Loading...
HomeMy WebLinkAbout062 C SP101-CARPORT A FP, RPAA AA AD AD AC AC AB AB A1 A1 A3 A3 A2 A2 1 28' - 6"28' - 6"28' - 6"STALL 01 STALL 02 STALL 04 STALL 05 STALL 06 STALL 07 STALL 08 STALL 09 STALL 10 STALL 11 STALL 12 STALL 13 STALL 14 STALL 15 STALL 16 STALL 18 NOTE: INFORMATION IS SYMMETRICAL 16' - 0"16' - 0" 32' - 0" C SP201 3 C SP2012 C SP201 1 C SP201 4 STALL 03 85' - 6"3 2 1 4 STALL 17 2 2 AA AA AD AD AC AC AB AB A1 A1 A3 A3 A2 A2 1 1' - 0" TYP.1" / 12"1" / 12" C SP201 3 C SP2012 C SP201 1 C SP201 4 3 2 1 4 ROOFING MATERIALS 22 GUAGE PREFINISHED " MULTI-COR" CORRUGATED METAL ROOF TYPE SCHEDULE CONSTRUCTION ASSEMBLY DETAIL TYPE R1 ROOFING, SEE ROOF PLAN TYPICAL ROOF SYSTEM PRIMED & PAINTED STEEL BEAM, SEE STRUCTURAL PRIMED & PAINTED STEEL BEAM, SEE STRUCTURAL Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2023 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTSAutodesk Docs://Nistler Fowler Subdivison/NION_CARPORT NISTLER FOWLER.rvt2305 C SP101 CARPORT A FLOOR PLAN, ROOF PLAN, & ASSEMBLIES CONSTRUCTION DOCUMENTS DATE:RANGE 5 - CARPORTBOZEMAN, MONTANA0'1'5'10'20'30' SCALE:1/8" = 1'-0"1 SP -CARPORT A FLOOR PLAN FLOOR PLAN KEYED NOTES NOTE NUMBER NOTE DESCRIPTION 1 ROOF OUTLINE 2 CURB - SEE CIVIL SCALE:1/8" = 1'-0"2 SP -CARPORT A ROOF PLAN ROOF PLAN KEYED NOTES NOTE NUMBER NOTE DESCRIPTION 1 GUTTER TO DOWNSPOUT, TYP. @ LOW EAVES REVISION SCHEDULE No. Description DateNAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T A BECHTLE ARCHITECTS