September 23, 2024
Suzanne Ryan
City of Bozeman Engineering Department
PO Box 1230
Bozeman, MT 59771
Email: sryan@BOZEMAN.NET
RE: ROUSE BLOCK B CONDOMINIUM BUILDING
DRIVEWAY SEPARATION MODIFICATION REQUEST
TD&H ENGINEERING JOB NO. B23-048
Dear Suzanne,
Please find below, our justification for a modification to the City of Bozeman 40-foot
driveway spacing requirement. Due to existing built conditions, adjacent property accesses
to the east and the west, and the design requirements outlined for Block Frontage
Standards in the UDC Section 38.510.030.M We are unable to meet the required 40-foot
driveway spacing standard and therefore request a modification.
The block frontage standards in the UDC Section 38.510.030, specifically mention section
M.2.m, that requires the entrance to the parking areas must not be located central to the
building. When you couple this with narrow adjacent lots and the existing built drive access
entrances to the east and west of the project, there would be no opportunities to place a
drive access for this building. The drive access has been placed adjacent to the access
with the least amount of peak hour trips.
Modification from Access Standards Discussion
a. Traffic Volume:
Peak hour traffic volumes for Babcock Street south of the Block B
Condominium project were provided in the project traffic study and are
summarized below.
Peak AM Peak PM
Existing Conditions (2024) 240 316
Full Buildout (2027) 250 328
Future (2039) 299 393
Only 22 vehicles are anticipated to enter or exit the garage during the AM
peak hour and 25 vehicles are anticipated to enter or exit the garage
during the PM peak hour. The existing single family residential driveway
directly to the east of the proposed parking garage access that does not
meet the 40-foot separation has only one AM and one PM peak hour trip
9/23/2024
September 23, 2024 PAGE NO. 2
tdhengineering.com
based on the ITE Trip Generation Manual. This limits the potential for
conflict between the driveways.
b. Turning Movements:
Babcock Street is a two-lane, one-way street running west to east. All
turn movements into the parking garage and adjacent residential
driveway are left turns in and left turns out. Traffic conflict is reduced as a
result of only one possible turn movement. Additionally, the project
consolidates three driveway accesses into one, reducing the number of
conflict points along this stretch of Babcock Street.
c. Traffic Control
The proposed new access is a commercial driveway which does not
require stop signs or other traffic control as stop control is implied for
driveways. Traffic control is not proposed or typical for type of approach.
An audible sound will be used in conjunction with the parking garage door
to warn pedestrians when the door is opening and traffic is present.
d. Site Design
The Rouse Block B Condo site is primarily composed of the building
footprint. A zero lot line frontage is proposed along Babcock Street with a
11.5-foot wide curbwalk style sidewalk between the building and street.
Plantings will be installed in front of the building behind the curb. Planting
will not be placed in the parking garage vision triangle.
e. Sight Distance
Babcock Street adjacent to the site is a local street with a 25 mph design
speed. The parking garage access meets the City of Bozeman sight
vision triangle requirements. The parking garage access is located
directly upgradient of the traffic flow from the residential parking access
that is within a 40-foot distance. Analysis of the parking garage access’s
proximity to the residential driveway was completed to determine if a
stopped car waiting to turn left onto Babcock Street would affect the City
of Bozeman sight vision triangle for the residential access. It was
determined that a parked car waiting to turn left onto Babcock Street will
not affect the sight vision triangle of the residential parking lot allowing
users of this driveway the minimum required site distance per the City of
Bozeman code. The residential site vision triangle for the residential lot
can be seen on sheet C3.1 in the site plan.
f. Location and Alignment of Other Access Points
The residential access east of the project is located 25 feet from the
existing residential parking garage access. Due to City of Bozeman code
requirements and parking garage ramp logistics, it is not feasible to place
the parking garage access central to the building. In addition, an existing
alley is located south of the proposed project at roughly the central point
September 23, 2024 PAGE NO. 3
tdhengineering.com
of the building that is more critical to maintain minimum code separation
distance. Placing the parking garage access on the west end of the
building would result in a similar setback condition from the parking lot
west of the project which generates more peak hour trips and creates
more potential conflicts. Given there are existing approaches directly west
of the building (parking lot), central to the building (alley), and east of the
building (residential driveway), the project has placed the garage access
at the point of least potential conflict based the limited peak hour trips and
use.
Please feel free to contact me with any questions.
Sincerely,
Kyle Scarr PE
Regional Manager
TD&H ENGINEERING