREA TOTAL TEMPORARYIRRIGATION13,212SFNOTE:1.TEMPORARY IRRIGATION ZONESARE INDICATED ON WATERBUDGET CALCULATOR, SEEL600S.1design5la.com406.587.4873www.kephart.com2555 WALNUT STREETDENVER, COLORADO 80205ALPENGLOW APTS SOUTH UNIVERSITY DISTRICT - BLOCK 1 BOZEMAN, MONTANADATEISSUENOT FOR CONSTRUCTION09/29/23SPRNO.CHECKED BYDRAWN BYTSNB11/17/2350% DD01/12/24SPR REVISION 105/31/24SPR REVISION 208/09/24SPR REVISION 310/18/24SPR REVISION 4Landscape CoverageCalculationsL 0.074020080N1L0.071" = 40'-0"Landscape Coverage Calculations NOT FOR CONSTRUCTION