HomeMy WebLinkAboutStory Mill Road - Bridger Dr to Griffin Dr Reconstruction, Stormwater & Intersection ImprovementsVICINITY MAPSITEBOZEMAN, MONTANAPREPARED FOR:STORY MILL ROADBRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,STORMWATER AND INTERSECTION IMPROVEMENTSNORTHPROJECT NO:RECORD DRAWINGS20023.02106 East Babcock, Suite L1Bozeman, Montana 59715406.522.9876sandersonstewart.comCITY OF BOZEMANBOZEMAN, MONTANA 5971520 EAST OLIVE STREET"(BLANK)"SHEETTITLEC1.1COVERC2.1LEGENDS AND ABBREVIATIONSC3.1EXISTING TOPOGRAPHY AND DEMOLITION PLANC3.2EXISTING TOPOGRAPHY AND DEMOLITION PLANC4.1OVERALL SITE PLANC4.2OVERALL SITE PLANC5.1PLAN AND PROFILE STA. -4+00 TO 0+00C5.2PLAN AND PROFILE STA. -0+50 TO 4+00C5.3PLAN AND PROFILE STA. 4+00 TO 8+75C5.4PLAN AND PROFILE STA. 8+00 TO 12+25C6.1PATH PLAN AND PROFILE 40+00 TO 43+50C6.2PATH PLAN AND PROFILE 43+50 TO 46+75C7.1STORM DRAIN PLAN STORY MILL ROAD AND BRIDGER DRIVEC7.2STORM DRAIN PLAN AND PROFILE STA 19+75 TO 23+50C7.3STORM DRAIN PLAN AND PROFILE STA 23+25 TO 27+00C7.4STORM DRAIN PLAN AND PROFILE STA 25+50 TO 28+50C8.1GRADING PLAN-BRIDGER DRIVE INTERSECTIONC8.2GRADING PLAN-COS 1895 APPROACH & HILLSIDE LANE INTERSECTIONC8.3GRADING PLAN-HILLSIDE LANE EAST SIDE CONNECTIONC8.4GRADING PLAN-GRIFFIN DRIVE INTERSECTION & COS 1877B APPROACHESC8.5GRADING PLAN-SOUTH CONNECTIONC8.6INFILTRATION POND GRADINGC9.1STORY MILL ROAD CROSS SECTIONSC9.2STORY MILL ROAD CROSS SECTIONSC9.3STORY MILL ROAD CROSS SECTIONSC9.4STORY MILL ROAD CROSS SECTIONSC10.1STORY MILL ROAD DETAILSC10.2STORY MILL ROAD DETAILSS1.1SIGNAGE & STRIPINGS1.2SIGNAGE & STRIPINGS1.3SIGNAGE & STRIPINGS1.4SIGNAGE & STRIPINGS1.5SIGNAGE & STRIPINGS1.6SIGNAGE & STRIPING DETAILSS1.7SIGNAGE & STRIPING DETAILSE1.1POLE SCHEDULEE1.2LIGHTING PLANSE1.3LIGHTING PLANSE1.4SIGNAL PLANE1.5CONTROLLER SETTINGSE1.6WIRING DIAGRAME1.7ELECTRICAL DETAILSE1.8ELECTRICAL DETAILSE1.9ELECTRICAL DETAILSE1.10ELECTRICAL DETAILSE1.11ELECTRICAL DETAILSE1.12ELECTRICAL DETAILSE1.13ELECTRICAL DETAILSE1.14ELECTRICAL DETAILSE1.15ELECTRICAL DETAILS1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950
EXISTING WATER VALVEEXISTING FIRE HYDRANTEXISTING CURB STOPFIRE DEPT. CONNECTIONWELLDEMO AREAEW = FINISHED GRADE AT EDGE OF WALKTC = FINISHED GRADE AT TOP BACK OF CURBBC = FINISHED GRADE AT BUILDING CORNERTW = FINISHED GRADE AT TOP OF WALLAC = FINISHED GRADE AT ASPHALTEA = FINISHED GRADE AT EDGE OF ASPHALTEC = FINISHED GRADE AT EDGE OF CONCRETESDI = STORM DRAIN INLETSDMH = STORM DRAIN MANHOLEFL = FINISHED GRADE AT FLOWLINEFG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATIONPOC = POINT ON CURVEEXISTING WATER REDUCERWTR = WATERPI = POINT OF INTERSECTIONPRC = POINT OF REVERSE CURVERT = RIGHTLT = LEFTSS = SANITARY SEWERPT = POINT OF TANGENCYSD = STORM DRAINGV = GATE VALVEBFV = BUTTERFLY VALVERED = REDUCERLF = LINEAL FOOTFT = FEETSSMH = SANITARY SEWER MANHOLEBVC = BEGIN VERTICAL CURVECS = CURB STOPEVC = END VERTICAL CURVEPVI = POINT OF VERTICAL INTERSECTIONLINETYPESABBREVIATIONSPROPOSED WATER REDUCERPROPOSED WATER VALVEPROPOSED FIRE HYDRANTPROPOSED CURB STOPKEYNOTE CALL OUT(SEE KEYNOTE LEGEND)RECORD DRAWINGSSRVC = SERVICE(TYP.) = TYPICALPC = POINT OF CURVATURENOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN AREINDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION.SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAWREQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATIONFOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANAPUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THECITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITHADDENDUM.