HomeMy WebLinkAbout049 - ES105 - SITE WEST ELEVATION Energy 1
MEP I ENGINEERING
2042 STADIUM DRIVE
SUITE 2
BOZEMAN,MT 59715
PHONE:(406)587-2917
PRELIMINARY
NOT FOR
CONSTRUCTION
PROJECT CODE
MBE
-tOJECT NAME
MILLER
BLOCK B
CONDOMINIUMS
PROJECTADDRESS
EAST BABCOCK
STREET
BOZEMAN,MONTANA
59715
DRAWING ISSUED FOR
SITE PERMIT
RESUBMISSION
DRAWING ISSUE DATE
08/16/2024
,�n,DRAWING REVISIONS
LIGHT ON WALL RECESSED LIGHT IN COLUMN
LIGHT ON OLUMN BEHIND DOWNLIGHT TYPE FACE
f�F COLONNADE SILLDIRECT SCONCE
TYPE XS-15
N p � , xDcu 'icai
0 A
RECESSED LIGHT
TYPE XR-R1
O-
E':;�SS NDD De�S� •1�' • 'DBMENS• - + 05 MD LURE 5 �OS w"
WEST ELEVATION PHOTOMETRICS PHOTOMETRIC NOTES:
SCALE:1/8"= P-0"
ELEVATIONS:
Calculation points are measured on the Building Facade,on a 5'x 5'grid
Calculation Summary
Label Avg Max Min Avg/Min Max/Min
West Elev Bas Lvl Wall Side 0.03 0.2 0.0 N.A. N.A.
Front5
West Elev Columns_1_1_1_Side_ 0.27 0.6 0.0 N.A. N.A.
Front5
West Elev Columns_1_1_Side_ 1.30 3.7 0.0 N.A. N.A.
Front5
West Elev Columns_1 Side Front5 0.50 1.3 0.0 N.A. N.A.
West Elev Columns Side BacW 0.00 0.0 0.0 N.A. N.A.
SHEET NAME
SITE WEST
ELEVATION
SHEETNUMBER
ES105