HomeMy WebLinkAbout011.01 - Appendix K.2 - Westlake Section ApprovalRE: [EXTERNAL]Westlake Turnrow
Lance Lehigh <llehigh@BOZEMAN.NET>
Wed 1/24/2024 9:50 AM
To: Rob Pertzborn <rpertzborn@intrinsikarchitecture.com>; Lee Hageman <lhageman@m-m.net>; Tyler Steinway
<tsteinway@intrinsikarchitecture.com>; Peter Ransone <peter@virgacapital.com>
Cc: Nicholas Ross <nross@BOZEMAN.NET>; Shawn Kohtz <SKohtz@BOZEMAN.NET>; Taylor Lonsdale
<tlonsdale@BOZEMAN.NET>; Mikaela Schultz <mschultz@BOZEMAN.NET>; Jonathan Fuller <jfuller@BOZEMAN.NET>; Danielle
Garber <DGarber@BOZEMAN.NET>; Scott Mueller <SMueller@BOZEMAN.NET>
2 attachments (2 KB)
ATT00001.txt; ATT00002.htm;
***This message originated from an External Source.*** Please use proper judgment and cau on when
opening a achments, clicking links, or responding to this message.
Rob,
The Director of Transporta on and City Engineer have reviewed the proposed modified Westlake Road Sec on
provided to City Staff on 1-18-24.
Under their review authority, the modified street sec on is acceptable. Please let the team know if you have any
further ques ons.
Lance
City of Bozeman MT
Lance Lehigh, PE, CFM | Engineer III
From: Lance Lehigh
Sent: Friday, January 19, 2024 10:55 AM
To: Rob Pertzborn <rpertzborn@intrinsikarchitecture.com>
Cc: Nicholas Ross <nross@BOZEMAN.NET>; Shawn Kohtz <SKohtz@BOZEMAN.NET>; Taylor Lonsdale
<tlonsdale@BOZEMAN.NET>; Mikaela Schultz <mschultz@BOZEMAN.NET>; Jonathan Fuller
<jfuller@BOZEMAN.NET>; Danielle Garber <DGarber@BOZEMAN.NET>
Subject: FW: [EXTERNAL]Westlake Turnrow
Thank you Rob, I have CC’d the review team.
Mikaela, please schedule a me to discuss the street sec on with Director Ross.
Lance
City of Bozeman MT
Lance Lehigh, PE, CFM | Engineer III
From: Rob Pertzborn <rpertzborn@intrinsikarchitecture.com>
Sent: Friday, January 19, 2024 10:20 AM
To: Lance Lehigh <llehigh@BOZEMAN.NET>
Cc: Nicholas Ross <nross@BOZEMAN.NET>; Shawn Kohtz <SKohtz@BOZEMAN.NET>
Subject: RE: [EXTERNAL]Westlake Turnrow
CAUTION: This email originated from outside of the organiza on. Do not click links or open a achments unless you
recognize the sender and know the content is safe.
Thanks Lance.
Please see updated diagram a ached. 20’ drivable.
Happy to discuss.
RJP
Robert J. Pertzborn AIA Senior Principal | Architect
Intrinsik Architecture, Inc.
106 East Babcock Street Suite 1A Bozeman, Montana 59715
O. 406.582.8988 Direct: 406.426.9557 M. 406.580.0422
From: Lance Lehigh <llehigh@BOZEMAN.NET>
Sent: Tuesday, January 16, 2024 9:50 AM
To: Rob Pertzborn <rpertzborn@intrinsikarchitecture.com>
Cc: Nicholas Ross <nross@BOZEMAN.NET>; Shawn Kohtz <SKohtz@BOZEMAN.NET>
Subject: RE: [EXTERNAL]Westlake Turnrow
Good morning Rob,
The conversa on last Friday was about the fire department's requirement of at least 20 feet free and clear
concerning the Westlake Road sec on. At this point, we asked the applicant to provide engineering with an
updated street cross-sec on for Westlake, showing the fire department's spacing requirement, and an exhibit
showing the extent of the par cular sec on (i.e is it next to a park, housing, etc.)
The applicant's half-street does not meet the City’s complete street standard a. In order for the applica on to be
deemed adequate the applicant would need to seek a departure for the proposed street sec on under, which is
granted under the authority of the Director of Engineering and Transpora on (38.200.010.F.3.).
Once the materials have been provided, the engineering team was going to forward the request to Nick Ross for
review. I have not had the opportunity to talk with Director Ross about the changes to the street sec on.
Thanks,
Lance
City of Bozeman MT
Lance Lehigh, PE, CFM | Engineer III
From: Rob Pertzborn <rpertzborn@intrinsikarchitecture.com>
Sent: Tuesday, January 16, 2024 8:31 AM
To: Lance Lehigh <llehigh@BOZEMAN.NET>
Subject: [EXTERNAL]Westlake Turnrow
Importance: High
CAUTION: This email originated from outside of the organiza on. Do not click links or open a achments unless you
recognize the sender and know the content is safe.
Hi Lance –
Sorry I was not able to be on Friday’s call, but Tyler debriefed me.
My understanding is that you were going to speak with Nick about a resolu on.
It sure seems like the simple answer is no parking on the street, but I am not seeing all the angles.
As me is of the essence – have you had a minute to talk to Nick?
Please let me know what you know. I am happy to jump on a call to resolve.
Much appreciated,
RJP
Robert J. Pertzborn AIA Senior Principal | Architect
Intrinsik Architecture, Inc.
106 East Babcock Street Suite 1A Bozeman, Montana 59715
O. 406.582.8988 Direct: 406.426.9557 M. 406.580.0422
TURNROW SUBDIVISION
Proposed Westlake Road Interim Section
1.5’ Gravel
Shoulder 10’
Driving Lane
10’
Driving Lane
10’
Setback
Townhouses
4’
Boulevard
5’
Sidewalk
32’28’
Future ROW
Fence
(Existing Unwilling Landowner)*Both sides signed
“No Parking/Fire Lane”
20'
Drivable Surface
RibbonCurb