-ALL IMPROVEMENTS WITHIN MONTANA DEPARTMENT OF TRANSPORTATION RIGHTOF WAY SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA DEPARTMENT OFTRANSPORTATION STANDARD AND SUPPLEMENTAL SPECIFICATIONS FOR ROADAND BRIDGE CONSTRUCTION.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALLBE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSEDIN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF ORENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEINGPERFORMED.GR = EXISTING GRADE AT GROUNDBRK = GRADE BREAKFIBER OPTICGAS PIPELINEOIL PIPELINEUNDERGROUND POWERSANITARY SEWERSTORM DRAINTELEPHONETELEVISION/CABLEWATERCONTOUROVERHEAD POWERFENCE - VINYLFENCE - BARBWIREFENCE - WOODCURB AND GUTTEREDGE OF ASPHALTEDGE OF GRAVELFENCE - CHAINLINK/WOVEN WIREEXISTINGPROPOSEDHP = HIGH POINTFILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C2.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
LEGENDS AND ABBREVIATIONS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_COVER.DWG
JHSW S = WATER SERVICESS S = SANITARY SEWER SERVICEELECTRIC JUNCTION BOXSIGNPOWER POLEBOLLARDBUSHFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALSIGNAL POLETELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALGAS WELLFOUND CORNER MONUMENT AS NOTEDSET CORNER MONUMENT, REBAR WITH CAPBENCHMARKSECTION QUARTER CORNERSECTION CORNERSYMBOLSEXISTING MONUMENT BOXPROPOSED MONUMENT BOXEXISTING STORM DRAIN MANHOLEEXISTING CATCH BASINEXISTING SANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXYARD HYDRANTPROPOSED CATCH BASINPROPOSED SANITARY SEWER MANHOLEPROPOSED STORM DRAIN MANHOLEPROPOSED AREA CATCH BASINCATCH CURBSPILL CURBTRANSITION FROM CATCHTAPER CURB HEAD 3'TO SPILL CURBGRADING PLANEXISTING 60' STORY MILL ROAD EASEMENTEXISTING UTILITY EASEMENTEXISTING PROPERTY BOUNDARYEXISTING 30' ROAD EASEMENT
CP#1CP#2NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C3.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
EXISTING TOPOGRAPHY AND DEMOLITION PLAN
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_EXISTING_PROD.DWG
JHS4004080SCALE: 1" = 80'PROJECT SURVEY CONTROLPoint #12Northing128509.29128600.56Easting386497.27386003.78Elevation4733.264728.56DescriptionCP / 2ACRSSCNTLMONCP / 2ACRSSCNTLMON
CP#4CP#11NORTHFILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C3.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
EXISTING TOPOGRAPHY AND DEMOLITION PLAN
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_EXISTING_PROD.DWG
JHS4004080SCALE: 1" = 80'RECORD DRAWINGSPROJECT SURVEY CONTROLPoint #411Northing128010.34127616.45Easting386533.45386587.34Elevation4734.314734.41DescriptionCP / 2"ACRSSCNTLMONSC /3.25 DIA AC MDT 2003 10062LS - T1S-2S R6E SEC 31-32-6-5
NORTHFILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C4.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
OVERALL SITE PLAN
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_OVERALL_PROD.DWG
JHS4004080SCALE: 1" = 80'RECORD DRAWINGS
NORTHFILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C4.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
OVERALL SITE PLAN
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_OVERALL_PROD.DWG
JHS4004080SCALE: 1" = 80'RECORD DRAWINGS
