HomeMy WebLinkAbout068 - L 600 - Irrigation Water Use Estimate -Phase 1 ParkWWWELL #1WELL #2BFCPBFCP30'50'30'50'NGNGNGNGNGNGNGTVTVSSOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPTPTPOHPOHPOHPSSSSSSSSSSSSTVTVTTBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFB
T
V BTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVB
T
V XXXXXXXXNGNGNGNGNGNGNGNGOHPOHPOHPOHPXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT
BTBTBTBTBT
BT COTV
TVDYH
DYH DYH
FSSSTTWV
WV WV
WV
WV
WV
WV
XXXXXX
X
X
X
X
XXXXXXXX X XXX X
XOHPOHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
SSSSSSSSSSSW W W W W
WWW8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W
8W8W12W12W12W12W12W12W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W12W 12W 12W 12W 12W 12W8W8W12W12W12W12W12W12W12W12W12W12W12W12W8W8W8W8W8W8W8W8W8W8W8W8W8W8WDYHDYHDYH8W8W8W8W8W8W8WDYHDYHDYHDYHDYHDYH
DYHDYHDYHDYHDYHDYH
DYH DYHDYH8W8W8W8W8W 8W
8W 8W
B
DYHBB B BBB
BB 8W 8W 8W 8W 8W 8W 8W 8W8W12W12W
12W12W12W12W12W12W12WBDYHB8W8W8W8W8W8W8W8W8W8W8W8W8W
8W8W8WBDYHWSWS
WS
WSWSWSWS
WSWSWSWSWSWSWSWSWSWS
WS
WS WSWSWSWSWSFIREBWS8W8W8W
8W
8WDYH 8W 8W 8W
8
W
8
W
WSWS
WS
WSWSWSWSWSWSWSWSWSWSWSWSWS WS
8W8W8W8W8W8W8W8W8W8W8WDYH
VERT
2
2
.5
VERT
2
2
.5
VERT
2
2
.
5
VERT 22.5 WSFIREVERT 11.25VERT 11.25
8W 8W 8W 8W 8W 8W SSSS S S S S S S SSSSS SSSSSSSSSSSS15S 15S 15S 15S 15S 15S 15SS
SSSSSSSSS8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S10S10S10S10S10S10S 10S 10S 10S 10S 10S 10S 10S 10S
10S
SSSSSSSSSSS S S S S S SSSSSSSSSSSSSS SSSS8S8S8S8S8S8S 8S
8S 8S SSSS8S 8S 8S8S8S8S8S8S8S
8S8S
8S 8S 8S8S8S 8S8S8S 8S 8S8S8S8S10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10SSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS SS
SSSSSSSSSSSS
SS
SS
SSSSSSSSSSSS SSSS SSSSS SSSSSSSSSSSSSS FMFMFMFMFMFMFMFMFMFM8S8S8SSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSS10S15SD 24SD24SD18SD18SD18SD18SD18SD18SD15SD15SD15SD 15SD 15SD
18SD 18SD 18SD15SD 15SD 15SD 15SDD
DDDDDDDDDDDDDD12SD15SD 15SD 15SD 15SD 15SD 15SD 15SD
15SD D15SD 15SD 15SD 15SD 15SD 15SD
15SD
DDDD15SDDDDDDDDDDDDDDDD18SDMHHHHHHHHHHHHHH HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHMMHHBTBTBTBT
BT
BT
BT
BT BT
BTBTBTBTBTBTBTBT BT
BT
BT
BT
BT
BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT BT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT BT BT BTBTBTBT
BT
BT
BT BTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT BT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT BT
BT
BT
BT BT BT BTBTBTBT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT
BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT +21.0+20.046204620+20.0+22.0++23.0+22.0+21.0+20.04620+27.0+27.0+28.0+29.0+30.0+31.0+31.0+30.0+28.0+29.0463046354625 23.01%1%2.8%2.0%+23.046253.9%GASEASEMENT10'PUE10'PUE10'PUE10'PUE10'PUE+22.05.0%+22.0+20.0+21.0+20.0
