HomeMy WebLinkAbout16 - C4.1A - Site & Drainage DetailsNOTESNOTESRAMP CONSTRUCTION NOTESRAMP DETAIL FORPLAZA SIDEWALKRAMP DETAIL FORSIDEWALK PERPENDICULAR TO CURBRAMP DETAIL FORSIDEWALK ADJACENT TO CURBTYPICAL SIDEWALK AND PAVEMENT SECTIONSNOTESNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOREASE OF REFERENCE. OTHER STANDARD DETAILS MAY APPLY.C4.2SITE & DRAINAGEDETAILS2 9/29/2023 SITE PLAN SUBMITTAL ZWL CDP
3 1/12/2024 RC SITE SUBMITTAL ZWL CDP
4 5/31/2024 RC 2 SITE SUBMITTAL ZWL CDP
6 8/9/2024 RC 3 SITE PLAN SUBMITTAL ZWL CDP
7 8/1/2024 BID / PRICING SET ZWL CDP
8 10/18/2024 RC 4 SITE PLAN SUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESALPENGLOW APARTMENTS
SUD PH3 BLOCK 1
ALPENGLOW
OF BOZEMAN, LLC