NORTHRECORD DRAWINGS VERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C5.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
PLAN AND PROFILE STA. -4+00 TO 0+00
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_ROAD_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
NORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C5.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
PLAN AND PROFILE STA. -0+50 TO 4+00
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_ROAD_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
RECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C5.3BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
PLAN AND PROFILE STA. 4+00 TO 8+75
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_ROAD_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
NORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C5.4BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
PLAN AND PROFILE STA. 8+00 TO 12+25
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_ROAD_PROD.DWG
JHS2002040HORIZONTAL SCALE: 1" = 40'EX BUILDINGDO NOT DISTURB
NORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C6.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
PATH PLAN AND PROFILE 40+00 TO 43+50
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_PATH_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
NORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C6.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
PATH PLAN AND PROFILE 43+50 TO 46+75
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_PATH_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
84 LF4729.50NORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C7.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORM DRAIN PLAN STORY MILL ROAD AND BRIDGER DRIVE
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_STORM_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
4728.02(S)SDMH-2NORTH - SAW CUT TO DESIGN AND THEN GROUTEDSOUTH - SET TO 4728.02 - STORM DRAIN SLOPE @ 0.77%30 LFNORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C7.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORM DRAIN PLAN AND PROFILE STA 19+75 TO 23+50
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_STORM_PROD.DWG
JHS2002040HORIZONTAL SCALE: 1" = 40'
24+54.47SDI-5: MOVEDDUE TO GAS LINENORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C7.3BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORM DRAIN PLAN AND PROFILE STA 23+25 TO 27+00
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_STORM_PROD.DWG
JHS 2002040HORIZONTAL SCALE: 1" = 40'
NORTHRECORD DRAWINGSVERTICAL SCALE: 1"=10'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C7.4BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORM DRAIN PLAN AND PROFILE STA 25+50 TO 28+50
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_PNP_STORM_PROD.DWG
JHS2002040HORIZONTAL SCALE: 1" = 40'
NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C8.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
GRADING PLAN-BRIDGER DRIVE INTERSECTION
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ENLARGED_GRADING.DWG
JHS 50510SCALE: 1" = 10'
NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C8.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
GRADING PLAN-COS 1895 APPROACH & HILLSIDE LANE
INTERSECTION
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ENLARGED_GRADING.DWG
JHS50510SCALE: 1" = 10'
NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C8.3BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
GRADING PLAN-HILLSIDE LANE EAST SIDE CONNECTION
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ENLARGED_GRADING.DWG
JHS50510SCALE: 1" = 10'NORTH
NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C8.4BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
GRADING PLAN-GRIFFIN DRIVE INTERSECTION & COS 1877B
APPROACHES
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ENLARGED_GRADING.DWG
JHS50510SCALE: 1" = 10'NORTHNORTH
NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C8.5BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
GRADING PLAN-SOUTH CONNECTION
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ENLARGED_GRADING.DWG
JHS50510SCALE: 1" = 10'
NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C8.6BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
INFILTRATION POND GRADING
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_POND_ENLARGED_GRADING.DWG
JHS15030SCALE: 1" = 30'INFILTRATION POND DETAIL15
RECORD DRAWINGSVERTICAL SCALE: 1"=20'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C9.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORY MILL ROAD CROSS SECTIONS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_XSECT_PROD.DWG
JHS1001020HORIZONTAL SCALE: 1" = 20'
RECORD DRAWINGSVERTICAL SCALE: 1"=20'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C9.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORY MILL ROAD CROSS SECTIONS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_XSECT_PROD.DWG
JHS1001020HORIZONTAL SCALE: 1" = 20'
RECORD DRAWINGSVERTICAL SCALE: 1"=20'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C9.3BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORY MILL ROAD CROSS SECTIONS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_XSECT_PROD.DWG
JHS1001020HORIZONTAL SCALE: 1" = 20'
RECORD DRAWINGSVERTICAL SCALE: 1"=20'FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C9.4BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORY MILL ROAD CROSS SECTIONS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_XSECT_PROD.DWG
JHS1001020HORIZONTAL SCALE: 1" = 20'
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C10.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORY MILL ROAD DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_DETAILS.DWG
JHSTYPICAL STORY MILL ROAD TYPICAL STORY MILL ROAD TYPICAL STORY MILL ROAD
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
C10.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
STORY MILL ROAD DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_DETAILS.DWG
JHSSTORM DRAIN OUTLET STRUCTURE DETAIL NORTH0SCALE:1" = 20'201010
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
POLE SCHEDULE
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
S1S2S3S4S5S6S7S8S9S10S11L1L2L3L4NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
LIGHTING PLANS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS1501530SCALE: 1" = 30'NORTH1501530SCALE: 1" = 30'CONDUIT & WIRESCHEDULEAAAAAAAAAABBBB
L6L5L7NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.3BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
LIGHTING PLANS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS 1501530SCALE: 1" = 30'CONDUIT & WIRESCHEDULEAAABAAABABA
