HomeMy WebLinkAbout021 - L0.0 - Landscape Notes148'413'248'402'No.
REVISIONSFile Name: IMEG Project No: Date: Drawn By: Checked By: Sheet of DESCRIPTION DATECOPYRIGHTALL RIGHTS RESERVEDC23006847 L1.0 Landscape.dwg2024Field Book No:1143 STONERIDGE DR
SUITE 2
BOZEMAN, MT 59718
PH: 406.582.9901
www.imegcorp.com
COMPASS APARTMENTS
BOZEMAN, MT
LANDSCAPE NOTES23006847ESEW08/27/2024L0.017GENERAL NOTES:A.CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND UTILITY LOCATIONS PRIORTO START OF WORK. ANY DISCREPANCIES SHALL BE REPORTED TO THE PROJECTMANAGER AND LANDSCAPE ARCHITECT. ALL WORK AND MATERIALS SHALL BE INCOMPLETE ACCORDANCE WITH CITY OF BOZEMAN DESIGN STANDARDS, PROJECTSPECIAL PROVISIONS, AND ALL OTHER GOVERNING AGENCY STANDARDS.B.ANY MEETINGS, PRE CONSTRUCTION, POST CONSTRUCTION, INSPECTIONS ANDPERMITS REQUIRED AS PART OF THE CITY OF BOZEMAN LANDSCAPE AND IRRIGATIONPERFORMANCE AND DESIGN STANDARDS MANUAL AND CITY OF BOZEMANMUNICIPAL CODE ARE THE RESPONSIBILITY OF THE CONTRACTOR.C.DO NOT SCALE DRAWINGS. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS ANDEXISTING CONDITIONS PRIOR TO BEGINNING WORK. START OF WORK CONSTITUTESACCEPTANCE OF CONDITIONS.D.INCREASE TO CONTRACT SUM OR TIME WILL NOT BE APPROVED FOR CONDITIONS ORSITUATIONS EVIDENT AT TIME OF BIDDING.E.NOTIFY THE PROJECT MANAGER IMMEDIATELY OF ANY DISCREPANCIES ORAMBIGUITIES ON THE DRAWINGS AND/OR IN THE SPECIFICATIONS.F.CHANGES OR DEVIATIONS FROM THE DRAWINGS MADE WITHOUT THE WRITTENCONSENT OF THE PROJECT MANAGER AND/OR APPROVED CHANGE ORDER WILL BECONSIDERED UNAUTHORIZED.G.CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION AND COMPLETION OF ALLWORK SHOWN AND SHALL COORDINATE WORK BETWEEN TRADES PRIOR TOBEGINNING WORK.H.MAINTAIN A CLEAN WORK SITE AT ALL TIMES.I.NOTIFY PROJECT MANAGER AND OWNER IN WRITING OF ANY EXPECTED DISRUPTIONSIN SERVICE OR CHANGES IN CONSTRUCTION SCHEDULE AND OBTAIN WRITTENPERMISSION AS SPECIFIED.J.ALL AREAS USED FOR CONSTRUCTION AND/OR DAMAGED DURING THE EXECUTIONOF THIS CONTRACT, INCLUDING STAGING AREAS, LANDSCAPE AND SITE ELEMENTS,SHALL BE REPAIRED AND/OR RESTORED UPON COMPLETION OF THIS PROJECT.CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING LANDSCAPE, SITE ANDELEMENTS WITHIN STAGING AREAS, CONSTRUCTION VICINITY, AND/OR AS NOTED ONTHE DOCUMENTS.K.THE ARCHITECTURAL DRAWINGS SHOW PRINCIPLE AREAS AND LIMITS OFCONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.INCIDENTAL WORK MAYBE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURALDRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, AND PLUMBINGALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THISCONTRACT AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORKREQUIRED AND DO THE WORK IN ACCORDANCE WITH THE CONTRACTREQUIREMENTS AT NO ADDITIONAL COST.L.