Loading...
HomeMy WebLinkAbout022.01 - Appendix S.2 - DNRC Exempt Well LetterFrom: Kae Sewell <ksewell@design5la.com> Sent: Tuesday, February 6, 2024 10:32 AM To: Tyler Steinway Cc: lhageman@m-m.net; Peter Ransone; Ellyn Livings; Blake Bernard Subject: FW: Turnrow Sub Review Aachments: Turnrow Exempt Well Le4er DNRC-240206.pdf Tyler, Please see below le4er from Kerri for our well request to the DNRC. We should include this with our reply to MSP comment #15. Thanks, Kae Sewell, PLA, ASLA O: 406.587.4873 C: 770-823-4474* www.design5la.com *I am working remotely, please reach me on my cell. From: Strasheim, Kerri <kstrasheim@mt.gov> Sent: Tuesday, February 6, 2024 12:21 PM To: Katie Sewell <ksewell@design5la.com>; Griffin Nielsen <GNielsen@BOZEMAN.NET> Subject: Turnrow Sub Review Katie - Thank you for the opportunity to review the Turnrow Subdivision. Four irrigation wells are planned. - Well #1 (phase 1 park) – 3.95 AF - Well #2 (open space east) – 1.47 AF - Well #3 (future park) – 2.53 AF - Well #4 (open space west) – 1.01 AF - Total use = 8.96 AF This does not exceed 10 AF. Each well cannot exceed 35 gallons per minute diversion rate. No permitting is required in advance. The City of Bozeman is providing all indoor uses. The City is responsible for ensuring that this use fits within existing water rights. Standard Language: In Clark Fork Coalition, et. al. v. DNRC, et. al., 2016 MT 229, 384 Mont. 503, 380 P.3d 771, the Montana Supreme Court concluded that the definition of “combined appropriation” in Admin. R. Mont. 36.12.101(13) was invalid. The Court reinstated the Department’s 1987 Rule defining “combined appropriation” as: “An appropriation of water from the same source aquifer by means of two or more groundwater developments, the purpose of which, in the department’s judgment, could have been accomplished by a single appropriation. Groundwater developments need not be physically connected nor have a common distribution system to be considered a “combined appropriation.” They can be separate developed springs or wells to separate parts of a project or development. Such wells and springs need not be developed simultaneously. They can be developed gradually or in increments. The amount of water appropriated from the entire project or development from these groundwater developments in the same source aquifer is the “combined appropriation.” Under this Rule, the Department interprets subdivisions that are pending before the Department of Environmental Quality for approval on October 17, 2014 or filed after that date to be a single project that can be accomplished by a single appropriation. Consequently, all wells in such a subdivision will be considered a “combined appropriation” for the purposes of Mont. Code Ann. 85-2-306. The only exception to this interpretation is that a subdivision which has received preliminary plat approval prior to October 17, 2014 will not be considered a project under the “combined appropriation” 1987 Rule; individual lots will still be evaluated under the 1987 Rule at the time of an application to the Department. 