HomeMy WebLinkAbout012.03 - C2.1 - EXISTING TOPOGRAPHY AND DEMOSP2 SUBMITTAL
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
NORTHERN PACIFIC ADDITION, S 06, T 02 S, R 06 E BLOCK 104, LOT 7-16, 17-26
EXISTING TOPOGRAPHY AND REMOVALS
BOZEMAN YARDS
OFFSITE IMPROVEMENTS
BOZEMAN, MTC2.1EC
06020_11_EX CONDITIONS_PROD.DWG
CE
8/20/24 SP2 SUBMITTAL
-
-
-
-
-
-
-
-
-
-
-
-
--
06020.11NORTHVERTICAL SCALE: 1"=5'30150HORIZONTAL SCALE:1" = 30'3060SITE DEMOLITION NOTES:1.ALL LOCATIONS AND DIMENSIONS OF EXISTING AND PROPOSED FEATURES ARE APPROXIMATE AND THE PROJECT DRAWINGS MAY NOTINCLUDE ALL EXISTING FEATURES WITHIN THE PROJECT BOUNDARIES. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE SITE PRIOR TOBIDDING AND CONSTRUCTION TO BECOME FAMILIAR WITH THE EXISTING SITE FEATURES AND CONDITIONS. IF DISCREPANCIES ARE FOUNDBETWEEN THE PROJECT DRAWINGS AND FIELD CONDITIONS THE CONTRACTOR SHALL CONTACT THE PROJECT ENGINEER FORCLARIFICATION.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS NECESSARY TO COMPLETE THE PROPOSED WORKINCLUDING DEMOLITION, RIGHT-OF-WAY AND ENVIRONMENTAL PERMITS.3.ALL EXISTING POWER, NATURAL GAS AND TELECOMMUNICATION SERVICES TO THE EXISTING BUILDINGS TO BE DISCONNECTED. ALLOVERHEAD POWER SERVICE LINES TO BE REMOVED BACK TO MAIN LINE.4.ALL PUBLIC AND PRIVATE UTILITY TERMINATIONS, DISCONNECTS AND REMOVALS TO BE COORDINATED WITH THE APPLICABLE UTILITYPROVIDERS AND PERFORMED IN ACCORDANCE TO THEIR RESPECTIVE STANDARDS AND SPECIFICATIONS.5.ALL REMOVED, DISTURBED OR DAMAGED EXISTING ASPHALT, CURB AND GUTTER, PUBLIC SIDEWALK AND PAVEMENT MARKINGS WITHIN THEPUBLIC RIGHT-OF-WAY TO BE RESTORED IN ACCORDANCE TO CITY STANDARDS. ALL ASPHALT MATCH LINES SHALL BE SAW CUT TO PROVIDEFLUSH TRANSITION.6.ALL EXISTING UNDERGROUND PIPE SHALL BE ABANDONED IN PLACE UNLESS OTHERWISE NOTED. ALL SEVERED PIPE ENDS ABANDONED INPLACE SHALL BE PLUGGED WITH WATER TIGHT CAPS. ANY EXISTING PIPING WITHIN THE PROPOSED BUILDING AREA SHALL BE REMOVED &DISPOSED.7.ALL EXCAVATIONS OR VOIDS CREATED DURING DEMOLITION SHALL BE BACKFILLED AND COMPACTED IN A CONTROLLED MANNER.8.CONTRACTOR TO PROCURE ANY AND ALL NECESSARY TEMPORARY CONSTRUCTION EASEMENTS OR OTHER LEGAL MEANS NECESSARY ON ANYPRIVATE PROPERTY TO INSTALL THE PROPOSED IMPROVEMENTS AND PERFORM ANY NECESSARY COORDINATION FOR OPERATIONAL ORBUSINESS CLOSINGS/OPENINGS OF ADJACENT BUSINESSES.9.REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE SHALL BE COMPLETED AS INSTRUCTED BY WESTON SOLUTIONS, INC. AND INCOMPLIANCE WITH ALL PERTINENT REGULATING BODIES.MONTANAPROFESSIONAL ENG
INEERLICENSED JOHN CHASEEATONNo. 76203 PE8/20/2024012.03