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL COMPONENTS ANDACCESSORIES FOR A COMPLETE AND FINISHED INSTALLATION FOR ALL PRODUCTSSHOWN ON THESE DRAWING SHEETS.M.THE SPECIFICATIONS INCLUDED WITHIN THESE DRAWING SHEETS ARE AN INTEGRALPART OF THESE DOCUMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TOREVIEW ALL INFORMATION ENCLOSED.N.THE CONTRACTOR SHALL CONTROL DUST IN ACCORDANCE WITH REGULATIONS OFLOCAL AIR POLLUTION CONTROL AUTHORITY. THE CONTRACTOR SHALL PROTECTADJACENT PROPERTIES, PUBLIC AND PRIVATE, AT ALL TIMES DURING CONSTRUCTION.PLANTING NOTES:A.LANDSCAPE/IRRIGATION CONTRACTOR SHALL COORDINATE INSTALLATION OF ALLLANDSCAPE/IRRIGATION MATERIALS WITH GENERAL CONTRACTOR.B.CONTRACTOR TO EVALUATE EXISTING SITE CONDITIONS AND REMEDY AS REQUIREDTO PROVIDE FOR HEALTHY PLANT GROWTH AND MITIGATE UNSIGHTLY CONDITIONS.C.ALL PLANT MATERIAL SHALL BE INSTALLED AS DETAILED AND SPECIFIED ANDACCORDING TO AMERICAN NURSERY AND LANDSCAPE ASSOCIATION STANDARDS.D.ALL PLANT MATERIAL IS COVERED BY A TWELVE (12) MONTH WARRANTY.E.PLANT, PLACE TOPSOIL AND RE-GRADE ALL PROPOSED LAWN AREAS DISTURBED BYCONTRACTOR’S OPERATIONS AS PER PLANS AND SPECIFIED. DISTURBED AREASSHALL BE WHERE CONSTRUCTION ACTIVITIES INCLUDING TRENCHING, DEMOLITION,EARTHWORK, MATERIAL STORAGE, STAGING, PARKING OR ANY OTHER FORM OFEXCAVATION, COMPACTION, OR TRAFFIC RESULTS IN THE REMOVAL ORDISPLACEMENT OF EXISTING GROUND COVER OR GRADE. PROVIDE SMOOTH CLEANTRANSITION FROM EXISTING TO DISTURBED AREA.F.REFER TO CIVIL SHEETS FOR INFORMATION REGARDING ALL GRADING, INCLUDINGUTILITY INFORMATION, SIDEWALK AND DRIVE INFORMATION, AND CURB AND GUTTERINFORMATION.G.ANY DEVIATIONS IN UTILITIES FROM THIS PLAN MUST BE SUPPLIED TO THE PROJECTMANAGER AND OWNER IN AS-BUILT DRAWINGS.H.CONTRACTOR SHALL VERIFY ALL PLANT QUANTITIES. THE ILLUSTRATED LOCATIONSSHALL DICTATE FINAL COUNT.I.PLANT MATERIAL SHALL NOT BE ROOT BOUND. ALL PLANTS SHALL EXHIBIT HEALTHYGROWTH AND BE FREE OF DISEASES AND PESTS.J.NO PLANT SUBSTATIONS WILL BE ALLOWED WITHOUT WRITTEN CONSENT FROM THELANDSCAPE ARCHITECT.K.DURING INSTALLATION OF ALL LANDSCAPE WORK, CONTRACTOR SHALL KEEP ALLPLANTING AND HARDSCAPE AREAS CLEAN OF DEBRIS. PROTECT ALL PLANTMATERIALS FROM DAMAGE DUE