Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
000 SP000-COVER SHEET
LIST OF ABBREVIATIONSAP ACCESS PANELACT ACOUSTIC CEILING TILEALT ALTERNATEAB ANCHOR BOLT∠ANGLEAPPD APPROVEDAPPR APPROXIMATEARCH ARCHITECTURALASPH ASPHALT@ ATAVE AVERAGEBM BEAMBRG BEARINGBM BENCH MARKBLKG BLOCKINGBD BOARDBS BOTH SIDESBOT BOTTOMBRK BRICKDS DOWN SPOUTD DRYEREA EACHE EASTELEC ELECTRICEL ELEVATIONEQ EQUAL EQUIP EQUIPMENTEXIST EXISTINGEXT EXTERIORFT FEETFIN FINISHFF FINISHED FLOORFE FIRE EXTINGUISHERFIX FIXTUREFL FLOORFD FLOOR DRAINFT FOOTFTG FOOTINGMATL MATERIALMAX MAXIMUMMTL METALMIN MINIMUMMISC MISCELLANEOUSMOD MODULARMECH MECHANICALNOM NOMINALN NORTHNTS NOT TO SCALENO NUMBEROC ON CENTEROPNG OPENINGOPP OPPOSITEOVHD OVERHEADPTD PAINTEDPNL PANELPTN PARTITIONPERM PERMANENTSERV SERVICESHT SHEETSHTHG SHEATHINGSIM SIMILARS SOUTHSPEC SPECIFICATIONSQ SQUARESTD STANDARDSTL STEELSTG STORAGESTRUCT STRUCTURALSYS SYSTEMTHRU THROUGHT&G TONGUE AND GROOVETR TREADTYP TYPICALUNO UNLESS NOTED OTHERWISEVIF VERIFY IN FIELDVP VENT PIPEBLDG BUILDINGCAB CABINETCLG CEILINGCL CENTER LINECC CENTER TO CENTERCER CERAMICCIR CIRCLECLR CLEARCOL COLUMNCONC CONCRETECMU CONCRETE MASONRY UNITCONST CONSTRUCTIONCONT CONTINUECT CERAMIC TILEDP DAMP ROOFINGDIA DIAMETERDIM DIMENSIONDW DISHWASHERDN DOWNFND FOUNDATIONGALV GALVANIZEDGA GAGEGL GRADELINEGWB GYPSUM WALL BOARDHDWD HARDWOODHT HEIGHTHOR HORIZONTALHB HOSE BIBIN INCHINSUL INSULATIONINT INTERIORJT JOINTJST JOISTLAM LAMINATELAV LAVATORYLG LENGTHLT LIGHTMFG MANUFACTURINGPERP PERPENDICULARPL PLATEPLMB PLUMBINGPT POINTLBS POUNDSPSI POUNDS PER SQUARE INCHPREFAB PREFABRICATEDQTY QUANTITYR RADIUSREF REFRIGERATORREG REGISTERREINF REINFORCEREQD REQUIREDREV REVISIONR RISERRFG ROOFINGRM ROOMSCHED SCHEDULESECT SECTIONVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDWTP WATERPROOFINGWP WEATHERPROOFWH WEEPHOLEWT WEIGHTW WESTW WIDTHWDW WINDOWWG WIRE GLASSW/O WITH OUTWD WOODWM WASHING MACHINEPROJECT DIRECTORYOWNER/ DEVELOPER: 2B HOLDINGS LLC7555 S COTTONWOOD RD.BOZEMAN, MT 59718(406) 599-9124CONTACT: MATT HAUSAUERARCHITECT:BECHTLE ARCHITECTS4515 VALLEY COMMONS DRIVE #201BOZEMAN, MT 59718(406) 585-4161CONTACT: SCOTT BECHTLEGENERAL CONTRACTOR:TBDCIVIL ENGINEER:WHITE MOUNTAIN ENGINEERING, LLC439 BUCKSKIN RDBELGRADE, MT 