S6S5S4S3S2S1S11S10S9S8S71213314451561678179181011191220RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.4BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAL PLAN
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS NORTH1001020SCALE: 1" = 20'CBDEJELEGEFEHEMEKA
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.5BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
CONTROLLER SETTINGS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHSNORTHSTORY MILL RDBRIDGER DRBRIDGER DR426MAX GREENTime of Day (TOD)TIMING PLAN 1MAX GREENTime of Day (TOD)TIMING PLAN 2WEEKLY PROGRAMThuFriSatWedSunMonTuePREEMPTIONPlanCalls ØOutput123456789101112MovementExtendDelayController SettingsDETECTOR TABLE**Phase Called (Call/Call Locking/Extend)BASIC INTERVALSPhase12345678LagMax 1Max 2Time BeforeTime to ReduceMinimum GapYellowAll RedPed ClearanceMin Green10.07.010.0MovementEBSBWBExtension2.02.02.0Walk7.0RecallSOFTSOFTProg Flash DisplayYRYStart Up Ø XTiming Plan21111122648CH13RCH14RCH15RCH16R06301900MAX 1MAX 2MAX 2MAX 1090017003.620.02.02.43.0NONEX2.03.6-4-4Offsetfrom theStop BarEBSBWB-4** PHASE CALL C= CALL CL= CALL LOCKING E=EXTENDSIGNAL TIMING PLANBRIDGER DR & STORY MILL RDEB1DetectionZoneSB1WB1C/EEC/EEC/ENB3456STORY MILL RD
87.02.0R2.43.0NONE7.016.07.016.07.020.046234623NB-4NB1EEC/E101056235623
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.6BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
WIRING DIAGRAM
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS NOT TO SCALENOT TO SCALE
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.7BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.8BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.9BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.10BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.11BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.12BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
RECORD DRAWINGS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.13BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.14BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS35', 40' & 45'MOUNTINGHEIGHTCOPPER GROUNDINGSTRAP BETWEENANCHOR BOLT,CONDUIT (IF METAL)AND BARE AWG NO.6GROUND WIRECLASS STRUCTURECONCRETEFOUNDATIONANCHOR BOLTPROTRUSION5" TO 7 "PEDESTRIANPUSH BUTTONWHEN SPECIFIEDARROW TO BE LEFT OR RIGHT,OR BOTH AS REQUIRED.5" x 7 34" ALUMINUMSIGN, BLACK LETTERSON WHITE BACKGROUND.BACK OF CASTING SHAPED TOFIT CURVATURE OF POLE.TERMINALCOMPARTMENTPOLESHAFTTYPE 2ATYPE 3A2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)UPPER SHAFT4" x 6 12"HANDHOLEAND COVERPROVIDE A REMOVABLECOVER PLATE WITHEACH POLE SHAFT.COVER PLATE DETAILIS REQUIRED.2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)WELD HOOK TO POLESHAFT FOR SUPPORTOF WIRE CLAMP14" PLATE TOP,BOTTOM AND SIDESREMOVABLECAP34" THREADED SCHEDULE 40A53 PIPE (BREAK SHARP EDGESFOR WIRE PROTECTION)1 " SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGESFOR WIRE PROTECTION)2" SCHEDULE 40 A53 PIPE(BREAK SHARP EDGES FORWIRE PROTECTION)LUMINAIREMAST ARMFILLERMATERIAL38" PLATE TOP,BOTTOM AND SIDESREMOVABLE CAPAMIN.LUMINAIRE ARMMIN. 