2015 Mont. Laws § 1, Ch. 221. This communication does not serve as a pre-approval for a water right. Have a good day, Kerri Geocode: Kerri Strasheim |Regional Manager Bozeman Water Resources Office Montana Department of Natural Resources and Conservaon 2273 Boot Hill Court, Suite 110; Bozeman, MT 59715 DESK: 406-556-4504 EMAIL: kstrasheim@mt.gov Website | Facebook | X (Twier ) | Instagram How did we do? Let us know here: Feedback Survey Page 1 of 1 February 6, 2024 Kerri Strasheim DNRC – Bozeman Water Resources Regional Office 2273 Boothill Court, Suite 110 Bozeman, MT 59715 RE: Exempt Well Determination for Turnrow Subdivision Dear Kerri: I am requesting approval for 4 wells sharing 1 exempt well water right for the Turnrow Subdivision located at the SW corner of East Valley Center Drive and Davis Lane in northwest Bozeman. Irrigation Water Demands The sum of the landscaped areas is 7.73 acres. The annual volume of water required to irrigate this acreage is based on the following assumed irrigation demands: Sod with H.E. Rotary spray Irrigation: 577,150 gallons/year Native Seed with H.E. Rotary spray irrigation: 2,152,565 gallons/year 510 Trees with H.E. bubblers: 151,470 gallons/year 270 Shrubs with H.E. bubblers: 36,450 gallons/year Total Use: 8.95 acre feet per year *** The Well / Irrigation system will be zoned to ensure that demand will not exceed 35 GPM or 10-acre ft per year. Please find included for your review the well exhibit that will be submitted to the City of Bozeman Planning Department. If you have any questions or comments about this project, please feel free to contact me at 406-587-4873. Sincerely, Troy Scherer, PLA, ASLA Design 5 Landscape Architecture 111 North Tracy Avenue Bozeman, MT 59715 troy@design5la.com O 406-587-4873 SYMBOLSIZEDESCRIPTIONIRRIGATION LEGEND*BACKFLOW PREVENTER1"BFCONNECTION POINTCPIRRIGATION SLEEVE, 4" MIN. SCH 40 PVCSEEPLANN/AWELLN/AWIRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O25,139 SF29 IN / SF454,186 GALH.E.SPRAY IRRIG. SOD 217,717 SF6 IN / SF813,826 GALH.E.SPRAY IRRIG. SEEDH.E. TREEBUBBLER65 TREES16.5 GAL /WEEK19,305 GALH.E. SHRUBDRIP IRRIG.0 SHRUBS7.5 GAL /WEEK0 GALTOTAL ANNUAL H2O REQUIRED: 1,287,317 GALTOTAL ACRE FEET PER YEAR: 3.95 ACRE FEETIRRIGATION SCHEDULE - WELL #1PROPOSED WELL TO IRRIGATE PH1 PARKIRRIGATION SCHEDULE - WELL #2PROPOSED WELL TO IRRIGATE OPEN SPACEIRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O119,102 SF6 IN / SF445,203GALH.E.SPRAY IRRIG. SEEDH.E. TREEBUBBLER104 TREES16.5 GAL /WEEK30,888 GALTOTAL ANNUAL H2O REQUIRED: 478,251 GALTOTAL ACRE FEET PER YEAR: 1.47 ACRE FEETH.E. SHRUBDRIP IRRIG.16 SHRUBS7.5 GAL /WEEK2,160 GALIRRIGATION SCHEDULE - WELL #3PROPOSED WELL TO IRRIGATE FUTURE PARKIRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O158,229 SF6 IN / SF591,460 GALH.E.SPRAY IRRIG. SEEDH.E. TREEBUBBLER252 TREES16.5 GAL /WEEK74,844 GALTOTAL ANNUAL H2O REQUIRED: 823,558 GALTOTAL ACRE FEET PER YEAR: 2.53 ACRE FEETH.E. SHRUBDRIP IRRIG.254 SHRUBS7.5 GAL /WEEK34,290 GAL6,806 SF29 IN / SF122,964 GALH.E.SPRAY IRRIG. SODTERRY F SCHAPLOW5293 DAVIS LNBOZEMAN, MT 59718-9712 TVTVSSTOHPOHPOHPOHPOHPOHPMWMWMWSSSSSSFTVTVTVTVTVTVEEEEEEPTTTTTTTTTTTTTBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBTBTBTBTBTBTBTBTBTBTBTBTV BTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVX X X X XXXXXXXXXXXX