Loading...
HomeMy WebLinkAbout040 - L 601 - Level 2 Irrigation PlanBFCPAMUAMUAMUAMUAMUAMUAMUAMUPROVIDE SELFDRAINING IRRIGATIONCONNECTION ATROOF DECKGREEN ROOF TO BE IRRIGATEDWITH H.E. SPRAY IRRIGATION SYSTEM.GREEN ROOF TO DRAIN TO AREA DRAINSALL PLANTERS TO BE IRRIGATED WITH DRIPRUNNING UNDER ROOF BALLAST ANDGREEN ROOF TRAYS. PLANTERS. TO DRAINUNDERNEATH TRAYS AND FLOW TO ROOFTO AREA DRAINSIRRIGATIONTYPEIRRIGATION SCHEDULE -LEVEL 2TOTALAREA / QTY128PERENNIALSH.E.PERENN.DRIP IRRIG.2,500 SFH.E. GREEN ROOF SPRAY IRRIGATION 8 TREESH.E. TREEBUBBLERNLevel 2IrrigationPlanL 602design5la.com406.587.4873dateissue05/21/24SP1drawn by:checked by:filename:z:\mbe_block b\autocad\01_sheets\l600_mbe-blockb_irrigation.dwg Block B Condominium Building East Babcock Street Bozeman, Montana NB/GO TMS 108/15/24SP209/27/24SP2 Rev. 1NOTE1.ROOF DECK IRRIGATION ISLOCATED WITHIN THE BUILDINGFOOTPRINT AND IS THEREFOREXEMPT FROM CITY OFBOZEMAN IRRIGATION PLANREQUIREMENTS.2.ROOF DECK IRRIGATION PLANWILL BE COORDINATED WITHROOF DECK INSTALLER ANDWILL UTILIZE WATERCONSERVATION BESTPRACTICES.1050201L6021"=10'-0"Irrigation Plan