11 GAUGEUPPER SHAFTMIN.11 GAUGE12' 6"6"10' 0"19' 0"3" THREADED SCHEDULE 40 A53 PIPE,PROJECTING FROM SHAFT 2", WITHREMOVABLE CAP. BREAK SHARP EDGESFOR WIRE PROTECTION.7' 0"4' 0"2' 6"2' 6" ± 1' 6"*7*3*2*12' 6"3' 0"*8 IS ELEVATION AT BOTTOM OF TRAF. SIGNAL HEADS (FIELD MOUNTED)*9 IS ELEVATION AT BOTTOM OF PED. SIGNAL HEADS (FIELD MOUNTED)*10 IS ELEVATION AT BOTTOM OF CONTROLLER CABINET (BAND MOUNTED)LOWER SHAFTSIGNAL ARM*3A*3B*3CLFACE OF CURB212" CLEARANCEN2' 0" MIN.REBAR HOOPS SPACEDEQUALLY AT ABOUTUSE GRADE 60 REINFORCING STEEL1'-4"LAP3"6"3"6"2" BEVEL3' 4"2' 0"K OF #41' 0" CENTERS10 OF #6 REBARM LONG (TYP.)EQUALLY SPACEDTABLE 3MTG.PTS.15'ATABLE 2DESIGN WEIGHTDESIGN AREA135 LB.MOUNTING POINTSNILNIL100 LB.9.0 SQ.FT.9.0 SQ.FT.105 LB.3.3 SQ.FT.210 LB.3.0 SQ.FT.200 LB.TABLE 1ABCDSIGNAL ARMPOLE SHAFTEFGHJFOUNDATIONKLMN20' & 25'ANCHOR BOLTS12.0 SQ.FT.80 LB.8.0 SQ.FT.4.72 SQ.FT.50', 55' & 60'* 1SIGNAL* 2EMERG. VEHICLEDETECTOR* 7LUMINAIRE* 8SIGNALS* 9PED. SIGNAL* 10CONTROLLER CAB.30', 35', 40' & 45' *1, *2 & *3TYPE (A) LOWER SHAFTTYPE (B) LOWER SHAFT15', 20', 25', 30', 35', 40'45', 50', 55', 60'19" SQ.21" SQ.19"21"134" x 48"2" x 48"MIN.BASEDIA.1312"15"MIN.WALLTHICK.516"516"22" SQ.24" SQ.23"25"112" - 6 UNC - 6" A325112" - 6 UNC - 6" A325 *1, *1A, *2, *3, & *3A12' 0"3' 0"12' 0"4' 0"77LB.11' 6"11' 6"12122"2"TYPICAL SIGNAL MOUNTINGSTERMINALCOMPARTMENT55'60'12.60'12.60'BASE SECTIONEND SECTIONSIGNAL ARM SLIP JOINTSPANLENGTHLENGTH45.00'50.00'BASE SECTION WITHFIELD DRILLED HOLEFOR 58" BOLT58"THRUBOLTEND SECTION WITH34" HOLE FOR 58"BOLTFIELD ASSEMBLEDTO ACHIEVE A SNUGTIGHT JOINT (MIN.OVERLAP NOT LESSTHAN 2.5 FT).STANDARDMAST ARMMOUNTINGELEVATOR PLUMBIZERMAST ARM MOUNTINGUSE PIPE BRACKETS TO MOUNT TRAFFIC ANDPEDESTRIAN SIGNALS TO THE POLE SHAFT UNLESSOTHERWISE SHOWN ON THE PLANS.TYPICAL FOUNDATIONNOTESDESIGN STANDARDS IN ACCORDANCE WITH THE 2015 AASHTO LRFD SPECIFICATIONSFOR STRUCTURAL SUPPORTS FOR HIGHWAY SIGNS, LUMINAIRES AND TRAFFICSIGNALS (AND ANY AMENDMENTS THERETO).DESIGN PARAMETERSDESIGN WIND VELOCITY 700 YEAR MRI BASIC WIND SPEEDFATIGUE CATEGORY 2HEIGHT AND EXPOSURE FACTOR Kzz = 16 FEETĪ¬ = 9.5zg = TAKEN AS 900 FEET FOR EXPOSURE CDIRECTIONAL FACTOR Kd = 0.95, GUST FACTOR = 1.14 DRAG COEFFICIENTSLFRD TABLE 3.8.7-1NO ICE LOADS OR GALLOPINGDESIGN AREA = AREA WITH MAXIMUM WIND LOAD (WIND IS PERPENDICULARTO STANDARD, AS SHOWN).DESIGN WEIGHT = DEAD LOAD.DESIGN ALL TYPE (A) LOWER SHAFTS FOR A = 40' AND A MOUNTING HEIGHT OF 45'.DESIGN ALL TYPE (B) LOWER SHAFTS FOR A = 60' AND A MOUNTING HEIGHT OF 45'.PROVIDE ANCHOR BOLTS CONFORMING TO ASTM F1554 OR EQUAL. GALVANIZE ANDTHREAD THE TOP END (12" MIN.).CALL OUT WELDING PROCEDURES, SYMBOLS, BASE METAL SPECIFICATIONS ANDGRADES PRIOR TO FABRICATION OR APPROVAL.GALVANIZE POLE SHAFTS, ARMS, AND ACCESSORIES PER ASTM A123. GALVANIZEHARDWARE PER ASTM F2329.DETAIL 4DETAIL 5CURBSIGNALPEDESTRIAN PUSHBUTTON SIGNTYPICAL ORIENTATION FOR PIPEBRACKET MOUNTED SIGNALSSIGNAL STANDARD TYPEDETAIL 345° (TYP.)5JHEA36 PLATEFLOWER SHAFT58"- 11 UNC - 212" A325 (TYP.)(TYP.)GCJPDETAIL 1SIGNAL ARM CONNECTIONUPPER SHAFTA36 PLATEA36 PLATE45° (TYP.)LOWER SHAFT34" PLATE13" SQ.15"34" PLATEDETAIL 2SHAFT TO SHAFTDETAIL 6114"214"34"- 10 UNC - 3" A325 (TYP.)10"1412"1" PLATE34" PLATE7"7"912"DETAIL 3LUMINAIRE ARM CONNECTIONCDLOWER SHAFTFOR GROUNDINGNOTEA HANDHOLE DETAILAND A NUT HOLDERB45° (TYP.)A36 PLATEDETAIL ARE REQUIRED.HANDHOLEAND COVERSLOT = ANCHOR BOLT + 14" (TYP.)18"12" NUT HOLDERCJP4" x 8"DETAIL 6BASESIGNAL MAST ARM2"612"1"*2*3, 3A ,3B ,3CDETAIL 5ARM TENONS212"612"*7DETAIL 4LUMINAIRE TENONDETAIL 1 & 2 *1, *1A, *1B, *2, *3, *3A, & *3B *1, *1A, *1B, *1C, *2, *3, *3A, *3B, & *3C*1B*1A*1C *1, *1A, *1B, & *1C3' 0"3' 0"3' 0"12' 0"12' 0"15' 0"*1A - *1CSIGNAL*3 - *3CSIGN PANEL2"2"2"2"7 12" DIA. HOLEIN BASE PLATEWATCH FORVEHICLESSTART CROSSINGDON'T STARTFINISH CROSSINGIF STARTEDDON'T CROSSTO CROSSPUSH BUTTONSTEADYFLASHINGTWISTLOCK TYPEPHOTO-ELECTRICCONTROLFIELD DRILL ANDTAP HOLE IN POLEFOR 1/2" PIPEINSTALLATION DETAIL FORPHOTO-ELECTRIC CONTROLCONDUIT OUTLETBODYSIGNAL POLE
