HomeMy WebLinkAbout014.01 - C0.3 - SEQUENICING AND CONSTRUCTION FACILITY PLANBLO
C
K
1
0
4
B
L
O
C
K
1
0
2 GASGASGASGASOHCOHCOHCOHCOHCOHCOHCOHCOHCOHCOHCWW[][][][][][][][][][][][][]OHEOHEOHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEE. ASPEN STREETIDA AVENUE FRONT STREETALLEYTAMARACK STREET[][][][][][][][][][]
[][][][][][][][][]OHEOHEOHEOHEOHEOHEOHE
O
H
E
OHECOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMTFUGCCOMMCOMMSSSSOHEOHEOHEOHEOHEOHEUGEUGEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSD SDSDSDSDSDSDSDSDSDSDSDSDGASGASGASGASGASGASGASGASGASGASGASIRIRIRSSSSSSSSSSSSSSSSSSSSSSWSSSSOHCOHCLOTS 7-16, BLOCK 104[PLAT C-23-A49]LOTS 17-26, BLOCK 104[PLAT C-23-A49]WO
H
E
O
H
E
O
H
E
O
H
E
WWWWSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGASGASGASGASGASBLOCK 104 CONCURRENT CONSTRUCTIONSEQUENCE:THIS WORK SEQUENCE IS TO PROVIDE GENERALGUIDANCE FOR CONCURRENT CONSTRUCTIONCONSTRAINTS OF ON-SITE AND OFF-SITEIMPROVEMENTS. THE GENERAL CONTRACTOR TOPROVIDE A MORE DETAILED SEQUENCING PLANTHAT FOLLOWS THIS GENERAL GUIDANCE.1.DEMO EXISTING ON-SITE IMPROVEMENTS,UTILITIES, AND FENCE SITE.2.EXCAVATE FOUNDATION, BACKFILL, STARTBUILDING VERTICAL3.CONSTRUCT OFF-SITE PIPING, BUILDINGSERVICES AND GRAVEL ROAD BASE.4.RELOCATE FRANCHISE UTILITIES.5.COMPLETE VERTICAL BUILDINGCONSTRUCTION AND EXTERIOR.6.ON-SITE STORM DRAINAGE.7.ON-SITE FRANCHISE UTILITY SERVICES.8.OFF-SITE STORM DRAINAGE, LIGHTING ANDSURFACING.9.ON-SITE SURFACING AND LANDSCAPING.10.COMPLETE BUILDING INTERIOR.1 9/19/2023 CONCEPT PLAN CDP ZWL
2 10/11/2023 SD SUBMITTAL CDP ZWL
3 2/23/2024 SITE PLAN SUBMITTAL CDP ZWL
4 3/13/2024 DD SET CDP ZWL
5 8/23/2024 SITE PLAN RC1 CDP ZWL PROFESSIONALENGINEERS &SURVEYORSBOZEMAN YARDS SOUTH
805 N. IDA AVE STAHLYENGINEERING& ASSOCIATESJACKADOO LLC
BOZEMAN, MTC0.3SEQUENCING &CONSTRUCTIONFACILITIES PLAN