Loading...
HomeMy WebLinkAbout24 - Amendments Amendment Number Unknown - A&E Design - Expand Sope of Work to include Signage Design Proposal Third Amendment to Professional Architectural Services Agreement for Architectural Services – City Hall Renovation FY 2024 – FY 2026 Page 1 of 2 THIRD AMENDMENT TO PROFESSIONAL ARCHITECTURAL SERVICES AGREEMENT THIS THIRD AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Architectural Services – City Hall Renovation dated October 24, 2023 (the “Agreement”) is made and entered into this _____ day of ____________, 2024, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” and A&E Design, 515 W Aspen St., Bozeman, MT 59715, hereinafter referred to as “Contractor.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1. Scope of Work: Section 3 of the Agreement is amended to expand the project’s scope to include a signage design proposal attached hereto as Exhibit A and a proposal for additional design services attached hereto as Exhibit B. 2. Payment: Section 4 of the Agreement is amended to include costs associated with expansion of project scope as attached hereto as Exhibit A and Exhibit B. 3. Agreement still valid. All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** Docusign Envelope ID: DCB35A0F-8B91-46A5-A734-FA7E58358A4B 1st October Third Amendment to Professional Architectural Services Agreement for Architectural Services – City Hall Renovation FY 2024 – FY 2026 Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA A&E DESIGN By________________________________ By_____________________________ Chuck Winn, Interim City Manager Print Name: Title: APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney Docusign Envelope ID: DCB35A0F-8B91-46A5-A734-FA7E58358A4B Brad Doll ArchitectJon Henderson Acting City Manager Signage Design Proposal 1 A&E Design 515 West Aspen Street Bozeman, MT 59715 ae.design August 1, 2024 Jon Henderson Strategic Services Director 20 East Olive Street Bozeman, MT 59715 Via email: jon.henderson@bozeman.net RE: Bozeman City Hall Signage Dear Jon, Thank you again for the opportunity to collaborate further with you on the Bozeman City Hall Renovation to help manage and design the signage package for this project. Scope: 1. Code/ADA Signage a. Room Signs b. Exit Signs c. Office Signs d. Evacuation Maps e. Restroom Signs 2. Wayfinding Signage a) Wall and ceiling mounted directional signage b) Level directory c) Building directory d) Amenity identification e) Department identification Schematic Development – Planning the Space During this phase, we’ll document all the existing signage and locations to help identify opportunities for new signage location and styles. This first phase will identify best locations for signage, as well as the initial style, colors, etc. for your review. Deliverables • Schematic Signage Floor Plan • Schematic Materials, Finishes, and Colors Exhibit ADocusign Envelope ID: DCB35A0F-8B91-46A5-A734-FA7E58358A4B Signage Design Proposal 2 Design Development – Planning the Space During this phase, we’ll provide a conceptual signage design to arrive at the best possible solution that blends the interior design and signage into a cohesive design that meets the space plan and goals for wayfinding. Deliverables • Further development of signage plan • Material and design options for specific signs (primarily wayfinding signs). Construction Documents – How It All Goes Together We’ll create drawings and schedules that describe in technical detail your project goals. This includes final FF&E plans with placement, materials, and equipment needed for the FF&E design completion and ability to procure from an outside vendor. We will continue to work with this outside vendor during this phase, managing the selection and design process for you. Deliverables • Final Signage Plan – Fully incorporated design intent along with placement and dimensions as required. • Final Materials, Finishes, and Colors Construction Administration – Procurement and Installation Our team offers in-house Construction Administration services, which reduces the potential for errors and miscommunication and ensures the project is completed on schedule and within budget. This service provides consistency between the design team, contractor, furniture vendor, and owner to preserve the design intent and ensure construction quality. From schedule review to coordination of specific materials and equipment, we verify all project requirements are met. Deliverables This proposal includes: • Management and review during signage installation. • Provide review of site deliverables to ensure quality, schedule, and final placement. Total Fee: $16,100 We are excited to help make your ideas into reality. Thank you for this opportunity! Sincerely, Emma Survis AIA Docusign Envelope ID: DCB35A0F-8B91-46A5-A734-FA7E58358A4B Our Proposal 1 A&E Design 515 West Aspen Street Suite 200A Bozeman, MT 59715 ae.design 9/12/24 Jon Henderson City of Bozeman Bozeman, MT 59715 RE: Bozeman City Hall Renovation Additional Services Dear Jon, Per our discussion on September 10, 2023, this proposal outlines the additional scope of services for the revised design of City Hall: • Reconfigure the City Manager’s office to be one large open office space with a specially defined reception space and 4 workstations, as well as a printer/copy area. To include changes to the architectural, mechanical, and electrical design. • Revise drawings to include the windows in the base bid scope, rather than as an Alternate. Fee Proposal The fee for this additional service is $5,500. Sincerely, Emma Survis AIA Project Manager Exhibit BDocusign Envelope ID: DCB35A0F-8B91-46A5-A734-FA7E58358A4B