TO CONSTRUCTION ACTIVITIES BY ALL TRADES.MAINTAIN PROTECTION THROUGHOUT DURATION OF MAINTENANCE PERIOD. TREAT,REPAIR, OR REPLACE ANY DAMAGED OR UNHEALTHY PLANT MATERIALS, AS WELL AS,ALL OTHER LANDSCAPE WORK IMMEDIATELY.L.CONTRACTOR TO NOTIFY PROJECT MANAGER OF ANY PROBLEMS WITH EXISTING SOILCONDITIONS OR HIGH WATER TABLE IMMEDIATELY UPON DISCOVERY.M.COORDINATE STOCKPILING AND PLACEMENT OF IMPORTED TOPSOIL TO ACHIEVEFINISH GRADE AS SPECIFIED BY CIVIL PROJECTS. AFTER INCORPORATION OFSUPPLEMENTAL SOIL AMENDMENT PRODUCTS, FINISH GRADE ALL PLANTING AREASSMOOTH (FREE OF PEAKS OR DEPRESSIONS) PRIOR TO PLACEMENT OF MULCH.N.CONTRACTOR TO COORDINATE AND SUPERVISE THE TRENCHING OF UTILITIES ANDSERVICES THROUGH LANDSCAPE AREAS. COORDINATION SHALL INCLUDECONTRACTOR’S REASONABLE EFFORTS TO COMBINE AS MANY DIFFERENT UTILITIESIN COMMON TRENCHES AS PRACTICALITIES AND GOOD PRACTICE PERMIT.O.ALL PLANT MATERIAL SHALL BE INSTALLED USING COMMON SENSE AND GOODPLANTING PRACTICES.P.ALL PLANTERS ARE TO BE MULCHED AS SPECIFIED. MODIFY FINISH GRADE ADJACENTTO WALKING SURFACES TO PREVENT MULCH FROM MITIGATING OR WASHING ONTOSUCH SURFACES DURING RAIN EVENTS. SUBMIT SAMPLE OF MULCH PRODUCTINTENDED FOR USE ON PROJECT TO PROJECT MANAGER FOR APPROVAL PRIOR TOINSTALLATION.Q.WEED BARRIER TO BE 'TYPAR 3201' AS MANUFACTURED BY LINE INDUSTRIAL FABRICS,INC., GEOTEXTILE DIVISION, WWW.THRACELINQ.COM. INSTALL UNDER ALL MULCH,ALTERNATE PRODUCTS ACCEPTED WITH SUBMITTAL, REVIEW, AND APPROVAL OFPROJECT MANAGER. INSTALL WEED BARRIER FABRIC IN ALL PLANTING BEDS ASSHOWN ON PLAN.R.CONTRACTOR SHALL MAINTAIN TREES AND SHRUBS FOLLOWING SUBSTANTIALCOMPLETION FOR TWELVE (12) MONTHS BY PRUNING, CULTIVATING, WATERING,WEEDING, FERTILIZING, RESTORING PLANTING SAUCERS, TIGHTENING AND REPAIRINGSTAKES AND GUY SUPPORTS, AND RESETTING TO PROPER GRADES OR VERTICALPOSITION, AS REQUIRED TO ESTABLISH HEALTHY, VIABLE PLANTINGS. SPRAY TO KEEPTREES AND SHRUBS FREE OF INSECTS AND DISEASE. RESTORE OR REPLACEDAMAGED TREE WRAPPINGS.MULCH NOTES:A.MULCH TO BE A 3 INCH DEPTH AND LOCATED AS ACCORDING TO PLAN. SUBMITSAMPLE TO LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TOINSTALLATION.B.MULCH TO BE PLACED OVER PRE-EMERGENT WEED CONTROL GRANULES.C.FIR OR PINE BARK CHIPS ONLY. NO SHREDDED MULCH. NATURAL COLOR.EXISTING CONDITIONS:A.PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL VERIFY ALL EXISTINGCONDITIONS AND ELEVATIONS, THE CONTRACTOR SHALL REVIEW THE PROPOSEDPLANS AND CONFIRM THAT DESIGN ELEVATIONS AND GRADES MATCH