Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
013 - EX-1 - PHASING EXHIBIT
VILLAGEGREEN PLAZA PATIO 247 VILLAGEGREEN PATIO BT BTBTBTBT BT BT BT BT BTBTBTBTBT BT BT BTBTBTBT BT BT BT BT BTBT BT BT BT BT BTBT BT BT BT BT BT BT BTBT BT BT BT BT BT BT BTBTBT BT BT BT BT BT BT BT BTBT BT BTBT BT BT BT BT BT BT BT BT BT BT BT BTBTBT BT BTBT BT BT BT BTBT BT BT BT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBT BT BT BT BT BTBT BT BT BT BTBT BT BTBT BTBT BT BT BT BT BT BTBTBTBTBT BTBTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTBTBT BT BT BT BT BT BT BT BT BTBT BT BT BTBTBTBTBTBTBTBT BT BT BTBTBTBTBT BT BT BT BT BT BT BT BTBTBT BT BT BTBT BT BT BTBT BTBT BT BT BT BTBT BT BT BT BT BTBT BT BT BT BT BT BT BT BT BT BT BT BT BTBT BT BT BTBTBTBT BTBTNG NG NG NG NG N G NG NG NG NG NG N G TV TV S S S TOHPOHPOHPOHPOHPTP TPOHP MW MW MW TP TP TP S SSSSSFTVTV TV TV TV TV EE E E E E P T TT T T T T T TTTT T BF BF BF BF BF BF BF BF BF BF B F BF BFBF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BFB F BF BF BF BF BF BF BF BF BFBFBFBFBFBFBFBFBT BT BT BT BT BT BT BT BT BT BT BTVBTV BT V BT V BT V BT V BT V B T V BT V BT V BT V BT V BT V BT V BT V BT V BT V BT V BTV BTVBTVBTVBTVBTVBTVBTVBTVBTV BTV BTV BTV BTV XXXXX X X X X X XXXXXXXX X X X X X X XXX X X X NG NG NG NG NG N G NG NG NG NG NG N G OHPOHP OHP OHP OHP OHP OHP OH P OHP OHP OHP OHP OHP OHP OHP OHP OHP T T X X X X X X X X X X X X X X X X T T X X X X X X X X X X X X X X X X X X X X X X X X OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P O H P O H P F TBF BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTBTBT BT BT BT BT BT BT BT BT BT BT BT BT B T BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT S XXXXXXXX XXBTBTBTBTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BTWWWWWXXBTBTBT CO F S S S S S SS S S S S S S S S S S S S S SS S S S SSSSSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSS SSSSSSSSSS SS SSS S S S S SS S S SS S S S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 10S 10 S 10S10S10S10SS S S S S S S S S S SS SS SSS SS S S S S S S S S S S S S S S SS S S S S S S S S S S S S S SSSSS S S S S S S S S S S S S S S S 8S 8S 8S8SS S SS8S 8S8S 8S8S8S8S8S8S8S10S10S10S10S10S10S10S10SS S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSSS S S S S S S S SSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S 12S FM FM FM FM FM FM FM FM FM FM FM FM FM S S FM FMFM 8S S S S S S S S S 18S 18S 8W8W 8W8W 8W 8W8W 8W 8W 8W 8W 8W 8W 8W 12W 12W 12W 8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8 W 8 W 8W 8W 12W12W 12W 12W 12W 12W12W 12W 12W 12W 12W 12W 12W 12W 12W 12W 12W 8W8W 8W 8W 8 W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W12W12W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 8W 8W 8W 8W 8W 8 W 8W 8W8W 