Loading...
HomeMy WebLinkAbout066 - L 500 - Landscape Details1L5003/8" = 1'-0"Not Used2L5003/8" = 1'-0"Typ. Deciduous Tree B&B PlantingMIN. 2 X ROOT BALL DIAM.FINISH GRADEELEVATION OF TREE FLARE TO BE 2" ABOVEFINISH GRADE ELEVATION. REMOVE EXCESSSOIL FROM ROOT BALL, AS REQUIRED, INORDER TO EXPOSE FLAREPLANTING PIT. PIT TO HAVE BROADLYSLOPING SIDES; SCARIFY SIDES OF PIT. SOILAT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3" DIAM.)FROM PIT PRIOR TO PLANTINGBACKFILL WITH MIX: 13 NATIVE BACKFILLSOIL, 13 SANDY LOAM AND 13 DEBRISFREE TOPSOILNATIVE SOILTREE STAKING, SEE SHEET L500: DETAIL 3ROOT BALL3" - 4" LAYER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH TRUNK3" HIGH ROUND-TOPPED CIRCULAR RING FORWATER RETENTION. FORM RING OF SOILALONG THE PERIMETER OF THE PLANTING PITFINISH GRADETREE FENCE / CAGE. CAGE SHALL BE MIN. 6'TALL. FASTEN CAGE TO STAKE WITH CABLETIES OR WIRE. CAGE TO BE NO. 14 GAUGEGALVANIZED WELDED WIRE MESH 2" X 4"TWO 2" X 2" X 8' HARDWOOD STAKES DRIVENMIN. 24" BELOW FINISHED GRADE AND MIN. 6'HEIGHT ABOVE FINISHED GRADE. STAKES TOBE SET OUTSIDE OF TREE DRIP LINE. STEELSTAKES MAY BE USED FOR LARGER TREES.STAKES SHALL NOT PENETRATE ROOT BALL.REMOVE STAKES AFTER TWO YEARSPROTECT TREE TRUNK WITH APPROVED PLANTTIE MATERIAL. SET TIES LOOSE ENOUGH TOALLOW FOR TRUNK AND ROOT DEVELOPMENT.TIES TO BE OF SOFT, WIDE (MIN. 1") POLYMERMATERIAL. WIRE SHALL NOT BE WRAPPEDAROUND TRUNK. FASTEN TIES AT LESS THAN 13OF THE TOTAL TREE HEIGHT, AT LOWESTBRANCHES TO PREVENT SLIDING10" GAUGE WIREINDUSTRY GRADE PLASTIC TREE GUARDS,DO NOT USE TRUNK WRAPS3L5003/8" = 1'-0"Typ. Plant Protection Methods6'-0"4L5003/4" = 1'-0"Not Used6L5003/4" = 1'-0"Typ. Planting BedNOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 3" DIAMETER)2.ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOMTO REMOVE GLAZING. ALL BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1"COMPOST WITH MIN. 17" NEW TOPSOIL, FOR A COMBINED SETTLED DEPTH OF 18".RAKE SMOOTH TO MATCH FINAL GRADING PLANFINISH GRADE3" - 4" MULCH LAYER,MULCH TYPE PER PLAN.DO NOT ALLOW MULCHTO COME IN CONTACTWITH SHRUB STEMSTOPSOIL, SEE NOTE 2NATIVE SOILPLANT CROWN TO BEPLANTED AT ORSLIGHTLY ABOVE FINISHGRADE AT MAXIMUM OF1"-2".SHEET L500 LANDSCAPE DETAILS NOTES:1.LANDSCAPE CONTRACTOR SHALL ASSURE PERCOLATION OFALL PLANTING PITS PRIOR TO INSTALLATION2.ALL CONTAINMENT MATERIALS AROUND ROOT BALL TO BEREMOVED PRIOR TO INSTALLATION2.1.CAREFULLY REMOVE ENTIRE WIRE BASKETS AT PLANTING2.2.CAREFULLY REMOVE ALL TREATED BURLAP (ROT-PROOF)AT PLANTING2.3.UNTREATED BURLAP MAY PARTIALLY REMAIN ON ROOTBALL. REMOVE BURLAP FROM TOP HALF OF ROOT BALLBEFORE COMPLETION OF PLANTING3.CONTAINER PLANTS: CAREFULLY CUT ANY CIRCLING ROOTS TOPREVENT PLANT