XXXXXXXXXX XXXXNGNGNGNGNGNGNGNGNGNGNGNGOHPOHPOHPOHPOHPOHPOHPOHPMW BTBTBTBTBTBTBTBTBTBTBT B T CO TV TV TV DYH DYH DYH FSSST TTWV WV WV WV WV WV WV XXXX X X XXXXXXOHPOHP OHP OHP OHP OHP SSSSSW W W WWOHPTXFTTXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP8W 8W 8W 8W 8 W 8 W 8 W 8 W 8W 8 W8W8W 8W8W8W12W12W12W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8 W 8 W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 12W12W12W12W12W12W12W12W12W12W12W12W12W12W8 W 8 W 8 W 8W 8W8W8W8W8W8W8W8W8W8WB B8W8 W8W8 W 8W 8W B B 8W 8W 8W8W8W 8W DYHDYHDYHDYHDYHDYHDYHDYHDYH 8WDYH DYH8W8W 8W 8WDYHDYHDYHDYHDYH DYH DYHDYH 12W12WDYH DY HDYHDYHDYH DYH DY HDYHDYH DYHDYH DYH 8W8W8W 8W B DYH BB B B B B BB BB BBB B 8W8W8 W 8 W 8W 8 W 8 W 8 W B 8W8W8W8W8W8W8W8W8W8W8W8W8W8WB 12W12W12W12W8WB8W8W8W8W8WDYHB BB8W8W8W 8W8W8W8W8WDYH BDYH DYH8W8W8W8W8W8W B DYHDYH DYHDYH DYHSSSSSSSSSSSSSSSSSSSS S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS8S8SS S S S S S S S S S S S S S S S S S S SSSSS SSSSSSSSS8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S 8S 8S 8S 8S 8SSSS SSSSSSSSS S S S S S S SSS SSSSSSSSSSSSSS SSSSSSSSSSSSSSSS S S SS S8S 8 S 8 SSS SSSSSSSSSSSSSSSSSSSSS8S8S8SSSSSSSSSSSSSSSSSSS8S8S8SS8S 8S SSSS8S8S 8S8S8S 8S8S8S 8S8S8S 8S 8S 8S 8S 8S 8S 8 S 8 S 8SSSSSS SSSSSSSSSSSSSSSSSFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS12SD30SD30SD24SD24SD24SD18SD18SD18SD15SD15SD15SD15SD15SD18SD 18SD 18SD 18SD 18SD 18SD 15SD 15 S DDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD12SD 12SD 12SD 12SD 12SD 12SD15SD15SDDD D15SDD 15 S D 15 S D 1 5 S D 15SD 15SD D15SDDDDDDDDDMHHHHHHHHHH HH HH HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHMO.S. 10.87acs.O.S. 110.32acs.O.S. 150.04 acs.PARK 21.01 acs.O.S. 100.04 acs.O.S. 80.04 acs.O.S. 160.34acs.O.S. 12 0.04 acs. O.S. 130.05 acs. O.S. 14 0.04 acs. O.S . 1 7 0.04 a c s . O.S. 90.04 acs.O.S. 70.04 acs.PARK 12.47 acs.O.S. 60.09acs.O. S . 1 8 0.05 a c s .O.S. 30.33acs.O.S. 20.05acs.O.S. 40.05acs . O.S. 50.06 acs. RWWREDREDREDRED REDREDSIOLANLANSIO SIOSIOJAPJAPJAPAMUAMUAMU WES LAN WES LANWESWWWELL #1WELL #2WWELL #3WWELL #4IRRIGATION SCHEDULE - WELL #4PROPOSED WELL TO IRRIGATE OPEN SPACEIRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O80,812 SF6 IN / SF302,075 GALH.E.SPRAY IRRIG. SEEDH.E. TREEBUBBLER89 TREES16.5 GAL /WEEK26,433 GALTOTAL ANNUAL H2O REQUIRED: 328,508 GALTOTAL ACRE FEET PER YEAR: 1.01 ACRE FEETH.E. SHRUBDRIP IRRIG.0 SHRUBS7.5 GAL /WEEK0 GALTOTAL WELL IRRIGATION SCHEDULEIRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O31,945 SFTOTAL29 IN / SF577,150 GALTOTALH.E.SPRAYIRRIG. SOD575,860 SFTOTAL6 IN / SF2,152,565GALTOTALH.E.SPRAYIRRIG. SEEDH.E. TREEBUBBLER510 TREESTOTAL16.5 GAL /WEEK151,470 GALTOTALH.E. SHRUBDRIP IRRIG.270 SHRUBSTOTAL7.5 GAL /WEEK36,450 GALTOTALTOTAL ANNUAL H2O REQUIRED: 2,917,635 GALTOTAL ACRE FEET PER YEAR: 8.95 ACRE FEETIrrigation WaterUse Estimate -OverallL 600design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\turnrow subdivision\autocad\01_sheets\phase 1 blvds + os sheets\l600_turnrow_sub_ph1_os_irrigation.dwg Turnrow Subdivision Phase 1 Boulevards & Open Space Bozeman, Montana KHM/HU TMS 12/08/23PH1 Prelim Plat150750300N1L6001"=150'-0"Irrigation Water Use Estimate - Overall