EXISTINGFIELD CONDITIONS.SHOP AND FABRICATION DRAWINGS:A.THE CONTRACTOR SHALL PREPARE AND SUBMIT FABRICATION DRAWINGS, DESIGNMIX INFORMATION, MATERIAL TESTING COMPLIANCE DATA, AND ANY OTHERPERTINENT DATA TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TOPLACEMENT OF MATERIALS. FOLLOWING REVIEW THE CONTRACTOR SHALLRESUBMIT COPIES OF ANY DRAWINGS WHICH REQUIRE REVISION OR CORRECTION.B.ANY REVIEW BY THE ARCHITECT WILL NOT RELIEVE THE CONTRACTOR OFRESPONSIBILITY FOR ERRORS OR OMISSIONS, INADEQUATE DESIGN PERFORMANCEREQUIREMENTS, OR SCHEDULE REQUIREMENTS. THE CONTRACTOR SHALL REMAINSOLELY RESPONSIBLE FOR FULL AND COMPLETE PERFORMANCE IN ACCORDANCEWITH THE TERMS, CONDITIONS, PROVISIONS, DRAWINGS, AND SPECIFICATIONS.INSPECTION AND TESTING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL REQUIRED ANDNECESSARY INSPECTIONS ARE PERFORMED.WARRANTY:A.IF WITHIN ONE YEAR AFTER ACCEPTANCE OF THE WORK, ANY OF THE WORK IS FOUNDTO BE DEFECTIVE OR NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTSAND/OR DRAWINGS AND UPON WRITTEN NOTICE FROM THE ARCHITECT, THECONTRACTOR SHALL CORRECT ANY WORK BEGINNING WITHIN SEVEN CALENDARDAYS OF SAID WRITTEN NOTICE. SHOULD THE CONTRACTOR FAIL TO RESPOND TOTHE WRITTEN NOTICE WITHIN THE DESIGNATED TIME, THE OWNER MAY CORRECT THEWORK AT THE EXPENSE OF THE CONTRACTOR.LANDSCAPE MAINTENANCE PLAN:IRRIGATION SYSTEMGENERAL INFORMATIONa.THERE IS AN AUTOMATIC IRRIGATION SYSTEM.b.SEE IRRIGATION CONTRACTOR’S AS-BUILT DRAWINGS FOR: IRRIGATION SYSTEMPIPING, INCLUDING PLAN LAYOUT, AND LOCATIONS,TYPES, SIZES, CAPACITIES, ANDFLOW CHARACTERISTICS OF IRRIGATION SYSTEM PIPING COMPONENTS. PLUMBINGCOMPONENTS, VALVES, PIPING, SPRINKLERS AND DEVICES, ACCESSORIES,CONTROLS, AND WIRING. AS WELL AS, AREAS OF SPRINKLER SPRAY, WIRE SIZE ANDNUMBER OF CONDUCTORS FOR EACH CONTROL CABLE. SYSTEM INSTRUCTION ANDMAINTENANCE INSTRUCTION PROVIDED BY INSTALLATION CONTRACTOR.STARTUP AND WINTERIZATIONa.SERVICE STARTUPi.BEGIN IRRIGATION SYSTEM ANNUALLY AS NECESSARY, TYPICALLY APRIL.ii.COMPLETE STARTUP CHECKS ACCORDING TO MANUFACTURER'S WRITTENINSTRUCTIONS.iii.ALL ZONES SHOULD BE TESTED TO INSURE COVERAGE OF ALL AREAS.iv.ADJUST SETTINGS OF CONTROLLER AS NECESSARY.b.SERVICE FOR WINTERIZATIONi.WINTERIZATION IS REQUIRED AND RECOMMENDED BY THE END OF OCTOBER OREARLIER AS NECESSARY DEPENDING ON THE WEATHER.ii.WINTERIZATION OF THE SYSTEM REQUIRES SHUTTING OFF THE WATER SOURCE TOIRRIGATION SYSTEM IN THE MECHANICAL ROOM(S) AND EXPELLING THE REMAININGWATER IN THE SYSTEM