FROM BECOMING ROOT BOUND4.PRUNE ALL PLANT MATERIAL PRIOR TO PLANTING, ON AN ASNEEDED BASIS. REMOVE DEAD AND / OR DAMAGED BRANCHES,LIMBS, AND LEAVES5.ALL TREES TO BE STAKED FOR 2 YEARS. REMOVE STAKESAFTER TWO YEARS6.ALL DECIDUOUS TREES AND SHRUBS NOT PLANTED INFOUNDATION BEDS TO BE FENCED FOR PROTECTION FROMUNGULATES AND OTHER HERBIVORES7.PROVIDE TREE GUARDS ON ALL DECIDUOUS TREES OUTSIDE OFPLANTING BEDS5L5001" = 1'-0"Boulder PlacementFINISH GRADEBOULDER, PER PLANCOMPACT AGGREGATEBASE @ 3" DEPTHNATIVE SOIL, PER PLAN13 TO 12 OF BOULDER TOBE BURIED BELOWFINISH GRADE7L5001" = 1'-0"Natural Steel Edging - Lawn1" REVEALNOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 2" DIAMETER) FROM NATIVE SOIL2.ALL LAWN AREA SURFACES TO BE LIGHTLY SCARIFIED OR LIGHTLY TILLED ANDRAKED SMOOTH. SOD AREAS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOSTWITH MIN. 5" NEW TOPSOIL FOR A COMBINED SETTLED DEPTH OF 6". TOPSOILSHALL BE DRUM ROLLED OR TRACK PACKED AND GRADED SMOOTHLY AND EVENLYPRIOR TO LAYING SOD. RAKE SMOOTH TO MATCH FINAL GRADING PLANFINISH GRADENATIVE SOIL316" X 4" NATURALSTEEL EDGINGTAC WELDED TO#4 REBAR DRIVENMIN. 18". REBARSPACED 24" O.C.PLANTING BED ORNATIVE SEED &SOIL, PER PLANTOPSOIL, SEE NOTE 2NATIVE GRASS SEEDING PER PLANTREES AND SHRUBS TO BE PLANTED IN NATURALIZEDGROUPING PER PLAN. ALL TREES AND SHRUBS TO BEPLANTED ABOVE ANY PERMANENT WATER LINE.SEE CIVIL FOR DETENTION POND DEPTH AND GRADINGBOULDERS TO BE PLACED IN NATURALIZEDGROUPINGS PER PLAN ALONG DETENTIONPOND BANKMAX 4:1 SLOPE9L5003/16" = 1'-0"Detention Pond Cross Section (Typ.), See Civil for Design8L5003/4" = 1'-0"Planting Bed at Pavement Edge1"REVEAL - SEE NOTE 26" - 12" SEENOTE 345°NOTE:1.SLOPE PLANTED AREAS AWAY FROM PAVED AREAS2.FINISH GRADE AT PAVEMENT EDGE MUST BE AT A LEVEL SUCH THAT THEESTABLISHED PLANTED SURFACE WILL BE ONE (0.5-1) INCH BELOW TOP OFPAVEMENT FOR A MINIMUM DISTANCE OF SIX (6) FEET FROM THE EDGE3.BASE MATERIAL AND COMPACTED SUBGRADE TO BE EXTENDED 1X-2X THE DEPTHOF THE BASE MATERIAL BEYOND THE EDGE OF THE PAVEMENT SYSTEM. TAPERBASE MATERIAL TOWARD THE COMPACTED SUBGRADE AT A 45° ANGLE90% - 95% COMPACTED SUBGRADENATIVE SOILPAVEMENT EDGE - SEE PLANS ANDPAVING DETAILS FOR ADDITIONALINFORMATION. SEE ALSO EDGINGDETAILS AS APPLICABLEAMENDED TOPSOIL3" - 4" MULCH LAYER,MULCH TYPE PER PLANFINISH GRADE, SEE NOTE 26" DEPTH OF 34" MINUS WASHEDAGGREGATE BASE MATERIALLandscapeDetailsL 500design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\turnrow subdivision\autocad\01_sheets\phase 1 parks sheets\l500_turnrow_sub_ph1parks_standarddetails.dwg Turnrow Subdivision: Phase 1 Parks Bozeman, Montana KHM/HU TMS 12/08/23PH1 Prelim Plat04/26/24MSP & PH1 PP06/04/24Infrastructure08/09/24MSP & PH1 PP