+20.0+21.0
5.0%2.8%+22.0+22.0
+22.0+23.0 1.0%+21.63 2.0%+21.32+22.95+22.11
1.0%+22.66 +22.40+22.46
+21.62
+21.91
+22.17+28.90 2.0%+28.73+30.60 2.0%+30.40 3.9%RWWREDREDREDREDREDREDSIOLANLANSIO
SIOSIOSNOSPRSPRSPR SNO SNO SPRSPR SPRSPR SPRSNO SNO SNO
SPR
SPRSNO SNO
FUTURE PHASEPHASE 1 FUTURE PHASEPHASE 1 FUTURE PHASEPHASE 1BLOCK 4LOTS 27-34O.S.11BLOCK 4LOTS 1-26BLOCK 5LOTS 1-26O.S.16BLOCK 5LOTS 27-44PARK 21.01 ACTURNROW TRAILDURANGO LANEGUNSMOKE AVENUE GUNSMOKE AVENUEDAVIS LANE E VALLEY CENTER DRIVEBLOCK 1RESTRICTEDLOT 5COMMERICALO.S.1O.S. 2BLOCK 2LOTS 1-25BLOCK 2LOTS 1-25O.S. 3O.S.6BLOCK 3LOTS 1-17PARK 12.50 ACO.S. 5WESTLAKE ROADBLOCK 10LOTS 1-3BLOCK 9LOTS 1-3BLOCK 6-1LOTS 1-12BLOCK 7RESTRICTED LOT 3FERGUSON AVEFUTUREPARKPARK 10-32.20 ACGASEASE BOOMERANG ROADQUICK
S
I
L
V
E
R
R
O
A
D
QUICKSILVER ROAD
TURNROW TRAILDURANGO LANETURNROW TRAILTEMERITY LANEO.S.13O.S.15O.S.14O.S.12O.S.8O.S.7O.S.9O.S.10O.S. 4BLOCK 1RESTRICTEDLOT 6COMMERCIALBLOCK 1RESTRICTEDLOT 4COMMERCIALBLOCK 1LOT 1COMMERCIALBLOCK 1LOT 2COMMERCIALBLOCK 1LOT 4COMMERCIALBLOCK 1LOT 3COMMERCIALBLOCK 6-1LOTS 1-12BLOCK 6-2RESTRICTEDLOT 23BLOCK 8RESTRICTEDLOT 11-ABLOCK 8RESTRICTEDLOT 11-BBLOCK 9RESTRICTEDLOT 18-BEASE BLOCK 6-2RESTRICTEDLOT 23SYMBOLSIZEDESCRIPTIONIRRIGATION LEGENDBACKFLOW PREVENTER1"BFCONNECTION POINTCPIRRIGATION SLEEVE, 4" MIN. SCH 40 PVCNOTES:-IRRIGATION LAYOUT TO BE DETERMINED IN FIELD BYIRRIGATION CONTRACTOR-FINAL IRRIGATION AS-BUILT MAPS TO BE PROVIDED TOTHE CITY OF BOZEMAN PARKS DIVISION-WELLS TO BE INSTALLED AT DISTANCE FROM SANITARYSEWER LINES PER CURRENT REGULATIONS-IRRIGATION SYSTEM TO BE HUNTER 2-WIRESYSTEM/DECODERS WITH HUNTER CONTROLLER ONMETAL PEDESTAL MOUNT, UNLESS OTHERWISEAPPROVED BY THE CITY'S PARKS OPS SUPTSEEPLANN/AWELLN/AWSCHEMATIC IRRIGATION MAINLINE - PH1 PARKSCHEMATIC IRRIGATION MAINLINE - PH1 OSFINISH GRADESCH. 40 PVC SLEEVE - 4" MIN. OR 2X THE O.D.OF THE IRRIGATION PIPINGWRAP 12 GAUGE WIRE AROUND EACH ENDOF THE SLEEVE AND EXTEND TO THESURFACEWASHED AND GRADED MORTARSAND BACKFILL IN ROCKY SOIL.PAVEMENT EDGENOTE:1.CAP SLEEVES UNTIL USE.2.4" MIN. HORIZONTAL SEPARATION REQUIRED BETWEEN SLEEVESIN THE SAME TRENCH.3.IRRIGATION PIPE AND CONTROL WIRES SHALL BE SLEEVEDSEPARATELY.4.SOIL AROUND SLEEVE BACKFILLED AND COMPACTED TO THESAME DENSITY AS THE SURROUNDING SOIL.DEPTH PER TRENCHING DETAIL2L602NTSIrrigation SleeveIRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O7,018 SF29 IN / SF126,794 GALH.E.SPRAY
IRRIG. SOD
99,957 SF6 IN / SF373,636 GALH.E.SPRAY
IRRIG. NATIVE
SEEDH.E. TREEBUBBLER66 TREES16.5 GAL /WEEK19,602 GALH.E. SHRUBDRIP IRRIG.0 SHRUBS7.5 GAL /WEEK0 GALTOTAL ANNUAL H2O REQUIRED: 749,138 GALTOTAL ACRE FEET PER YEAR: 2.30ACRE FEETIRRIGATION SCHEDULE - WELL #1PROPOSED WELL TO IRRIGATE PH1 PARKS7,018 SF29 IN / SF126,794 GALTEMPORARY
SPRAY IRR.