8W 8W 8W 8W 8W 8W 8W DYH DYH DYH DYH 12W 12W DYH DYH DYH DYH DYH DYH DYH DYH DYHDYH 8W 8W 8W8WB DYH B B B B B B B 8W 8W 8W 8W 8W 8W 8W8W8W8W8W 8W 8W 8W 8 W 8W 8W 8W 12 W 12 W 12W12WB 8W 8W 8W 8W 8W DYH B 8W 8W 8W 8W 8W 8W 8W 8W B DYH8 W 8W 8W 8W 8W 8W B 8W 8W DYH WSWS 8W 8W 8W8W 8W 8W 8W8WN0°36'05"E 2552.36'R=1834.86'L=619.18' Δ=19°20'05" CB=S78°53'01"E CH=616.25' S82°50'39"E 59.79' R=1849.86' L=375.42' Δ=11°37'40" CB=S61°36'08"E CH=374.77' S54°16'17"E 147.56' S53°32'27"E 302.20' S39°33'03"E 62.05' S53°32'27"E 1350.11' S33°51'43"E 120.68' R=523.09' L=160.42' Δ=17°34'16" CB=S9°16'00"E CH=159.79' S0°36'43"W 195.38' S89°23'17"E 50.00' S0°36'43"W 464.88' S89°29'25"W 420.77' S0°36'43"W 189.74' S89°29'32"W 2221.92' 12S D 30 S D 30 S D 24S D 24 S D 24 S D 18 S D 18 S D 18 S D 15SD15 S D 15S D 15 S D18SD18SD18SD 18SD18SD 18SD 15SD 15SD D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D12SD12SD12SD 12SD 12S D 12SD 15SD 15SDD D D15SD15SD15SD 15SD 15SD24SDD D D12SD 15SD15SDD D15SDD D D D D D 15SD15SD 15SDD D D DDDDDDDDDDD D D D D D D D D M HH HH HH HH HH HH HHHH HH HH HH HH HHHH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HHHH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HHHHHHHH HH HH HH HH HH HH HHHHHH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HHHHBLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4 BLOCK 5 BLOCK 6BLOCK 9BLOCK 10 BLOCK 5 LEGEND 8W 8W PROPOSED SURFACE POND (SIZE VARIES) TEMPORARY SURFACE POND (SIZE VARIES) PHASE 1 WATER 8S 8S PHASE 1 SEWER 15SD 15SD PHASE 1 STORM PHASE 1 UTILITY CULVERTS FM 15SD 15SD FUTURE FORCEMAIN FUTURE STORM FUTURE UTILITY CULVERTS 8W 8W FUTURE WATER S S FUTURE SEWER PHASE 1 BURIED ELECTRIC PHASE 1 BURIED GAS PROPOSED UNDERGROUND STORM TREATMENT FUTURE SURFACE POND (SIZE VARIES) UNDERGROUND PROPOSED GRAVEL BT BT PHASE 1 BURIED COMMUNICATIONS FM PHASE 1 FORCE MAIN PHASE 1 LIGHTING CONDUIT PHASE 1 LIGHT POLE FIXTURE HH PHASE 1 LIGHTING JUNCTION BOX GENERAL NOTES: 1.SERVICE LINES TO FUTURE LOTS BEYOND PHASE 1 ARE NOT SHOWN. 2.ROADS SHOWN WITH FUTURE R.O.W. SHALL BE DEDICATED AS EASEMENTS DURING PHASE 1, UNLESS OTHERWISE NOTED. WATER NOTES: 1.WATER MAINS SHALL BE CONSTRUCTED OF DUCTILE IRON AND WRAPPED IN V-BIO ENHANCED POLYETHYLENE PER C.O.B. REQUIREMENTS, UNLESS OTHERWISE NOTED. 2.DOMESTIC WATER SERVICES SHALL BE 1" TYPE "K" COPPER PER C.O.B. STD. DETAILS NO. 02660-6 AND 02660-15, UNLESS NOTED OTHERWISE. SEWER NOTES: 1.SEWER MAINS SHALL BE CONSTRUCTED OF SDR-35 PVC PER C.O.B. STANDARDS. 2.SEWER MANHOLES SHALL BE INSTALLED PER C.O.B. STD. DWG. NO. 02720-3. 3.INSTALL SEWER SERVICE PER C.O.B. STD. DWG. NO. 02720-2. IF DEPTH OF COVER AT STUB END WILL EXCEED 6.5 FEET, FOLLOW C.O.B. STD. DWG. NO. 02720-3. 