Loading...
HomeMy WebLinkAbout024 - L2.0 - Landscape DetailsSTORM POND LANDSCAPING DETAIL8L2.01" = 5'(E) SIDEWALK(E) PUBLIC ROW(P) PARKING,REFER TO CIVILNATIVE GRAVEL LAYEROVER-EXCAVATE BOTTOM OF RETENTIONPOND DOWN TO NATIVE GRAVEL LAYERAND BACKFILL WITH WELL-DRAININGGRAVEL. WIDTH VARIES, REFER TO CIVIL.FINISH GRADE WITH 6"TOPSOIL. PLANTINGPER PLAN(E) BOULEVARD WITH NEWLANDSCAPING PER PLANBOTTOM OF POND, DEPTHVARIES: 2.5' MAX POND DEPTH,1.5' MAX WATER STORAGE DEPTH.REFER TO CIVIL FOR ELEVATIONSEXISTING SUBGRADEPP5 . 7 '5.0'10.1' (VARIES)135°' 4.1' 45°' No. REVISIONSFile Name: IMEG Project No: Date: Drawn By: Checked By: Sheet of DESCRIPTION DATECOPYRIGHTALL RIGHTS RESERVEDC23006847 L1.0 Landscape.dwg2024Field Book No:1143 STONERIDGE DR SUITE 2 BOZEMAN, MT 59718 PH: 406.582.9901 www.imegcorp.com COMPASS APARTMENTS BOZEMAN, MT LANDSCAPE DETAILS23006847ESEW08/27/2024L2.047NOT TO SCALEFABRIC & MULCH6L2.0NOT TO SCALEMETAL EDGING5L2.0NOT TO SCALEPERENNIAL/GROUNDCOVER PLANTING4L2.0NOT TO SCALESHRUB PLANTING3L2.0NOT TO SCALECONIFEROUS TREE PLANTING2L2.0NOT TO SCALEDECIDUOUS TREE PLANTING1L2.0FINISH GRADE OF PLANTING AREA. TAPER GRADEDOWN AT ADJACENT HARDSCAPE (WHEREOCCURS) TO ACCOMMODATE MULCH LAYER.INSTALL WEED BARRIER FABRIC THROUGHOUTENTIRE AREA OF SHRUB BEDS. LAP 6" AT JOINTS.BURY PERIMETER EDGE OF FABRIC INTO SOIL.MULCH LAYER PER SPECS. TAPERDEPTH AT EDGE TO KEEP 1" BELOWHARDSCAPE SURFACE (WHERE OCCURS)FABRIC STAPLEPLACEMENT PER SPECS.AMENDED TOPSOIL LAYER. DEPTHPER SOIL PREPARATION SPECS.NATIVE UNDISTURBED SOIL.FINISHEDGRADE3"1"3"MULCH AS NOTEDMULCH/LAWNEDGE AS NOTEDFINISHED GRADEOF ADJACENT TURFXY X XX = PLANT SPACING, REFER TO PLANLEGEND FOR SPACING REQUIREMENTSY = SPACING BETWEEN ROWS = 80% OF X = PLANT LOCATIONTRIANGULARSPACINGINSTALL SOIL AS SPECIFIED. APPLY DACTHOLOR SURFLAN TO ALL GROUNDCOVER BEDSPER MANUFACTURER'S SPECIFICATIONSSPECIFIED MULCHING MATERIAL. PULL MULCHAWAY FROM TRUNK A MINIMUM OF 6"PLANT MATERIAL, PER PLANNOTES:1.PLANT MATERIALS MUST MEET THE MINIMUM ACCEPTABLE STANDARDSET BY THE AMERICAN ASSOCIATION OF NURSERYMEN'S AMERICANSTANDARD FOR NURSERY STOCK, ANSIZ60.1. BROKEN, DAMAGED,DISEASED, OR SUBSTANDARD STOCK WILL BE REJECTED.2.BARK PROTECTOR TO BE BLACK PLASTIC MESH TREE GUARD. INSTALLON ALL TREES.3.REMOVE ALL TWINE OR STRING AND BURLAP FROM TOP THIRD OFROOTBALL AND REMOVE ENTIRE WIRE BASKET.4.THE ROOT FLARE OF ALL TREES SHALL BE LEVEL WITH OR UP TO 1"ABOVE GRADE.5.ALL TREES SHALL BE INSTALLED WITH A TEMPORARY SAUCER OF RAISEDSOIL AT THE EDGE OF ROOT BALL TO CONTAIN WATER. REMOVE ORBREACH WATER