WITH COMPRESSED AIR, NOT EXCEEDING 80 PSI, WORKINGTHROUGH ALL OF THE ZONES.MAINTENANCEa.INSPECT SYSTEM THROUGHOUT THE SEASON TO INSURE EFFICIENT OPERATION.b.PERFORM PREVENTIVE MAINTENANCE AS NECESSARY.i.REPLACE AND REPAIR SYSTEM WITH THE CORRECT REPLACEMENT PART TOPRESERVE OVERALL PERFORMANCE.PEST MANAGEMENTGENERAL INFORMATIONa.PESTICIDES REGISTERED AND APPROVED BY EPA, ACCEPTABLE TO AUTHORITIESHAVING JURISDICTION, AND OF TYPE RECOMMENDED BY MANUFACTURER FOR EACHSPECIFIC PROBLEM AND AS REQUIRED FOR PROJECT CONDITIONS AND APPLICATION.DO NOT USE RESTRICTED PESTICIDES UNLESS AUTHORIZED IN WRITING BYAUTHORITIES HAVING JURISDICTION.b.PESTICIDE APPLICATOR: STATE LICENSED, COMMERCIAL.c.PRIOR TO ANY ACTION CONSULT WITH THE AUTHORITY HAVING JURISDICTION FORAPPROVAL.WEED CONTROLGENERAL INFORMATIONa.PLANTING BEDS SHOULD BE HAND WEEDED AS NECESSARY.b.HERBICIDE APPLICATOR: STATE LICENSED, COMMERCIAL.c.PRIOR TO ANY ACTION CONSULT WITH THE AUTHORITY HAVING JURISDICTION FORAPPROVAL AND THAT PLAN IS CONSISTENT WITH THEIR CURRENT WEEDMANAGEMENT PLAN.FERTILIZATIONGENERAL INFORMATIONa.LAWN AREAS TO BE FERTILIZED THREE TIMES A YEAR WITH THE APPROPRIATEFERTILIZER AT TIME OF SERVICE, USE OF A REEMERGENT IN THE FALL ISRECOMMENDED.b.COMMERCIAL-GRADE COMPLETE FERTILIZER OF NEUTRAL CHARACTER, CONSISTINGOF FAST- AND SLOW-RELEASE NITROGEN, 50 PERCENT DERIVED FROM NATURALORGANIC SOURCES OF UREA FORMALDEHYDE, PHOSPHOROUS, AND POTASSIUM INTHE FOLLOWING COMPOSITION.i.NITROGEN, PHOSPHORUS, AND POTASSIUM IN AMOUNTS RECOMMENDED IN SOILREPORTS FROM A QUALIFIED SOIL-TESTING LABORATORY.c.SLOW-RELEASE FERTILIZER: GRANULAR OR PELLETIZED FERTILIZER CONSISTING OF50 PERCENT WATER-INSOLUBLE NITROGEN, PHOSPHORUS, AND POTASSIUM IN THEFOLLOWING COMPOSITION.i.NITROGEN, PHOSPHORUS, AND POTASSIUM IN AMOUNTS RECOMMENDED IN SOILREPORTS FROM A QUALIFIED SOIL-TESTING LABORATORY.ii.NUTRIENT COMPOSITION: 20 PERCENT NITROGEN, 10 PERCENT PHOSPHOROUS, AND5 PERCENT POTASSIUM, BY WEIGHT PLUS MICRONUTRIENTS.d.FERTILIZER APPLICATOR: STATE LICENSED, COMMERCIAL.e.PRIOR TO ANY ACTION CONSULT WITH THE AUTHORITY HAVING JURISDICTION FORAPPROVAL.GENERAL MAINTENANCEGENERAL INFORMATIONa.PROVIDE MAINTENANCE BY SKILLED EMPLOYEES. BEGIN MAINTENANCEIMMEDIATELY AFTER PLANTS ARE INSTALLED AND CONTINUE UNTIL PLANTINGS AREACCEPTABLY HEALTHY AND WELL ESTABLISHED, FOLLOWED BY REGULAR INTERVALS.PLANT MAINTENANCEa.REMOVE ONLY DEAD, DYING, OR BROKEN BRANCHES. PRUNE, THIN, AND SHAPETREES, SHRUBS, AND VINES ACCORDING TO STANDARD PROFESSIONALHORTICULTURAL