59714(406) 595-1923CONTACT: ETHAN COTESTRUCTURAL ENGINEER:VANTAGE ENGINEERING5 WEST MENDENHALL ST, SUITE 202BOZEMAN, MT 59715(406) 750-9339CONTACT: MAX JOHNSONELECTRICAL ENGINEER:THREE RIVERS ENGINEERING, INC24 WILLSON ST A1BOZEMAN, MT 59715(406) 582-8288CONTACT: JOHN TETRAULTMECHANICAL ENGINEER:THREE RIVERS ENGINEERING, INC24 WILLSON ST A1BOZEMAN, MT 59715(406) 582-8288CONTACT: JOHN TETRAULTLANDSCAPE ARCHITECT:OUTDOOR DESIGN STUDIOS3084 THORPE RDBELGRADE, MT 59714(406) 924-8038CONTACT: CHAD REMPFERFIRE SPRINKLER ENGINEER:COFFMAN ENGINEERS751 OSTERMAN DRIVE, SUITE 104BOZEMAN, MT 59715(406) 582-1936CONTACT: ROBERT BLAKEMANACOUSTICAL ENGINEER:BIG SKY ACOUSTICSPO BOX 27HELENA, MT 59624(406) 457-0407CONTACT: SEAN CONNOLLYA1011SIMAROOM TAGWINDOW NUMBERDOOR NUMBERDETAIL CALLOUTPLAN NOTEGRID HEADNORTH ARROWPROJECT SYMBOLSSECTION HEADWALL SECTION HEADSPOT ELEVATION1A101SIM1A101SIMROOM NAME101Wx1XXXPARKING SUMMARYTOTAL PARKING REQUIRED (2 PER UNIT)UNIT COUNT FACTOR TOTAL REQUIRED NOTES312 2 624 13 ADA STALLS REQ. (2%)TOTAL PARKING PROVIDEDLOCATION # OF STALLSSTANDARD ON-SITE UNCOVERED 352 INCLUDES 11 ADA STALLS & 6 ELECTRIC VEHICLE STALLSCARPORTS 149 INCLUDES 3 ADA STALLSGARAGES 44 INCLUDES 4 ADA STALLSON-STREET 98COMPACT STALLS 12TOTAL PROVIDED (INCL. ADA STALLS) 655 18 ADA STALLS PROVIDEDPARKING BY PHASEPHASE 1 REQUIRED (2 PER UNIT)UNIT COUNT FACTOR TOTAL REQUIRED NOTES24 2 48 0.96 ADA STALLS REQ. (2%)PHASE 1 PROVIDEDLOCATION# OF STALLSSTANDARD ON-SITE UNCOVERED 47 INCLUDES 1 ADA STALL & 2 ELECTRIC VEHICLE STALLSCOMPACT ON-SITE UNCOVERED 12CARPORTS 23 INCLUDES 1 ADA STALLGARAGES 0ON-STREET 54TOTAL PROVIDED (INCL. ADA STALLS) 136 2 TOTAL ADA STALLS PROV.PHASE 2 REQUIRED (2 PER UNIT)UNIT COUNT FACTOR TOTAL REQUIRED NOTES72 2 144 2.88 ADA STALLS REQ. (2%)PHASE 2 PROVIDEDLOCATION# OF STALLSSTANDARD ON-SITE UNCOVERED 49 INCLUDES 1 ADA STALL CARPORTS 0GARAGES 11 INCLUDES 1 ADA STALLON-STREET 0TOTAL PROVIDED (INCL. ADA STALLS) 60 2 TOTAL ADA STALLS PROV.PHASE 3 REQUIRED (2 PER UNIT)UNIT COUNT FACTOR TOTAL REQUIRED NOTES108 2 216 4.32 ADA STALLS REQ. (2%)PHASE 3 PROVIDEDLOCATION# OF STALLSSTANDARD ON-SITE UNCOVERED 97 INCLUDES 4 ADA STALLSCARPORTS 89 INCLUDES 1 ADA STALLGARAGES 11 INCLUDES 1 ADA STALLSON-STREET 34TOTAL PROVIDED (INCL. ADA STALLS) 231 INCLUDES 6 ADA STALLSPHASE 4 REQUIRED (2 PER UNIT)UNIT COUNT FACTOR TOTAL REQUIRED NOTES48 2 96 1.92 ADA STALLS REQ. (2%)PHASE 4 PROVIDEDLOCATION# OF STALLSSTANDARD ON-SITE UNCOVERED 64 INCLUDES 3 ADA STALLS & 2 ELECTRIC VEHICLE STALLSCARPORTS 18GARAGES 11 INCLUDES 1 ADA STALLON-STREET 0_TOTAL PROVIDED (INCL. ADA STALLS) 93 INCLUDES 4 ADA STALLSPHASE 5 REQUIRED (2 PER UNIT)UNIT COUNT FACTOR TOTAL REQUIRED NOTES60 2 120 2.4 ADA STALLS REQ. (2%)PHASE 5 PROVIDEDLOCATION# OF STALLSSTANDARD ON-SITE UNCOVERED 95 INCLUDES 2 ADA STALLS & 2 ELECTRIC VEHICLE STALLSCARPORTS 19 INCLUDES 1 ADA STALLGARAGES 11 INCLUDES 1 ADA STALLON-STREET 10TOTAL PROVIDED (INCL. ADA STALLS) 135 INCLUDES 4 ADA STALLSOPEN SPACE REQUIREMENTS# OF UNITS (ALL 2-BEDROOM) 312OPEN SPACE REQUIRED @ 150 SF PER UNIT 46,800 SFOPEN SPACE PROVIDED BY DECKS (50% MAX) 23,114 SF (49.3% OF REQUIRED)OPEN SPACE LAND (OTHER THAN DECKS) 32,732 SF TOTAL OPEN SPACE PROVIDED (LAND AND DECKS) 55,846 SFPHASE 1 OPEN SPACE SUMMARYPHASE 1 UNITS 24OPEN SPACE REQUIRED @ 150 SF PER UNIT 3,600 SFOPEN SPACE PROVIDED BY DECKS (50% MAX) 1,514 SFOPEN SPACE 'A' LAND 3,485 SFTOTAL OPEN SPACE PROVIDED (LAND AND DECKS) 4,999 SFPHASE 2 OPEN SPACE SUMMARYPHASE 2 UNITS 72OPEN SPACE REQUIRED @ 150 SF PER UNIT 10,800 SFOPEN SPACE PROVIDED BY DECKS (50% MAX) 5,400 SFOPEN SPACE 'B' LAND 8,844 SFTOTAL OPEN SPACE PROVIDED (LAND AND DECKS) 14,244 SFCUMULATIVE OPEN SPACE FOR PHASE 1 & 2 20,243 SF (14,400 REQ. FOR PHASE 1 & 2)PHASE 3 OPEN SPACE SUMMARYPHASE 3 UNITS 108OPEN SPACE REQUIRED @ 150 SF PER UNIT 16,200 SFOPEN SPACE PROVIDED BY DECKS (50% MAX) 8,100 SFOPEN SPACE 'C' LAND 9,273 SFOPEN SPACE 'D' LAND 3,185 SFTOTAL OPEN SPACE PROVIDED (LAND AND DECKS) 20,558 SFCUMULATIVE OPEN SPACE FOR PHASE 1, 2, & 3 40,801 SF (30,600 REQ. FOR PHASE 1-3)PHASE 4 OPEN SPACE SUMMARYPHASE 4 UNITS 48OPEN SPACE REQUIRED @ 150 SF PER UNIT 7,200 SFOPEN SPACE PROVIDED BY DECKS (50% MAX) 3,600 SFOPEN SPACE LAND (NONE IN PHASE 4) 0 SFTOTAL OPEN SPACE PROVIDED (LAND AND DECKS) 3,600 SFCUMULATIVE OPEN SPACE FOR PHASE 1, 2, 3, & 4 44,401 SF (37,800 REQ. FOR PHASE 1-4)PHASE 5 OPEN SPACE SUMMARYPHASE 5 UNITS 60OPEN SPACE REQUIRED @ 150 SF PER UNIT 9,000 SFOPEN SPACE PROVIDED BY DECKS (50% MAX) 4,500 