HomeMy WebLinkAbout15 - C4.0 - Grading PlanWWWWWWWWWWWWWWOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEFOPTFOPTFOPTFOPTFOPT COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMWWWWWWWWWW W WWWWWWWWWWWWWWWWW
WWWWWWWWSDSDSDSDSDSDSDSDSDSD SD SDUGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS
GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTFOPTECCSS
SSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSTATE STS 19TH AVEKAGY BLVDKAGY BLVDSOUTH 17TH AVE(ROW WIDTH VARIES)S 19TH AVE(ROW WIDTH VARIES)SSSSSSSSSSSSW W
SDSDSDSDSDSDSDSDSDSDSDSD
SD SD
SD SD
SD
SD SD SD SD SD SDSDSDSDSD
SDSDSDSDSDSDSDSDSDSDSDSD SD
SD
SD SD
SD
W W W W W W W W W W W W W SSSSSSSSSSSSSSSDSDSDSD SD
SDSDSDSDSDSDO.S 1O.S 2AISLE "C"AISLE "A"AISLE "B"AISLE "C"AISLE "6"AISLE "D"MAIL LOADINGZONESDSDSDSDSDSDSDSDSDSDSD SD
AISLE "1"AISLE "2"AISLE "3"AISLE "4"AISLE "5"NO DIVING
NO DIVING
NO DIVING
NO DIVINGNO DIVINGNO DIVING NO DIVINGNO DIVINGNO DIVING
NO DIVINGPOOL
SDEV STATIONEV STATIONEV STATIONEV STATIONUGECOMMUGEUGECOMMCOMMGASGASGAS
GASGASGASGASGASGASGASGASUGECOMMGASO.S 3>>COMMERCIALBUILDINGMICR.MAIN ELEC.GARAGEACC.GARAGEGARAGEGARAGEGARAGEGARAGESTORAGEELECSTAIR 2VESTIBULE
ENTRYELEV 1ELEV 2CORRIDORSTORAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEMAINTENANCE WATER SERVICESTAIR 1UNIT B2UNITA2 UNITA2 UNIT C1UNIT B1UNITA2UNITA2UNIT B2TRASHTERMINATIONBOILER1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"1/4
" /
12"1/4" / 12"1/4" / 12"1/4" / 12"1/4
" /
12
"1/4" / 12"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
6"4"0"4"4"4"4"
4"
4"ELEV EQUIP
1/4" / 12"TRASHACCESSSWITCH GEARMICR.MAIN ELEC.GARAGEACC.GARAGEGARAGEGARAGEGARAGEGARAGESTORAGEELECSTAIR 2VESTIBULEENTRYELEV 1ELEV 2CORRIDOR STORAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEMAINTENANCEWATER SERVICESTAIR 1UNIT B2UNITA2
UNITA2UNIT C1UNIT B1UNITA2 UNITA2 UNIT B2TRASHTERMINATIONBOILER1/4"
/ 12"1/4
" /
12"1/4"
/ 12"1/4" / 12"1/4" / 12"1/4" / 12
"1/4" /
12
"1/4
"
/ 12"1/4
"
/ 12"1/4"
/ 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"
1/4" / 12"4"4"4"4"4"4"4"4"4"4"6"4"0"4"4"4"4"4"4"ELEV EQUIP1/4" / 12"TRASHACCESSSWITCH GEAR MICR.MAIN ELEC.GARAGEACC.GARAGEGARAGEGARAGEGARAGEGARAGESTORAGEELECSTAIR 2VESTIBULEENTRYELEV 1ELEV 2CORRIDOR STORAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEGARAGEMAINTENANCE WATER SERVICESTAIR 1UNIT B2UNITA2UNITA2UNIT C1UNIT B1UNITA2 UNITA2 UNIT B2TRASHTERMINATION BOILER1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"1/4" / 12"4"4"4"4"4"4"4"4"4"4"6"4"