AND ARBORICULTURAL PRACTICES. UNLESS OTHERWISE INDICATEDBY LANDSCAPE ARCHITECT OR LICENSED ARBORIST DO NOT CUT TREE LEADERS;REMOVE ONLY INJURED, DYING, OR DEAD BRANCHES FROM TREES AND SHRUBS;AND PRUNE TO RETAIN NATURAL CHARACTER.b.MAINTAIN PLANTINGS BY PRUNING, CULTIVATING, WATERING, WEEDING, FERTILIZING,MULCHING, RESTORING PLANTING SAUCERS, RESETTING TO PROPER GRADES ORVERTICAL POSITION, AND PERFORMING OTHER OPERATIONS AS REQUIRED TOESTABLISH AND MAINTAIN HEALTHY, VIABLE PLANTINGS. SPRAY OR TREAT ASREQUIRED TO KEEP TREES AND SHRUBS FREE OF INSECTS AND DISEASE.c.FILL IN AS NECESSARY SOIL SUBSIDENCE THAT MAY OCCUR BECAUSE OF SETTLINGOR OTHER PROCESSES.d.REPLACE MULCH MATERIALS DAMAGED OR LOST IN AREAS OF SUBSIDENCE.e.APPLY TREATMENTS AS REQUIRED TO KEEP PLANT MATERIALS, PLANTED AREAS, ANDSOILS FREE OF PESTS AND PATHOGENS OR DISEASE. USE PRACTICES TO MINIMIZETHE USE OF PESTICIDES AND REDUCE HAZARDS.f.APPLY PESTICIDES AND OTHER CHEMICAL PRODUCTS AND BIOLOGICAL CONTROLAGENTS IN ACCORDANCE WITH AUTHORITIES HAVING JURISDICTION ANDMANUFACTURER'S WRITTEN RECOMMENDATIONS. COORDINATE APPLICATIONS WITHOWNER'S OPERATIONS AND OTHERS IN PROXIMITY TO THE WORK. NOTIFY OWNERBEFORE EACH APPLICATION IS PERFORMED.PLANTING SOILSa.ALL LANDSCAPE AREAS TO RECEIVE A MINIMUM OF 6" OF TOPSOIL THROUGHOUT THEENTIRE PLANTING AREA.b.AMEND EXISTING TOPSOIL AT A RATE OF 4 CY OF COMPOST PER 1,000 SF. COMPOSTMUST MEET THE STATE OF MONTANA'S COMPOST REQUIREMENT FOR SOILAMENDMENT (ADMIN. RULE MONT. 17.50.1716). COMPOST MUST BE SPREAD ANDMIXED EVENLY INTO THE TOP 6" OF TOPSOIL.c.REMOVE STONES THAT ARE, AT A MIN., LARGER THAN 2", STICKS, ROOTS,CONSTRUCTION DEBRIS, AND OTHER EXTRANEOUS MATTER, AND LEGALLY DISPOSEOF THEM OFF THE PROPERTY.d.DO NOT APPLY MATERIAL OR SCARIFY IF SOIL IS FROZEN, MUDDY, OR EXCESSIVELYWET.e.PROTECT AREAS OF IN-PLACE SOIL FROM ADDITIONAL COMPACTION, DISTURBANCE,AND CONTAMINATION DURING CONSTRUCTION.PLANT REPLACEMENTa.REMOVE AND REPLACE DEAD TREES OR PLANTS AS SOON AS POSSIBLE.b.DETERMINE CAUSE OF DEATH OF PLANT AND ACT ACCORDINGLY SHOULDREPLACEMENT WITH A PLANT OF ANOTHER VARIETY BE REQUIRED.PERMITSa.BE SURE TO OBTAIN ANY AND ALL NECESSARY PERMITS FOR WORK PERFORMED INBOULEVARD OR ANY ADDITIONAL AREA WHERE PRIOR APPROVAL IS REQUIRED.WINTER MAINTENANCEa.DO NOT ALLOW EXCESSIVE AMOUNT OF SNOW TO REMAIN ON PLANTINGS FOREXTENDED PERIODS OF TIME.b.MAINTAIN WALKS AND DRIVES FREE FROM SNOW AND ICE.CITY OF BOZEMAN - COMPASS APARTMENTS LLCUSDA PLANT HARDINESS ZONE: 