SFOPEN SPACE 'E' LAND 4,489 SFOPEN SPACE 'F' LAND 3,456 SFTOTAL OPEN SPACE PROVIDED (LAND AND DECKS) 12,445 SFCUMULATIVE OPEN SPACE FOR PHASE 1, 2, 3, 4, & 5 55,846 SF (46,800 REQ. FOR PHASE 1-5)MIN. AREA IN A LOT PER DWELLINGZONING: R4 (APARTMENTS)12-PLEX FACTORFIRST UNIT REMAINING UNITS FACTOR REQUIREMENT1 3,000 SF 3,000 SF11 1,200 SF 13,200 SFTOTAL PER 12-PLEX 16,200 SF# OF 12-PLEXES 512-PLEX TOTAL 81,000 SF36-PLEX FACTORFIRST UNIT REMAINING UNITS FACTOR REQUIREMENT1 3,000 SF 3,000 SF35 1,200 SF 42,000 SFTOTAL PER 36-PLEX 45,000 SF# OF 36-PLEXES 736-PLEX TOTAL 315,000 SFGRAND TOTAL (12-PLEX & 36-PLEX) 396,000 SF (9.091 ACRES)TOTAL LOT AREA 20.518 ACRESTHIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED BY BECHTLE ARCHITECTS WITH FULL KNOWLEDGE THAT THE CITY OF BOZEMAN'S BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITAITON ACT OF 1973, THE FAIR HOUSING AMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILAR FEDERAL, STATE, OR LOCAL LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTIFAMILY HOUSING. ADA CERTIFICATIONTHE PROJECT INCLUDES DEVELOPING A 20.518 ACRE PROPERTY LOCATED AT 4840 FOWLER LANE WITH A LEGAL DESCRIPTION: S23, T02 S, R05 E, C.O.S. 1996, TRACT 2 NW4. THE PROPERTY IS LOCATED ONE BLOCK SOUTH OF THE INTERSECTION OF STUCKY ROAD AND FOWLER LANE. FOWLER LANE DEFINES THE WESTERN EDGE OF THE PROPERTY, WHILE UNDEVELOPED R-4 ZONED LAND LIES TO THE EAST AND THE UNDEVELOPED FARMLAND LIES TO THE NORTH AND SOUTH OF THE PROPERTY. THE PROPERTY WAS RECENTLY ANNEXED INTO THE CITY OF BOZEMAN AS RESIDENTIAL HIGH-DENSITY R-4 ZONING.THERE IS AN EXISTING RESIDENCE AND (2) OUTBUILDINGS LOCATED AT THE WEST SIDE OF THE PROPERTY. THESE STRUCTURES WILL BE DEMOLISHED DURING PHASE 3 OF THE SITE CONSTRUCTION.PROJECT DESCRIPTIONBUILDING HEIGHTSBUILDING LOW GRADE FROM GROUND HEIGHTFLOOR (5' FROM BUILDING)BUILDING #1 (12-PLEX) -1.8' 37.94'BUILDING #2 (12-PLEX) -1.1' 37.24'BUILDING #3 (36-PLEX) -1.4' 46.48'BUILDING #4 (36-PLEX) -1.6' 46.68'BUILDING #5 (36-PLEX) -1.7' 46.78'BUILDING #6 (36-PLEX) -2.43' 47.51'BUILDING #7 (36-PLEX) -2.38' 47.46'BUILDING #8 (36-PLEX) -1.27' 46.35'BUILDING #9 (12-PLEX) -1.83' 37.97'BUILDING #10 (12-PLEX) -1.5' 37.64'BUILDING #11 (12-PLEX) -1.4' 37.54'BUILDING #12 (36-PLEX) -2.68' 