Loading...
HomeMy WebLinkAbout16 - C4.1A - Site & Drainage DetailsNOTESNOTESRAMP CONSTRUCTION NOTESRAMP DETAIL FORPLAZA SIDEWALKRAMP DETAIL FORSIDEWALK PERPENDICULAR TO CURBRAMP DETAIL FORSIDEWALK ADJACENT TO CURBTYPICAL SIDEWALK AND PAVEMENT SECTIONSNOTESNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOREASE OF REFERENCE. OTHER STANDARD DETAILS MAY APPLY.C4.2SITE & DRAINAGEDETAILS2 9/29/2023 SITE PLAN SUBMITTAL ZWL CDP 3 1/12/2024 RC SITE SUBMITTAL ZWL CDP 4 5/31/2024 RC 2 SITE SUBMITTAL ZWL CDP 6 8/9/2024 RC 3 SITE PLAN SUBMITTAL ZWL CDP 7 8/1/2024 BID / PRICING SET ZWL CDP 8 10/18/2024 RC 4 SITE PLAN SUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESALPENGLOW APARTMENTS SUD PH3 BLOCK 1 ALPENGLOW OF BOZEMAN, LLC