Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
013.04 - EX-5 - SUB-PHASE 1.3
PLAZA PATIO BTBTBTBTBTBTBTBTBTBTBT BT BT BT BT BT BTBTBTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTBTBT BT BT BTBT BT BTBTBTBTBTBTBTBTBTBT BT BT BTBTBT BTBT BT BT BT BT BT BT BT BT BT BTBTBTBTBTBTBTBT BT BT BT BT BTBTBTNG NG NG N G NG NG NG NG NG NG NG NG NG NG NG NG N G NG NG NG NG NG NG NG NG NG S S S S S S S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 10 S 10 S 10 S 10S10S10S10S10S10S10S10S10S10S10S10SS S S S S S S S 8S 8S 8S 8S 8S 8S 8S8S8SS S8S8S8S8S8S8S8S8S8S8S8S 8S 8S 8S 8S8S8S10S10S10S10S10S 10S 10S 10S 10S S S S S S S S S S S S SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SS SS SSSS SS SS SS SSSSSS SSSSSSSSSS12S 12S 12S 12S 12S S SSSS18S 18S 8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8 W 8 W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 12W 12W 12W 12W 12W 12W 8W8W8W8W8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W 8W 8W 8W 8W DYH DYH DYHDYHDYH DYHDYH 8W 8W 8W 8W 8W 8W 8W8W8W8WDYHB B8W 12W 12W 1 2W 12W12W12W12W12W12WB WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS 8W 8W 8W 8W 8 W WS WS WS WS WS WS WS WS WS WS WS WSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWS WS WS WS WS WS WS WS WSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWS8W 8W WS 8W8W8W8W8WWS WS WS WS WS WS S89°29'25"W 420.77' S0°36'43"W 189.74' S89°29'32"W 2221.92' 12S D 12S D 12S D 15SD 15SDD D D D D D D D D15SD15SD15SD15SD15SD 15SD 15SD 15SD 15SD15SD15SD15SD 24SD24SD24SD24SD24SD12SD D 12S D 12SD D 24SD 24S D DDDDDDDDDDDDDDDDDDDDDDDDDD D D D D D M HH HH HH HH HH HH HHHHHHHH HH HH HH BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4 BLOCK 5 BLOCK 6BLOCK 9BLOCK 10BLOCK 5 GENERAL NOTES: 1.SERVICE LINES TO FUTURE LOTS BEYOND PHASE 1 ARE NOT SHOWN. 2.ROADS SHOWN WITH FUTURE R.O.W. SHALL BE DEDICATED AS EASEMENTS DURING PHASE 1, UNLESS OTHERWISE NOTED. WATER NOTES: 1.WATER MAINS SHALL BE CONSTRUCTED OF DUCTILE IRON AND WRAPPED IN V-BIO ENHANCED POLYETHYLENE PER C.O.B. REQUIREMENTS, UNLESS OTHERWISE NOTED. 2.DOMESTIC WATER SERVICES SHALL BE 1" TYPE "K" COPPER PER C.O.B. STD. DETAILS NO. 02660-6 AND 02660-15, UNLESS NOTED OTHERWISE. SEWER NOTES: 1.SEWER MAINS SHALL BE CONSTRUCTED OF SDR-35 PVC PER C.O.B. STANDARDS. 2.SEWER MANHOLES SHALL BE INSTALLED PER C.O.B. STD. DWG. NO. 02720-3. 3.INSTALL SEWER SERVICE PER C.O.B. STD. DWG. NO. 02720-2. IF DEPTH OF COVER AT STUB END WILL EXCEED 6.5 FEET, FOLLOW C.O.B. STD. DWG. NO. 02720-3. 4.BUILDINGS WITHIN LOTS THAT ARE ELIGIBLE FOR CONCURRENT CONSTRUCTION SHALL HAVE A SEWER SERVICE VIDEO INSPECTION COMPLETED BY THE OWNER OF THE BUILDING TO VERIFY THAT NO DAMAGE OCCURRED DURING CONSTRUCTION ACTIVITIES. THE VIDEO SHALL BE REQUIRED TO BE SUBMITTED TO THE CITY OF BOZEMAN, AND OCCUPANCY SHALL NOT BE GRANTED FOR THE BUILDING UNTIL RECEIVED AND APPROVED BY THE CITY. FIGURE NUMBER © PROJECT NO.DRAWN BY: DSGN. BY: APPR. BY: DATE: COPYRIGHT MORRISON-MAIERLE,2024 Plotted by lee hageman on Jul/29/2024 engineers surveyors planners scientists MorrisonMaierle 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net N:\6916\003 - Turnrow Master Plan\ACAD\Exhibits\6916.003 - PHASING EXHIBIT.dwg6916.003 EX-5 TURNROW SUBDIVISION BOZEMAN MONTANA SUB-PHASE 1.3 RSP LGH LGH 04/25/24 50 10025500 SCALE IN FEETSUB-PHASE 1.4SUB-PHASE 1.2SUB-PHASE 1.3 SUB-PHASE 1.1 SUB-PHASE 1.3SUB-PHASE 1.3 SUB-PHASE 1.3SUB-PHASE 1.4 CONNECT TO EXISTING 8" WATER MAIN STUB CONNECT TO EXISTING 8" WATER MAIN STUB CAP WATER MAIN WITH TEMPORARY BLOW OFF CAP WATER MAIN WITH TEMPORARY BLOW OFF CAP WATER MAIN WITH TEMPORARY BLOW OFF PLACE END CAP ON SEWER MAIN PLACE END CAP ON SEWER MAIN CONNECT TO EXISTING 8" SEWER MAIN STUB CONNECT TO EXISTING 8" SEWER MAIN STUB CONNECT TO EXISTING 8" SEWER MAIN STUB TEMPORARY STORM POND 1.3 TO BE DEMOLISHED IN SUB-PHASE 1.4 GUNSMOKE AVETURNROW TRAIL DURANGO LN WESTLAKE RDQUICKSILVER RDR O W D Y R D F U T U R E T U R N R O W T R A I L F U T U R E D U R A N G O L N PARC E L 1 COS 3 0 3 5 PHASE 1 SUBDIVISION BOUNDARY SUB-PHASE 1.1 (ONSITE) SUB-PHASE 1.3 SUB-PHASE 1.4 PHASING LEGEND SUB-PHASE 1.2 CAP WATER MAIN WITH TEMPORARY BLOW OFF LEGEND 8W 8W PROPOSED SURFACE POND (SIZE VARIES) TEMPORARY SURFACE POND (SIZE VARIES) PHASE 1.3 WATER 8S 8S PHASE 1.3 SEWER 15SD 15SD PHASE 1.3 STORM PHASE 1.3 UTILITY CULVERTS 15SD 15SD PREVIOUSLY INSTALLED STORM PREVIOUSLY INSTALLED UTILITY CULVERTS 8W 8W PREVIOUSLY INSTALLED WATER S S PREVIOUSLY INSTALLED SEWER PHASE 1.3 BURIED ELECTRIC PHASE 1.3 BURIED GAS BT BT PHASE 1.3 BURIED COMMUNICATIONS PROPOSED UNDERGROUND STORM TREATMENT FUTURE SURFACE POND (SIZE VARIES) UNDERGROUND D D UPSTREAM RUN-ON DRAIN PHASE 1.3 LIGHTING CONDUIT PHASE 1.3 LIGHT POLE FIXTURE HH PHASE 1.3 LIGHTING JUNCTION BOX 013.04