47.76'TYPICAL CARPORT -1' 11.1'TYPICAL GARAGE -1' 17.28'MINIMUM LOT WIDTHMINIMUM LOT WIDTH (OTHER) = 50 FEET ACTUAL NARROWEST LOT WIDTH = 694'APPLICABLE CODES: (STATE OF MONTANA)• 2021 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC)• 2021 EDITION OF THE INTERNATIONAL MECHANICAL CODE (IMC)• 2021 EDITION OF THE INTERNATIONAL FUEL GAS CODE (IFGC)• 2021 EDITION OF THE UNIFORM PLUMBING CODE (IPC)• 2021 EDITION OF THE INTERNATIONAL ENERGY CONSERVATION CODE (IECC)• 2020 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC)• 2017 EDITION OF THE ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES• ADMINISTRATIVE RULES OF MONTANA (ARM) TITLE 24, CHAPTER 301• 2013 EDITION OF NFPA 10 – PORTABLE FIRE EXTINGUISHERS• 2019 EDITION OF NFPA 13 – STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS• 2019 EDITION OF NFPA 72 – NATIONAL FIRE ALARM AND SIGNALING CODEAPPLICABLE CODES: (CITY OF BOZEMAN)• COMMUNITY PLAN DESIGNATION: URBAN NEIGHBORHOOD• ZONING: R-4• DWELLING UNITS AND SLEEPING UNITS (SECTION 1108)• PER 1108.6.2.2.1, ALL GROUP R2 UNITS ON A SITE SHALL BE CONSIDERED TO DETERMINE THE NUMBER OF TYPE A UNITS. TYPE A UNITS SHALL BE DISPERSED AMONG THE VARIOUS CLASSES OF UNITS. ALL 312 UNITS ARE 2-BEDROOM AND 2-BATHROOM.• 312 TOTAL UNITS ON SITE X 2% = 6.24 TYPE A UNITS REQUIRED, 7 PROVIDED - TYPE A UNITS FOR THE COMPLEX ARE ACCOUNTED FOR BY PROVIDING 1 EACH AT THE (7) 36-PLEX BUILDINGS• TYPE B DWELLING UNITS PROVIDED AT THE 36-PLEX BUILDINGS = 11 (1108.6.2.2.2, GROUND FLOOR ONLY, 1108.7.2)• UNIT SUMMARY PER 36-PLEX BUILDING:• TOTAL NUMBER OF UNITS = 36 (12 UNITS PER LEVEL)• TYPE A DWELLING UNITS REQUIRED = 1 (2% OF SITE SHALL BE TYPE A, 1108.6.2.2.1)• TYPE A DWELLING UNITS PROVIDED = 1 PER 36-PLEX (UNIT G1)• TYPE B DWELLING UNITS PROVIDED = 11 PER 36-PLEX (1108.6.2.2.2, GROUND FLOOR ONLY, 1108.7.2)ACCESSIBILITY (IBC CHAPTER 11)LOT COVERAGELOT COVERAGE MAXIMUM ALLOWED = 50%BUILDING TYPE FOOTPRINT # OF BUILDINGS TOTAL AREA12-PLEX 4,465 5 22,32536-PLEX 13,594 7 95,158GARAGE 3,871 4 15,484CARPORT TYPE 1 (18 STALL) 2,142 6 12,852CARPORT TYPE 2 (20 STALL) 2,620 1 2,620CARPORT TYPE 3 (12 STALL) 1,427 2 2,854DUMPSTER ENCLOSURE (SINGLE) 135 9 1,215DUMPSTER ENCLOSURE (DOUBLE) 263 1 263TOTAL AREA 152,771 SFLOT SIZE 893,764 