4B (-25°F TO -20°F)CITY OF BOZEMAN LANDSCAPE CODE ANALYSISGENERAL LANDSCAPE REQUIRED:STREET FRONTAGE TREESSTREET TREE REQUIRED AT A RATE OF 1 LARGE CANOPY TREE FOR EVERY 50 LF OF STREETFRONTAGE OR TWO SMALL CANOPY TREES FOR EVERY 50 LF OF STREET FRONTAGE.TSACHACHE LANE:148 FTNORTH 25TH AVENUE:413 FTBREEZE LANE:248 FTNORTH 27TH AVENUE402 FTTOTAL FRONTAGE:1,211 FT / 50 = 24.22 TREESTREES REQUIRED = 24 TREESTREES PROVIDED = 19 TREESNUMBER PROVIDED IS LOWER THAN NUMBER REQUIRED DUE TO PARKING LOT ANDGARAGE ENTRANCES, BUS STOP AREA, AND UTILITIES.SITE TREE REQUIREMENT*TREES REQUIRED: 1 TREE PER 1,600 SF OF LANDSCAPED AREA12,720 SF (SITE AREA 11,068 + 1,652 PARKING LOT)/ 1,600 SF = 7.95 = 8 TREESTREES PROVIDED = 8 TREESPARKING LOT LANDSCAPINGLANDSCAPE AREA REQUIRED: 20 SF FOR EVERY PARKING STALL20 SF x 67 STALLS = 1,340 SFLANDSCAPING AREA PROVIDED = 1,652 SFSCREENINGLANDSCAPE BUFFER AND SCREENING -PROVIDED: A PARTIAL SCREEN HEDGE, FOUR TO SIX FEET TALL, LOCATED SO AS TOSCREEN VEHICLES IN PARKING LOT.Know what'sbelow.before you dig.CallRSHEET INDEXL0.0LANDSCAPE NOTESL0.1LANDSCAPE SCHEDULEL1.0LANDSCAPE PLANL2.0LANDSCAPE DETAILSL5.0IRRIGATION NOTES AND SCHEDULEL6.0IRRIGATION PLANL7.0IRRIGATION DETAILSLANDSCAPE AREA LEGEND:BOULEVARD 8,549 SFSITE AREA11,068 SFPARKING LOT 1,652 SFW/IN 10' OF BLDG 4,964 SF*COMBINE SITE AND PARKINGLOT AREAS TO GET SITE TREEAREA FOR CALCULATIONS.LANDSCAPE AREASCALE: 1" = 40'NORTH 27TH AVENORTH 25TH AVEBREEZE LANE
TSCHACHE LANE
1 COB COMMENTSADD AREAS FOR TURF, SEED MIX, SHRUBS,EVERGREENS, GRASSES, ...LANDSCAPE DESIGN PLAN1.COMPLIANCE PATHWAY - PRESCRIPTIVE.2.TOTAL LANDSCAPED AREA 18,522 SF (60% = 11,113 SF)3.LANDSCAPED AREAS - PLANT TYPES & LOCATIONS4.SQUARE FOOTAGE AND PERCENT COVERAGE BASED OFF TOTAL LANDSCAPED AREAa.TURF - 0 SF / 0%b.SEED MIX (NATIVE WILDFLOWER) - 6,585 SF / 36%c.SHRUBS, EVERGREENS, GRASSES, GROUNDCOVERS - 11,937 SF / 64 %5.PLANT SCHEDULE6.TREES - MIN. LANDSCAPE AREA 16,243 SF (60%) / 1,600 = 10 TREES REQUIRED, 10TREES PROVIDED (4 CANOPY) OUTSIDE OF PARKING AND STREET TREES. NO EXISTINGTREES.7.MULCH - 3” FIR OR PINE BARK CHIPS, 3” PEA GRAVEL (DOG PARK).8.TOPSOIL - AMEND EXISTING TOPSOIL AT A RATE OF 4 CY COMPOST/1,000 SF. COMPOSTMUST MEET THE STATE OF MONTANA'S COMPOST REQUIREMENT FOR SOILAMENDMENT (ADMIN. RULE MONT. 17.50.1716). COMPOST MUST BE SPREAD ANDMIXED EVENLY INTO THE TOP 6 IN. OF TOPSOIL.9.WATER TREATMENT, STORMWATER RETENTION, OR STORMWATER DETENTION - SEEPLAN.10.EXEMPT AREAS PER SECTION 1.3 AND 1.4 - NA.