Loading...
HomeMy WebLinkAbout014.01 - C0.3 - SEQUENICING AND CONSTRUCTION FACILITY PLANBLO C K 1 0 4 B L O C K 1 0 2 GASGASGASGASOHCOHCOHCOHCOHCOHCOHCOHCOHCOHCOHCWW[][][][][][][][][][][][][]OHEOHEOHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEE. ASPEN STREETIDA AVENUE FRONT STREETALLEYTAMARACK STREET[][][][][][][][][][] [][][][][][][][][]OHEOHEOHEOHEOHEOHEOHE O H E OHECOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMTFUGCCOMMCOMMSSSSOHEOHEOHEOHEOHEOHEUGEUGEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSD SDSDSDSDSDSDSDSDSDSDSDSDGASGASGASGASGASGASGASGASGASGASGASIRIRIRSSSSSSSSSSSSSSSSSSSSSSWSSSSOHCOHCLOTS 7-16, BLOCK 104[PLAT C-23-A49]LOTS 17-26, BLOCK 104[PLAT C-23-A49]WO H E O H E O H E O H E WWWWSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGASGASGASGASGASBLOCK 104 CONCURRENT CONSTRUCTIONSEQUENCE:THIS WORK SEQUENCE IS TO PROVIDE GENERALGUIDANCE FOR CONCURRENT CONSTRUCTIONCONSTRAINTS OF ON-SITE AND OFF-SITEIMPROVEMENTS. THE GENERAL CONTRACTOR TOPROVIDE A MORE DETAILED SEQUENCING PLANTHAT FOLLOWS THIS GENERAL GUIDANCE.1.DEMO EXISTING ON-SITE IMPROVEMENTS,UTILITIES, AND FENCE SITE.2.EXCAVATE FOUNDATION, BACKFILL, STARTBUILDING VERTICAL3.CONSTRUCT OFF-SITE PIPING, BUILDINGSERVICES AND GRAVEL ROAD BASE.4.RELOCATE FRANCHISE UTILITIES.5.COMPLETE VERTICAL BUILDINGCONSTRUCTION AND EXTERIOR.6.ON-SITE STORM DRAINAGE.7.ON-SITE FRANCHISE UTILITY SERVICES.8.OFF-SITE STORM DRAINAGE, LIGHTING ANDSURFACING.9.ON-SITE SURFACING AND LANDSCAPING.10.COMPLETE BUILDING INTERIOR.1 9/19/2023 CONCEPT PLAN CDP ZWL 2 10/11/2023 SD SUBMITTAL CDP ZWL 3 2/23/2024 SITE PLAN SUBMITTAL CDP ZWL 4 3/13/2024 DD SET CDP ZWL 5 8/23/2024 SITE PLAN RC1 CDP ZWL PROFESSIONALENGINEERS &SURVEYORSBOZEMAN YARDS SOUTH 805 N. IDA AVE STAHLYENGINEERING& ASSOCIATESJACKADOO LLC BOZEMAN, MTC0.3SEQUENCING &CONSTRUCTIONFACILITIES PLAN