Loading...
HomeMy WebLinkAbout044 - ES100 - SITE LIGHTING PLANXR-R1 XR-R1 XR-R1 XD-R1 XD-R1 XD-R1 XD-R1 XR-R1 XR-R1 XS-15 XS-15 XS-15 XS-15 XD-R1 XD-R1 XD-R1 XW-R9 XW-R9 XW-R9 XW-R9 XW-R9 XR-R1 XR-R1 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XS-15 XD-R1 XD-R1 XR-R1 XR-R1 LP-1 LP-1LP-1 XW-R9 XR-R1 XR-R1 PROPERTY LINE A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. C. CONTRACTOR IS FULLY RESPONSIBLE FOR FOLLOWING ALL APPLICABLE CODES AND STANDARDS, AS WELL AS ALL LOCAL ADDENDUM TO THOSE CODES AND STANDARDS, WHETHER SPECIFICALLY SHOWN ON THESE DRAWINGS OR NOT. GENERAL ELECTRICAL NOTES: SHEET NUMBER PROJECT CODE PROJECT ADDRESS ARCHITECT RETAINS COPYRIGHT TO THESE DRAWINGS. DRAWINGS ARE ONLY FOR USE FOR PROJECT NAMED ON DRAWING SHEET AND MAY NOT BE REPRODUCED OR USED FOR OTHER PURPOSES WITHOUT WRITTEN PERMISSION FROM ARCHITECT. PRELIMINARY NOT FOR CONSTRUCTION 2042 STADIUM DRIVE SUITE 2 BOZEMAN, MT 59715 SHEET NAME PROJECT NAME DRAWING REVISIONS DRAWING ISSUE DATE DRAWING ISSUED FOR PHONE: (406) 587-2917 Autodesk Docs://MBE - Miller Global East Babcock/MBE - Block B Condominium Building MEP R24.rvt8/16/2024 1:18:00 PMES100 MBE MILLER BLOCK B CONDOMINIUMS SITE LIGHTING PLAN EAST BABCOCK STREET BOZEMAN, MONTANA 59715 SITE PERMIT RESUBMISSION 08/16/2024 1/8" = 1'-0"ES100 1 SITE LIGHTING PLAN KEYED NOTES :#