0"
4"
4"
4"
4"4"4"ELEV EQUIP1/4" / 12"TRASHACCESSSWITCH GEAR MOVIETHEATERSPORTS LOUNGESPORTSSIMULATORUTILITYFITNESSGAME ROOMGAME ROOMPOOL EQUIPMENTDOG WASHRISERPRIVATEGATHERINGCONFERENCE ROOMGAME ROOMCLUBROOMOFFICEWORK ROOMMAINT. OFFICEOFFICECORRIDORSPIN /YOGASTATIONSTATIONSTATION
STATIONSTATIONSTATION
CONFERENCE ROOMUNISEX1/4" / 12"1/4" / 12"1/4" / 12"
1/4" / 12"MAIL ROOM[No Slope]LOW VOLT5 STORY91-PLEX BUILDINGBUILDING 15 STORY91-PLEX BUILDINGBUILDING 2BUILDING 35 STORY91-PLEX BUILDINGCLUBHOUSESDSD SDSDSDC4.0GRADING PLAN2 9/29/2023 SITE PLAN SUBMITTAL ZWL CDP
3 1/12/2024 RC SITE SUBMITTAL ZWL CDP
4 5/31/2024 RC 2 SITE SUBMITTAL ZWL CDP
6 8/9/2024 RC 3 SITE PLAN SUBMITTAL ZWL CDP
7 8/1/2024 BID / PRICING SET ZWL CDP
8 10/18/2024 RC 4 SITE PLAN SUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESALPENGLOW APARTMENTS
SUD PH3 BLOCK 1
ALPENGLOW
OF BOZEMAN, LLC GRADING NOTES:1.FINISHED GRADE CONTOURS ARE AT PAVEMENT GRADE.2.FINISHED GRADE CONTOUR INTERVAL IS 0.25'.3.SLOPE SIDEWALKS TO TOP BACK OF CURB AT 1.5% (TYP, 1% MIN,2% MAX). WARP SIDEWALK GRADES TO BE LEVEL AT BUILDINGENTRANCES.4.ACCESSIBLE ROUTES (GENERALLY SIDEWALK AND MAINBUILDING ACCESSES) TO COMPLY WITH ADA REQUIREMENTS.5.LANDSCAPED AREAS TO HAVE A SLOPE NO GREATER THAN 4h:1v.6.ENSURE THE WALKS ALONG THE ACCESSIBLE ROUTE HAVE ARUNNING SLOPE OF 1:20 OR 5% MAXIMUM (EXCEPT AT THE CURBRAMPS, WHICH CAN BE UP TO 1:12 OR 8.33%) AND A CROSSSLOPE OF 1:48 OR 2% MAXIMUM. THIS INCLUDES AT THECROSSING OF DRIVE LANES.7.WHERE THE ACCESSIBLE ROUTES INTERSECT, A 48"X48" LEVEL"LANDING" THAT HAS A SLOPE OF 2% MAXIMUM IN ANYDIRECTION IS REQUIRED.8.ENSURE THE MANEUVERING CLEARANCES AT THE EXTERIORSIDE OF ALL ENTRY DOORS AND AT BOTH SIDES OF GATES HAVEA SLOPE OF 1:48 OR 2% MAXIMUM IN ANY DIRECTION, AND A 1/2"MAXIMUM OVERALL CHANGE IN LEVEL AT THE THRESHOLDS.9.ENSURE A 30" X 48" CLEAR FLOOR SPACE (CFS) IS PROVIDEDADJACENT TO THE EXTERIOR SITE ELEMENTS SUCH ASBENCHES, TRASH CANS, AND BIKE RACKS, AND HAVE A SLOPE OF1:48 OR 2% MAXIMUM IN ANY DIRECTION.10.SLOPE LANDSCAPED AREAS AWAY FROM BUILDING AT 5% MIN,10% MAX GRADE FOR A DISTANCE OF 10 FEET.11.MAINTAIN POSITIVE DRAINAGE TO CURB INLETS. SLOPE ASPHALTTO NEW CURB AT 1% MIN, 4% MAX.THIS SITE HAS BEEN DESIGNED IN COMPLIANCE WITHTHE STANDARDS OF THE AMERICANS WITHDISABILITIES ACT (ADA) AS CERTIFIED BY THEENGINEER OF RECORD, STAHLY ENGINEERING.ZACH LOWE, PECERTIFIED BY