SF (20.518 ACRES)ACTUAL LOT COVERAGE 17.1%FLOOR AREA RATIOMAXIMUM FLOOR AREA RATIO ALLOWED = 1.5:1BUILDING TYPE AREA EACH # OF BUILDINGS TOTAL AREA12-PLEX 13,157 5 65,78536-PLEX 40,293 7 282,051GARAGE 3,871 4 15,484CARPORT TYPE 1 (18 STALL) 2,142 6 12,852CARPORT TYPE 2 (20 STALL) 2,620 1 2,620CARPORT TYPE 3 (12 STALL) 1,427 2 2,854DUMPSTER ENCLOSURE (SINGLE) 135 9 1,215DUMPSTER ENCLOSURE (DOUBLE) 263 1 263TOTAL AREA 383,124 SFLOT SIZE (NET) 565,845 SF (12.99 ACRES)ACTUAL FLOOR AREA RATIO 0.68:1BICYCLE PARKING SUMMARYTOTAL CAR PARKING STALLS REQUIRED: 624BICYCLE PARKING SPACES REQUIRED (10% MINIMUM OF CAR STALLS): 63 MINIMUMBICYCLE PARKING SPACES PROVIDED: BICYCLE CLOSETS (1 PER UNIT): 312BICYCLE RACKS @ BUILDINGS (12 RACKS W/ 4 SPACES EACH): 48BICYCLE RACK @ PARK (1 RACK W/ 10 SPACES): 10TOTAL BICYCLE SPACES PROVIDED: 370TOTAL SITE AREA (AC) 20.52ROW & EASEMENTS (AC) 4.26TOTAL OPEN SPACE/ PARK (AC) 3.27TOTAL EXCLUDED (AC) 7.53(N) NET RESIDENTIAL LOT AREA (AC) 12.99(DU) NUMBER OF UNITS 312(D) NET RESIDENTIAL DENSITY 24ZONING DISTRICT R-4(M) MAX DENSITY BY ZONE 12PARKLAND REQUIREMENTSREQUIRED LAND DEDICATIONNET RESIDENTIAL AREA 12.99DWELLINGS/ ACRE (DU) 8ACRE/ DU OF LAND 0.03LAND DEDICATION 3.12REQUIRED CASH-IN-LIEUNET RESIDENTIAL AREA 12.99DWELLINGS/ ACRE (DU) 4ACRE/ DU OF LAND 0.03EQUIVALENT LAND AREA (AC) 1.56LAND APPRAISAL VALUE ($/SF) $2.60CASH IN LIEU ($) $176,680.40ADJUSTMENTS TO PARKLAND REQUIREMENTSPARKLAND DEDICATION REQUIRED (AC) 3.12LAND ALREADY PROVIDED (AC) 0.00LAND DEDICATION PROPOSED (AC) 1.31LAND EQUIVALENT REQUIRED (AC) 1.81LAND APPRAISAL VALUE ($/SF) $2.60IN-LIEU FEE EQUIVALENT ($) $204,994.40PARKLAND REQUIREDLAND DEDICATION (AC) 0.55CASH-IN-LIEU ($) $176,680.40ADDITIONAL IN-LIEU ($) $204,994.40TOTAL CILP/ IILP $381,674.80GENERALSP000 COVER SHEETSP001 ARCHITECTURAL SITE PLANSP002 DUMPSTER ENCLOSURE - SINGLESP003 DUMPSTER ENCLOSURE - DOUBLECIVILC1.0 COVERC1.1 PLAN SET OVERVIEW, NOTES, & LEGENDC2.0 EXISTING CONDITIONSC3.0 NW SITE PLANC3.1 SW SITE PLANC3.2 NE SITE PLANC3.3 SE SITE PLANC3.4 INFRASTRUCTURE IMPROVEMENTC3.5 OFF-SITE IMPROVEMENTSC4.0 NW UTILITY PLANC4.1 SW UTILITY PLANC4.2 NE UTILITY PLANC4.3 SE UTILITY PLANC5.0 NW GRADING & DRAINAGE PLANC5.1 SW GRADING & DRAINAGE PLANC5.2 NE GRADING & DRAINAGE PLANC5.3 SE GRADING & DRAINAGE PLANC5.4 STORM SEWER PLANC6.0 PHASING PLAN-PHASE 1C6.1 PHASING PLAN-PHASE 2C6.2 PHASING PLAN-PHASE 3C6.3 PHASING PLAN-PHASE 4C6.4 PHASING PLAN-PHASE 5C7.0 DETAILSC7.1 DETAILSC7.2 DETAILSBOZEMAN, MTRANGE 5 -SITE PLAN SUBMITTALVICINITY MAPPROJECT SITEC7.3 DETAILSC7.4 DETAILSC7.5 DETAILSC7.6 DETAILSLANDSCAPEL100 OPEN SPACE PLANL101 OVERALL LANDSCAPE PLANL102 LANDSCAPE NOTESL103 PLANT SCHEDULEL104 PHASE 1 PARK PLANL105 PHASE 1 LANDSCAPE PLANL106 PHASE 2 LANDSCAPE PLANL107 PHASE 3 NORTH LANDSCAPE PLANL108 PHASE 3 SOUTH LANDSCAPE PLANL109 PHASE 4 LANDSCAPE PLANL110 PHASE 5 LANDSCAPE PLANL201 LANDSCAPE DETAILSL202 PARK DETAILSL203 PARK DETAILSL301 OVERALL IRRIGATION PLANL302 IRRIGATION SCHEDULESL303 PHASE 1 IRRIGATION PLANL304 PHASE 1 BOULEVARD IRRIGATION PLANL305 PHASE 1 BOULEVARD IRRIGATION PLANL306 PHASE 2 IRRIGATION PLANL307 PHASE 3 NORTH IRRIGATION PLANL308 PHASE 3 SOUTH IRRIGATION PLANL309 PHASE 4 IRRIGATION PLANL310 PHASE 5 IRRIGATION PLANL311 PARK CONCEPT IRRIGATION PLANL401 IRRIGATION DETAILS12 PLEX12 SP101 FIRST FLOOR PLAN12 SP102 SECOND FLOOR PLAN12 SP103 THIRD FLOOR PLAN12 SP104 ROOF PLAN12 SP201 MATERIAL ELEVATIONS12 SP202 FRONTAGE ELEVATIONS12 SP301 PERSPECTIVES36 PLEX36 SP101 FLOOR PLANS36 SP102 FLOOR PLANS36 SP103 ROOF PLAN36 SP201 MATERIAL ELEVATIONS36 SP202 FRONTAGE ELEVATIONS36 SP300 PERSPECTIVESCARPORTC SP101 CARPORT A FLOOR PLAN, ROOF PLAN, & ASSEMBLIESC SP102 CARPORT B FLOOR PLAN, ROOF PLAN, & ASSEMBLIESC SP103 CARPORT C FLOOR PLAN, ROOF PLAN, & ASSEMBLIESC SP201 CARPORT A ELEVATIONS & PERSPECTIVEC SP202 CARPORT B ELEVATIONS & PERSPECTIVEC SP203 CARPORT C ELEVATIONS & PERSPECTIVEGARAGEG SP101 MAIN FLOOR PLAN, RCP, & ROOF PLANG SP201 ELEVATIONS, MATERIALS, & PERSPECTIVEELECTRICALE001 SITE ELECTRICALE002 SITE PHOTOMETRICSE003 EXTERIOR LIGHTING FIXTURESE004 EXTERIOR LIGHTING FIXTURESSHEET INDEXAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2023 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTSAutodesk Docs://Nistler Fowler Subdivison/SITE_NISTLER FOWLER.rvt2305SP000COVER SHEETSITE PLANSUBMITTALSEPTEMBER 15, 2023RANGE 5BOZEMAN, MONTANAREVISION SCHEDULENo. Description Date1 SP 01 01/25/242 SP 02 05/07/243 SP 03 08/09/24STUCKY ROADS. 19TH AVE.308/09/24