Loading...
HomeMy WebLinkAbout059 - L 002 - Landscape Notes & LegendsTREESSYMBOLBOTANICAL NAMESIZETYPESPACINGQUANTITYCOMMON NAMEPLANT SCHEDULE - PARKSMATUREHEIGHTMATURESPREADACER PLATANOIDES 'CRIMSON KING'***CRIMSON KING NORWAY MAPLE2" CALB & BPER PLAN1730' - 40'20' - 40'GLEDITSIA TRIACANTHOS VAR. INERMIS'SKYCOLE'***SKYLINE HONEYLOCUST-MALECULTIVARS ONLYQUERCUS RUBRA***RED OAK2" CALB & BPER PLAN630' - 60'40' - 60'2" CALB & BPER PLAN435' - 45'25' - 35'NOTE:-ALL TREES TO HAVE A 3' DIAMETER CEDAR BARK MULCH RING AROUND BASE OF TREE AT TIME OFINSTALLATION TO HELP PROMOTE HEALTH AND GROWTH.-ALL TREES TO RECEIVE INDIVIDUAL DRIP IRRIGATION ADJUSTED PER SPECIES FOR ESTABLISHMENT.-RECOMMENDED TO PLACE 6" DIAMETER PLASTIC TREE GUARD AROUND BASE OF ALL TREES TO PROTECTFROM TRIMMER AND MOWER DAMAGE DURING MAINTENANCE.-***INDICATES DROUGHT TOLERANT SPECIESACER PLATANOIDES 'HELENA' ***HELENA MAPLE2" CALB & BPER PLAN940'-60'30'REDB & BPER PLAN1955' - 60'35' - 40'ULMUS X 'MORTON GLOSSY' ***TRIUMPH ELM2" CALCELTIS OCCIDENTALIS***COMMON HACKBERRY2" CALB & BPER PLAN430' - 60'40' - 60'***INDICATES DROUGHT TOLERANT SPECIESTREESSYMBOLBOTANICAL NAMESIZETYPESPACINGQUANTITYCOMMON NAMEPLANT SCHEDULE - PARK STORMWATER PONDMATUREHEIGHTMATURESPREAD40'-60'30'-40'POPULUS SONGARICASONGARICA POPLAR2" CALB & BPOPULUS ACUMINATALANCELEAF POPLAR2" CALB & B50'-75'20'-40'SIOLAN42PER PLANPER PLAN***INDICATES DROUGHT TOLERANT SPECIESLANDSCAPE INSTALL NOTESGENERAL1.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIESPRIOR TO BEGINNING WORK. CALL 811.2.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48 HOURS IN ADVANCE.3.PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BENOTIFIED 48 HOURS IN ADVANCE.4.THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITEWITH THE LANDSCAPE ARCHITECT, WHEN APPLICABLE.5.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERYSTOCK.5.1.ALL DECIDUOUS TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO BEFENCED FOR MIN. 2 YEARS5.2.ALL TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE 3' DIAMETERMULCH RING.5.3.ALL TREES TO BE STAKED FOR MIN. 2 YEARS.6.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPEARCHITECT. ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE.406-587-4873 OR TROY@DESIGN5LA.COM.8.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, ATPREDETERMINED INTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.9.ALL EDGING SHALL BE 316" X 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEELFOR CURVED RUNS (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN AMINIMUM OF 18" DEEP.10.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPEPLAN ARE TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFYDISTURBANCE AREAS IN FIELD. CONTRACTOR IS RESPONSIBLE FOR THE COST OF RESTORINGANY DISTURBANCE OUTSIDE OF THE AGREED UPON LIMIT OF WORK BOUNDARY INDICATED ONTHE PLANS.11.VERIFY ALL CUSTOM SEED MIXES. THOSE PROCURED THROUGH WILD HARVEST METHODS (WINDRIVER SEED, BLAKE NURSERY, BIG SKY SEED, GREAT BASIN SEED) REQUIRE ORDERING AMINIMUM OF ONE YEAR IN ADVANCE OF INSTALLATION OR OTHER AS SPECIFIED BY SEEDPROVIDER.12.ALL ROCK MULCH IS TO BE WASHED PRIOR TO INSTALLATIONSITE SOIL PREP13.ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 3"DIAMETER AND ALL CONSTRUCTION DEBRIS TO BE PICKED UP AND REMOVED FROM SITEBEFORE SOIL AMENDMENTS ARE ADDED.14.SEED AREAS(WHEN APPLICABLE)- LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKESMOOTH PRIOR TO ADDING SOIL.-SEEDED AREA AMENDED TOPSOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINEDSETTLED DEPTH OF 6"). HYDROSEED WITH *FLEXTERRA TACKIFIER*. ADD EROSION CONTROLMAT TO ALL AREAS WITH SLOPES STEEPER THAN 3:1 PER MANUFACTURER'S SPECIFICATION15. SOD AREAS(WHEN APPLICABLE) - LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKESMOOTH PRIOR TO ADDING SOIL.-SOD AREA AMENDED SOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINED SETTLEDDEPTH OF 6"). TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKED AND GRADED SMOOTHLYAND EVENLY PRIOR TO LAYING SOD. RAKE SMOOTH TO MATCH FINAL GRADING PLAN.16. ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOM TO REMOVEGLAZING.17. ALL PLANTING BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOST WITH MIN. 17" NEWTOPSOIL (COMBINED SETTLED DEPTH OF 18"). RAKE SMOOTH TO MATCH FINAL GRADING PLAN.IRRIGATION18. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPEINSTALLATION. MAIN LINE, LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECTCOMPLETION WILL NOT BE ACCEPTED.19. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES ANDORDINANCES.Landscape Notes& LegendsL 002design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\turnrow subdivision\autocad\01_sheets\phase 1 parks sheets\l000_turnrow_sub_ph1parks_landscape.dwg Turnrow Subdivision: Phase 1 Parks Bozeman, Montana KHM/HU TMS 12/08/23PH1 Prelim Plat04/26/24MSP & PH1 PP06/04/24Infrastructure08/09/24MSP & PH1 PP