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
E1.15BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
ELECTRICAL DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_ELEC_PROD.DWG
JHS
ONLYONLYONLY
DRBRIDGER
DRBRIDGERONLY25SPEEDLIMIT35SPEEDLIMIT
NEWD3-1 (OH)12"x60"NEWR3-5L (OH)30"x36"RDSTORY MILLNEWR3-5L (OH)30"x36"NEWD3-1 (OH)12"x60"RDSTORY MILLNEWR3-5L (OH)30"x36"NEWD3-1 (OH)12"x54"NEWD3-1 (OH)12"x54"NEWR3-5L (OH)30"x36"NEWR2-124"x30"NEWR4-1130"x30"NEWR3-830"x30"NEWR7-1L12"x18"NEWR7-1R12"x18"REMOVEW11-2W16-7PLUSE AS ISEX. R3-17EX. R3-17APREMOVEEX. (4)D3-1 EX.R1-1REMOVEW11-2W16-7PLRESETR2-1REMOVEEX. (4)D3-1 EX.R1-1RESETEX. D10-1NEWR3-1724"x12"FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.1BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHS NORTH1501530SCALE:1" = 30'
ONLYONLYDRBRIDGERONLYNEWD3-1 (OH)12"x60"NEWR3-5L (OH)30"x36"RDSTORY MILLNEWR3-5L (OH)30"x36"NEWD3-1 (OH)12"x54"NEWR3-5L (OH)30"x36"NEWR3-830"x30"NEWR7-1L12"x18"NEWR7-1R12"x18"NEWR7-1L12"x18"NEWR7-1R12"x18"REMOVEW11-2W16-7PLREMOVEEX. (4)D3-1 EX.R1-1RESETEX. D10-1USE AS ISDYNAMIC SPEEDSIGNUSE AS ISEX. R2-1RESET STORY MILLSIGN AND BENCHNEWR7-1L12"x18"NEWR7-1R12"x18"RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.2BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHS NORTH1501530SCALE:1" = 30'
NEWD3-1 (2) (10"x36")D3-1 (2) (10"x30")R1-1 (30"x30")Hillside LnStory MillRdHillsideLnNEWW11-2(30"x30")W16-7PL(24"x12")NEWW11-2(30"x30")W16-7PL(24"x12")NEWR1-5L(30"x30")NEWR1-1 (30"x30")RESET LAWSONSGREENHOUSE SIGNUSE AS ISCITY OF BOZEMANPARKS SIGNUSE AS ISEX. W11-15EX. W16-2ARESETEX. HISTORIC SIGNREMOVEEX. (2) D3EX. R1-1NEWR7-1R12"x18"NEWR7-1L12"x18"Story MillRdRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.3BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHSNORTH1501530SCALE: 1" = 30'
GriffinDrStory MillRdStory MillRdGriffin Dr
NEWD3-1 (2) (10"x36")D3-1 (2) (10"x30")R1-1 (30"x30")NEWR4-1130"x30"NEWW11-2(30"x30")W16-7PL(24"x12")NEWW11-2(30"x30")W16-7PL(24"x12")NEWR1-5L(30"x30")NEWR7-1L12"x18"NEWR7-1R12"x18"RESETEX. R12-1XREMOVE EX. D3 (2)RESET CITY-1USE AS ISEX. R2-1NEWR3-1724"x12"NORTHRECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.4BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHS 1501530SCALE: 1" = 30'WHITE FLEXIBLESURFACE-MOUNT DELINEATOR
REMOVEEX. W11-2 EX.W16-2AREMOVEEX. W11-2 EX.W16-2ARECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.5BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHS NORTH150SCALE: 1" = 30'1530
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.6BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHS BIKE LANE MARKING DETAIL SHARKS TOOTH MARKINGS DETAIL(TYPE "A" CROSSINGS)FOR PEDESTRIAN CROSSINGS
RECORD DRAWINGS
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
S1.7BOZEMAN, MONTANA
BRIDGER DRIVE TO GRIFFIN DRIVE RECONSTRUCTION,
STORMWATER AND INTERSECTION IMPROVEMENTS
STORY MILL ROAD
SIGNAGE & STRIPING DETAILS
20023.02
--
-
-
RECORD DRAWINGS
W. HILLSIDE REVISIONS
ADDED APPROACHES
FOR CONSTRUCTION
-
-
06/15/24
09/01/22
08/26/22
04/13/22
FOR BIDDING02/18/22
RRR/CMK/SNH
20023_S&S_PROD.DWG
JHS