TURF SEED
24,523 SF6 IN / SF91,667 GALTEMPORARY
IRR. NATIVE
WET SEEDGENERAL IRRIGATION NOTES:1.ALL SECTIONS OF MAINLINE CROSSING UNDER CONCRETE, ROADS, OR OTHER LARGE HARDSCAPE SURFACES TOBE IN SCH. 40 PVC SLEEVES.1.1.SLEEVES TO BE DOUBLE THE DIAMETER OF PROPOSED MAINLINE.1.2.LATERAL LINE SLEEVES TO BE SCH. 40 PVC AT LEAST DOUBLE THE DIAMETER OF THE LATERAL LINE SIZEPROPOSED.2.ALL SYSTEMS TO BE ON A LOOPED MAINLINE WHERE POSSIBLE, REFER TO CONCEPTUAL IRRIGATION MAINLINELAYOUT.3.ALL SYSTEMS WILL BE 2 WIRE DECODER TYPE SYSTEMS.4.ALL INFORMATION SHOWN ON CONCEPTUAL DRAWINGS TO BE VERIFIED BY IRRIGATION DESIGNER, ANDCONTRACTOR. COORDINATION WITH GENERAL CONTRACTOR IS NECESSARY BEFORE CONSTRUCTION BEGINSTO ENSURE PROPER LOCATION OF SLEEVES, ELECTRICAL CONNECTIONS, AND WATER SOURCE CONNECTIONS.5.ALL IRRIGATION COMPONENTS TO BE HIGH EFFICIENCY, HEADS, NOZZLES, DRIP, VALVES, AND FITTINGS.GENERAL IRRIGATION NOTES AND SPECIFICATIONS1.THESE PLANS PROVIDE GENERAL ANTICIPATED WATER DEMAND AND TYPE OF IRRIGATION FOR THE SUBDIVISIONPARKS, WHICH ARE IRRIGATED BY (1) WELL. THE SUBDIVISION OPEN SPACES AND DETENTION PONDS AREIRRIGATION BY (1) EXISTING WELL ON SITE. THE WELLS WILL NOT BE CONNECTED IN ANY WAY. ALL FUTUREPARKS AND OPEN SPACES WILL HAVE A DEDICATED WELL.2.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER3.IRRIGATION MAIN LINE TO BE SCH. 40 PVC SOLVENT WELDED PVC IN CONTINUOUS LOOP, SIZE OF LINEDEPENDENT ON WATER DEMAND AS DETERMINED BY LANDSCAPE CONTRACTOR. LATERAL LINES TO BE 1" SCH 40SOLVENT WELDED PVC; DEPENDENT ON PRESSURES AND GALLONS PER MINUTE AT DISCRETION OF LANDSCAPECONTRACTOR BASED ON PROFESSIONAL EXPERIENCE AND OPINION UPON DESIGN AND INSTALLATION OF THESYSTEM.4.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTED AROUND BASE OF TREEWITH FOUR (4) EVENLY SPACED 1 GPH BUBBLER EMITTERS.5.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUALPLANT REQUIREMENTS.6.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED 1 GPH EMITTER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERSADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PERPLAN.8.1.ALL SPRAY OR ROTOR OVERHEAD IRRIGATION HEADS WILL BE INSTALLED AND ADJUSTED PROPERLY TOMINIMIZE WATER OVER THROW ONTO PAVEMENT.8.2.ALL SPRAY OR ROTOR OVERHEAD IRRIGATION TO UTILIZE WATER EFFICIENT NOZZLES (MULTI-SPRAY,MULTI-TRAJECTORY, OR ROTATING SPRAY).9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN APPROVED EXTERNAL GRADEBOX, ANDIS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PER LOCAL CODESAND ORDINANCES, WITH ARCHITECTURE AND WITH ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALLTIMES.16.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF 0.4-0.8"/sqft.TEMPORARY IRRIGATION NOTES:TOTAL AREA TO RECEIVE TEMPORARY IRRIGATION (PHASE I) : 68,163 SF (1.56 AC)(FUTURE): 349,626 SF (8.02 AC)1.ALL TEMPORARY IRRIGATION WILL OPERATE FOR NO MORE THAN 3 YEARS. AFTER 3 YEARS, TEMPORARY ZONESWILL BE SET TO "0" RUN TIME.2.TEMPORARY ZONES WILL BE WATERED AT 2.3 GAL/SF3.SEE TABLES ON L601 FOR WATER DEMAND.*TEMPORARY IRRIGATION NOTES:-TEMPORARY IRRIGATION WILL CONSIST OF A PERMANENT UNDERGROUNDIRRIGATION SYSTEM WHICH WILL BE ACTIVE FOR FIRST 3 GROWINGSEASONS, AFTER WHICH POWER WILL BE DISCONNECTED OR TIMERS SETTO ZERO.-MONTHLY WATER USE CAN BE FOUND BY DIVIDING THE ANNUAL WATERUSE BY 4.5 ACTIVE MONTHS80400120N1L6011"=80'-0"Irrigation Water Use Estimate - Phase 1 Park Irrigation WaterUse Estimate -Phase 1 ParkL 601design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\turnrow subdivision\autocad\01_sheets\phase 1 parks sheets\l600_turnrow_sub_ph1parks_irrigation.dwg
Turnrow Subdivision: Phase 1 Parks
Bozeman, Montana
KHM/HU TMS
12/08/23PH1 Prelim Plat04/26/24MSP & PH1 PP06/04/24Infrastructure08/09/24MSP & PH1 PPIRRIGATION CONNECTION POINTAT WELL, SEE LANDSCAPECONTRACTOR FOR DETAILSIRRIGATION CONNECTION POINTAT WELL, SEE LANDSCAPECONTRACTOR FOR DETAILSIRRIGATION SLEEVE, TYP.IRRIGATION SLEEVE, TYP.