4.BUILDINGS WITHIN LOTS THAT ARE ELIGIBLE FOR CONCURRENT CONSTRUCTION SHALL HAVE A SEWER SERVICE VIDEO INSPECTION COMPLETED BY THE OWNER OF THE BUILDING TO VERIFY THAT NO DAMAGE OCCURRED DURING CONSTRUCTION ACTIVITIES. THE VIDEO SHALL BE REQUIRED TO BE SUBMITTED TO THE CITY OF BOZEMAN, AND OCCUPANCY SHALL NOT BE GRANTED FOR THE BUILDING UNTIL RECEIVED AND APPROVED BY THE CITY. 150 300751500 SCALE IN FEET FIGURE NUMBER © PROJECT NO.DRAWN BY: DSGN. BY: APPR. BY: DATE: COPYRIGHT MORRISON-MAIERLE,2024 Plotted by lee hageman on Jul/29/2024 engineers surveyors planners scientists MorrisonMaierle 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net N:\6916\003 - Turnrow Master Plan\ACAD\Exhibits\6916.003 - PHASING EXHIBIT.dwg6916.003 EX-1 TURNROW SUBDIVISION BOZEMAN MONTANA PHASING EXHIBIT RSP LGH LGH 04/25/24 PARCE L 1 COS 3 0 3 5 VALL E Y C E N T E R S U B . LOT 1 LOT 1 A LOT 7 LOT 7 A LOT 8 LOT 8 LOT 1 1 LOT 1 1 A LOT 1 1 B PARK MINOR S U B 4 2 6 LOT 5 LOT 4 BOZEMAN C O M M U N I T Y PLAN FUT U R E L A N D U S E : URBAN NE I G H B O R H O O D BOZEMAN C O M M U N I T Y PLAN FUTU R E L A N D U S E : RESIDENT I A L M I X E D U S E BOZEMAN C O M M U N I T Y PLAN FUT U R E L A N D U S E : URBAN NEI G H B O R H O O D BOZEMAN C O M M U N I T Y PLAN FUTU R E L A N D U S E : URBAN NE I G H B O R H O O D BOZEMAN C O M M U N I T Y PLAN FUTU R E L A N D U S E : URBAN NE I G H B O R H O O D TRACT A - 1 COS 1 6 5 A PARCE L 2 COS 3 0 3 5 VALLE Y C E N T E R S U B. PARC E L 1 COS 3 0 3 5 PARCE L 2 COS 3 0 3 5 FUTURE STORMWATER POND BOZEMAN C O M M U N I T Y PLAN FUTU R E L A N D U S E : RESIDENT I A L M I X E D U S E ZONING - R - 5 GUNSMOKE AVEQUIC K SILVER RD TURNROW TRAIL DURANGO LN G U N S M O K E A V E WESTLAKE RDDAVIS LNFU T U R E B O O M E R A N G R D FUTURE TEMERITY LNFUTURE FERGUSON AVE FU T U R E R O W D Y R D FU T U R E T U R N R O W T R A I L FU T U R E D U R A N G O L NFUTURE ROWDY RDFUTURE FU T U R E M U L E Y W A YFUTURE FERGUSON AVE DURA N G O FU T U R E W E S T L A K E R D EA S T V A L L E Y C E N T E R R O A D - HI G H W A Y S T P S 2 3 5 DAVIS LNQUICKSILVER RD FUTURE CA NTLE WAY FUTURE STORMWATER POND WESTLAKE RD EXISTING 12" WATER MAIN EXISTING 27" SANITARYSEWER MAIN EXISTING 12"WATER MAIN EXISTING 27" SANITARY SEWER MAIN EXISTING PROPERTY BOUNDARY EXISTING PROPERTY BOUNDARY EXISTINGPROPERTY BOUNDARY EXISTING PROPERTY BOUNDARY EXISTING HYDRANT PROPOSED COBPRV EXISTING OVERHEAD POWER TO BE RELOCATED AND/OR BURIED EXISTING OVERHEAD POWERTO BE RELOCATED AND/OR BURIED PROPOSED 12" RCPSTORM CULVERTTEMPORARY STORMWATERPOND NEW 8" LIVE TAP TO EXISTING MAIN PROPOSED PUBLIC UTILITY EASEMENT PROPOSED MANHOLE WITHLINER OR INTERIOR COATINGTO RESIST H2S FROM FUTURE LIFT STATION DISCHARGE EXTEND EXIST. 