SAUCER BEFORE WINTER.6.STAKING IS NOT MANDATORY. HOWEVER, THE CONTRACTOR SHALLREPLACE ANY UN-STAKED TREE WITHOUT QUESTION IF DIRECTED TO DOSO AT ANY TIME THROUGH COMPLETION OF WARRANTY PERIOD.7.STAKES SHALL BE 2" x 2" x 6' FIR STAKES. MINIMUM 2 PER TREE. STAKESSHALL NOT PENETRATE ROOT BALL. STAKES SHALL BE REMOVED AFTERONE YEAR.8.TREE TIES SHALL BE 1" MINIMUM WIDE FLEXIBLE BELT-LIKE STRAPPING.DO NOT USE ROPE OR WIRE. DO NOT OVER-TIGHTEN.9.MULCH AS SPECIFIED. PULL MULCH AWAY FROM TRUNK A MINIMUM OF6".10.PROVIDE A 5' MULCH RADIUS AROUND ALL TREES.11.REMOVE TAGS AND LABELS FOLLOWING SUBSTANTIAL COMPLETION.12.PRUNE TREE TO REMOVE DEAD OR DAMAGED LIMBS OR BRANCHES.13.EXCAVATED HOLE WIDTH TO BE 3 TIMES THE DIAMETER OF THEROOTBALL. DEPTH TO EQUAL THE HEIGHT OF THE ROOTBALL.2.5'4.0'2.0'EXCAVATE HOLE:SEE NOTE 12NOTES:1.BARK PROTECTOR TO BE BLACK PLASTIC MESH TREE GUARD. INSTALL ON ALL TREES. TREE GUARDS SHALLEXTEND FROM GROUND LEVEL TO 48" ABOVE FINISH GRADE (36" IF BRANCH IS ENCOUNTERED). TRIM ANYBRANCHES BELOW 36" LEVEL.2.ALL TREES TO BE PLANTED TO BEAR THE SAME RELATION TO FINISH GRADE AS ORIGINALLY GROWN IN THENURSERY.3.PROVIDE A MINIMUM OF 5' DIAMETER MULCH RING AROUND TREES. EXTEND CIRCLE A MINIMUM OF 12"BEYOND REBAR STAKES.4.HOLE EXCAVATION WIDTH TO BE 3 TIMES THE DIAMETER OF THE ROOTBALL. DEPTH TO BE EQUAL TO THEHEIGHT OF THE ROOTBALL. BACKFILL AND COMPACT OVER-EXCAVATIONS.PLANTER APPLICATIONTURF APPLICATIONUSE PROPER PRUNINGTECHNIQUES TO REMOVEDEAD OR BROKEN LIMBSTREE BARK PROTECTOR,AS NOTEDFERTILIZER TABS#4 REBAR STAKES WITH REDSAFETY END CAPS. ATTACHCAPS WITH EPOXY ADHESIVE.DRIVE INTO UNDISTURBEDSOIL PER SPECIFICATIONSTURF (WHERE OCCURS)SHOVEL CUT EDGEBLACK RUBBER HOSE TREE PROTECTION FORGUY WIRES. ATTACH NEAR TOP 1/3 OF TRUNK12 GAUGE GALVANIZED GUY WIRES. TYPICALTHREE (3) PER TREE, EQUALLY SPACEDREMOVE ALL TWINE OR STRING ANDBURLAP FROM TOP THIRD OF ROOTBALLAND REMOVE ENTIRE WIRE BASKET3" DEPTH OF SPECIFIED MULCHINGMATERIAL. PULL MULCH AWAYFROM TRUNK A MINIMUM OF 3"1/2" DIAMETER x 4' LENGTH PVC PIPEEXCAVATE HOLE PER NOTE 4FINISH GRADEBACKFILL MIX PER SPECIFICATIONSPRUNE SHRUB TO REMOVEDEAD OR DAMAGED BRANCHESCREATE SAUCER AROUND SHRUBMULCH AS SPECIFIED. PULLMULCH AWAY FROM STEM.MULCH NOT TO EXCEED 4" DEPTHREMOVE ROOT CONTAINMENTMATERIALS IF PRESENTBACKFILL WITHAMENDED TOPSOIL12" MINEXCAVATED HOLE, SEE NOTE 2NOTES:1.SHRUBS TO BE PLANTED TO BEAR THE SAME RELATION TO FINISH GRADEAS ORIGINALLY GROWN IN THE NURSERY.2.EXVATED HOLE TO BE 2 TIMES THE DIAMETER OF ROOTBALL.NOT TO SCALEEDGING LAYOUT7L2.01 COB COMMENTSSPACING