Loading...
HomeMy WebLinkAbout027 - L 600 - Conceptual Irrigation PlanH2ODAYGPMPROPOSED IRRIGATION SCHEDULE1(MON)DURATIONMINUTESH2OINITIAL GPDH2OEST. GPDZONE1D2D5D6D7D8D9D11D12DTOTAL DAILYH2O INITIAL246.0 GALTOTAL DAILYH2O EST.120.0 GAL3(WED)5(FRI)6(SAT)7(SUN)SPRAY ZONES: SHALL BE OPERATED MULTIPLE TIMES PER DAY AT DISCRETION OF INSTALLERDURING ESTABLISHMENT PERIOD, NOT TO EXCEED A TOTAL OF 60 MINS PER ZONE. AFTERESTABLISHED REDUCE TIME IN HALF FOR EACH RUN TIME, AND ONLY WATER ON DAYSALLOWED BY CITY OF BOZEMAN WATERING RESTRICTIONS.NOTE:OVERHEAD SPRAY IRRIGATION CAN BE UTILIZED SEVEN (7) DAYS DURING THE 45 DAYESTABLISHMENT PERIOD. FOLLOWING THE 45 DAY ESTABLISHMENT PERIOD, OVERHEADSPRAY IRRIGATION SHALL BE USED IN ACCORDANCE TO THE CITY OF BOZEMAN WATERINGWINDOWS, DRIP IRRIGATION IS ALLOWED TO BE USED ANY DAY OF THE WEEK AS NEEDED PERCITY OF BOZEMAN WEBSITE:https://www.bozeman.net/departments/utilities/water-conservation/permanent-watering-restrictions.IF ESTABLISHMENT CANNOT BE MET AFTER THE FIRST 45 DAYS, AN EXEMPTION REQUESTFORM MUST BE SUBMITTED TO THE WATER CONSERVATION DIVISION FOR APPROVAL PERADMINISTRATIVE ORDER 2023-02 UPON SUBMISSION OF THE LANDSCAPE INSTALLATIONCERTIFICATE OF COMPLETION.IT IS THE DUTY OF THE OWNER AND MAINTENANCECONTRACTOR TO CONFORM TO ALL CITY OF BOZEMAN WATERING RESTRICTIONS..341.03NA1.45.96.731.141.61.953030NA30303030303051.25153.75NA217.50143.75108.75171.25241.25142.501545NA6342305172421D2D5D6D7D8D9D11D12D246.0 GAL120.0 GAL.341.03NA1.45.96.731.141.61.953030NA30303030303051.25153.75NA217.50143.75108.75171.25241.25142.501545NA6342305172421D2D5D6D7D8D9D11D12D246.0 GAL120.0 GAL.341.03NA1.45.96.731.141.61.953030NA30303030303051.25153.75NA217.50143.75108.75171.25241.25142.501545NA6342305172421ST2S3S4S3DT4DT10DT13DT486 GAL241 GAL5.129.07NA3.14.40.33.60.073020NA2060606060153.6181.4NA62.82420364.07690NA3112101821D2D5D6D7D8D9D11D12D246.0 GAL120.0 GAL.341.03NA1.45.96.731.141.61.953030NA30303030303051.25153.75NA217.50143.75108.75171.25241.25142.501545NA634230517242ZONE 5D IS WITHIN BUILDINGFOOTPRINT AND EXEMPT FROMIRRIGATION REQUIREMENTS.ZONE 3S IS WITHIN BUILDINGFOOTPRINT AND EXEMPT FROMIRRIGATION REQUIREMENTS.ZONE 1ST IS TEMPORARY ZONE.SEE NOTE ON L601.6(SAT)1ST2S3S4S3DT4DT10DT13DT486 GAL241 GAL5.129.07NA3.14.40.33.60.073020NA2060606060153.6181.4NA62.82420364.07690NA3112101826(SAT)1ST2S3S4S3DT4DT10DT13DT486 GAL241 GAL5.129.07NA3.14.40.33.60.073020NA2060606060153.6181.4NA62.82420364.07690NA311210182Irrigation Notesand SchedulesL 600design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\brick capital block 104\autocad\01_sheets\block104-south_irrigation.dwg Block 104 South Building Bozeman, Montana AVD TMS/AVD 09/26/23SD / Pre-App02/28/24Site Plan Review03/13/24100% DD05/28/24Coordination08/22/24SP RC 109/04/24SP RC 1 REV1WATER BUDGET CALCULATIONSPRESSURE LOSS CALCULATIONS