15" STUB WEST TOPROPOSED MANHOLE PROPOSED SECONDARY PRV FUTURE C.O.B LIFT STATION EXISTING UNNAMED TRIBUTARYTO BUSTER GULCH ZONE 1: 30' WATERCOURSE SETBACK ZONE 2:50' WATERCOURSE SETBACK REMOVE EXISTING 36" CMP REPLACE EXISTING30" CMP EXISTING 24" CMP EXISTINGCATTAIL CREEK PROPOSED 60" RCP CULVERT(REPLACE EXISTING 60" CMP) (2) EXISTING 60" CMP EXISTING 24" CMP EXISTING 24" RCP EXISTING 48" RCP EXISTING 24" CMP EXISTING IRRIGATION DITCH ZONE 1:30' WATERCOURSE SETBACK ZONE 2: 50' WATERCOURSESETBACK RAISED MEDIAN FUTURE POND OVERFLOW PIPE FUTURE POND OVERFLOW OUTFALL EXISTING DITCH DITCH CHANNEL BOUNDARIES TO NORTH UNKNOWN DUE TO LOCATION BEING ON THE PRIVATEPROPERTY BOUNDARY (NOT ABLE TO SURVEY) (ZONE 1 AND ZONE 2 SETBACKS ARECONSERVATIVELY LOCATED 30' AND 50' FROM LOTLINE TO NORTH PROPERTY BOUNDARY) DAVIS LANE PROPOSED 12' ASPHALTSHARED USE PATH PROPOSED 60" RCPSTORM CULVERT PROPOSED 10' CONCRETE SHAREDUSE PATH PROPOSED 30" RCP STORM CULVERT FUTURE COBFORCE MAIN (TYP.) APPROXIMATE LOCATION OF EXISTING DITCH TEMPORARYSTORMWATERPOND TEMPORARY STORMWATERPOND TEMPORARY STORMWATERPOND PROPOSED SURFACESTORAGE P-1 PROPOSED UNDERGROUND STORAGE U-3 PROPOSED UNDERGROUND STORAGE U-1 PHASE 1 BOUNDARY PHASE 1 FUTURE PHASES FUTURE ACCESS AND UTILITY EASEMENTS PROPOSED 60" RCPSTORM CULVERT PROPOSEDTRAFFIC SIGNALPOLE (TYP.) FUTURE CROSSINGT.B.D. PHASE 1 SUBDIVISION BOUNDARY SUB-PHASE 1.1 (ONSITE) SUB-PHASE 1.3 SUB-PHASE 1.4 PHASING LEGEND SUB-PHASE 1.1 (OFFSITE) SUB-PHASE 1.2 FUTURE OFFSITE (PHASE TBD) FUTURE ONSITE SEWER FACILITIES 2 1 3 KEY NOTES FUTURE ONSITE GRAVITY SEWER MAIN (BY OWNER) FUTURE SEWER FORCE MAIN (BY CITY OF BOZEMAN) EAST VALLEY CENTER TAPERED TO THREE LANES PATHWAY CONNECTION TO EXISTING CURB WALK SHARED-USE PATH EXTENSION TO WESTLAKE ROAD 1 1 1 2 2 2 2 3 3 3 4 5 5 5 5 PHASE 1.1 OFFSITE IMPROVEMENTS GENERALLY INCLUDE THE FOLLOWING: -SYMMETRICAL EXPANSION OF VALLEY CENTER ROAD TO 3-LANE SECTION FROM QUICKSILVER ROAD TO DAVIS LANE WITH WITH TAPERS ON EACH END. -INSTALLATION OF A TRAFFIC SIGNAL AT THE DAVIS LANE AND VALLEY CENTER ROAD INTERSECTION. -INSTALLATION OF A SHARED USE PATH PER KEYNOTE . FUTURE OFFSITE IMPROVEMENTS IN LATER PHASES INCLUDE THE FOLLOWING: -THE EXPANSION OF VALLEY CENTER ROAD TO A 3-LANE SECTION FROM QUICKSILVER ROAD TO VALLEY SPUR ROAD. -CONNECTING SITE SHARED USE PATH FROM THE CURB WALK AT VALLEY SPUR ROAD TO THE SHARED USE PATH ONSITE. FUTURE ONSITE SEWER IMPROVEMENTS INCLUDE THE FOLLOWING: -THE INSTALLATION OF A GRAVITY MAIN ALONG VALLEY CENTER ROAD PARALLEL TO THE CITY OF BOZEMAN FORCE MAIN. -THE COMPLETION OF THE SHARED USE PATH FROM VALLEY SPUR ROAD TO QUICKSILVER ROAD. THIS PATH FUNCTIONS BOTH AS A SHARED USE PATH AND MAINTENANCE VEHICLE ACCESS ROUTE TO THE PROPOSED GRAVITY SEWER MAIN. 1 2 3 1 2 3 4 EXISTING 24"RCP CULVERT PROPOSED C.O.B. FORCE MAINTHROUGH BLOCK 1 013.00