2 August 2024
City of Bozeman
Development Review Committee
Re: Turnrow Subdivision
Re: Concurrent Construction Request
Please accept this letter as a request for concurrent construction, as outlined in section
38.270.030.B.1.b.(2), of Subdivision infrastructure and building improvements on all lots
within Phase 1.1, Block 1 Turnrow Subdivision (“Subdivision”). Block 1 contains only
commercial lots, with all other blocks containing residential lots. As such, Phase 1.1, Block
1 is the only portion of the Subdivision that meets the criteria for concurrent construction,
and as such, is the only phase for which concurrent construction is being proposed. Items
described in the section below on Phase 1.1 shall be installed, or financially guaranteed,
prior to the occupancy of any structure within Phase 1.1, Block 1. The Subdivision and
concurrent construction site projects will be under control of a single developer, with all work
under the supervision of a single general contractor. No third-party builders may complete
work until infrastructure is completed. The developer will provide insurance, risk
acknowledgement, and indemnification in a form acceptable to the City prior to Final Plat
and/or Building Permit issuance.
Please see the specific list below, as well as Appendix Q.2 for more information on these
improvements. Each lot within Block 1 will be subject to a further site plan review and will be
evaluated under that application for conformance with the UDC and the approved MSP,
prior to any physical construction taking place.
Phase 1.1 Required Concurrent Construction Infrastructure & Snow Removal
Infrastructure which shall be completed prior to building permit issuance and would permit
concurrent construction on Phase 1.1, Block 1 include the following items. Please note that
the items related to water main and fire hydrant installations shall all be tested and activated
prior to building permit issuance. If interior utilities are activated by the City of Bozeman for
concurrent construction purposes, this shall not mean they have been deemed formally
accepted by the City of Bozeman. The owner is responsible for any damage that may occur
to active utilities during concurrent construction activities and prior to final acceptance by
the City.
• East Valley Center Road
• East Valley Center Road improvements are being permitted with the Montana
Department of Transportation (MDT). These improvements include:
• Symmetrical expansion of the existing road to a 3-lane section from
Quicksilver Road to Davis Lane with tapers on each end to
accommodate a southbound turning lane onto Davis Lane and
Quicksilver Road
• Installation and maintenance of temporary striping and signage to
accommodate the new configuration, at minimum
• Final striping shall be completed at the time of signal
installation
• Installation of utility culverts for dry utilities and electrical conduit
required for the traffic signal
• MDT Access Permit for Quicksilver Road
• Additional approvals being coordinated:
• Traffic Signal
• Culverts
• Davis Lane
• Road Reconstruction
• Remove the existing Davis Lane section through the entire Turnrow
Subdivision east frontage (at minimum) and further south as required
to blend design grades.
• Construct Davis Lane to a 3-lane arterial section from East Valley
Center Road along the eastern boundary of the Subdivision, to
accommodate a northbound turning lane into Turnrow Trail
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting
• Temporary signage and striping, at minimum, if final striping
cannot be performed
• A curbed taper section shall be designed to provide positive
protection for vehicles and direct traffic to the existing 2-lane
county section. The design meets design guidance per Section
9.2.2.4 from Chapter 9 of the MDT Road Design Manual.
• A tapering section which matches the existing country road section
shall be installed south of the property to channelize traffic to the
existing 2-lane section at the southern boundary of the project near
Westlake Road.
• Final signage and striping shall be installed prior to issuance of any
building permits for buildings within Phase 1.1.
• Utilities
• Storm Drain
• Install storm drain main within Davis Lane for capture and
treatment of stormwater
• Sewer
• Remove and replace the existing manhole and existing 15”
stub to Block 1.
• The sewer main shall convey the estimated 2,265 gpm
force main discharge in addition to the upstream gravity
sewer flows from the properties to the south, as outlined
in the figure from the VCLS PER (drafted by HDR).
• Install 18” sewer main into Block 1 to the proposed
outfall manhole where gravity and force main discharge
will be combined.
• Water
• Install two live taps and extensions to the property
• Block 1 secondary feed loop (8”)
• Turnrow Trail water main (12”)
• Culverts
• Upsize the existing culvert for Cattail Creek to 60” embedded
RCP
• Replace existing 30” culvert beneath Davis Lane for
conveyance of water from the existing irrigation ditch
• Extend the existing culvert beneath Valley Center to a point
south of the proposed 10’ shared use path
• Access Construction to Existing Roads
• The following accesses shall be constructed in their final configuration and
surfacing to comply with necessary stormwater permitting and ensure safety,
traffic control, and fire and emergency access to the site.
• This shall be completed beyond the curb return and a minimum of 25’
(or as required by the City of Bozeman) beyond any depressed
stormwater inlets required for capture, conveyance, and treatment of
stormwater originating from these accesses
• Quicksilver Road
• Installation of access to Valley Center from Quicksilver Road
• Turnrow Trail
• Installation of access point to Davis Lane from Turnrow Trail
• Turnrow Trail Improvements
• The installation extents shall be from Davis Lane to the western boundary of
Phase 1
• Road Improvements
• Includes installation of road structure aggregates
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Hydrants
• Installation of all hydrants along the road within the boundary
shown for Phase 1.1
• Gunsmoke Avenue Improvements
• The installation extents shall be from Turnrow Trail north and west to the
boundaries of Phase 1
• Road Improvements
• Includes installation of road structure aggregates
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Installation of run-on stormwater drain
• Hydrants
• Installation of all hydrants along the road within the boundary
shown for Phase 1.1
• Quicksilver Road Improvements
• The installation extents shall be from Turnrow Trail to the intersection with
East Valley Center Road
• Road Improvements
• Includes installation of road structure aggregates
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Includes force main extension beneath Gunsmoke
Avenue
• Hydrants
• Installation of all hydrants along the road within the boundary
shown for Phase 1.1
• Additional Utility Improvements
• Block 1 Utilities
• The utilities below shall have adequate cover installed and be provided
with accessible route for maintenance, but shall not have final
surfacing (curb, gutter, asphalt, etc.)
• Secondary Water Supply Loop
• Constructing a secondary supply water main through the
proposed easement within Block 1
• Block 1 Hydrant
• Install the planned hydrant within Block 1
• Pressure Reducing Valves
• The following pressure reducing valves will be installed with Phase 1.1
• Primary PRV (near Turnrow Trail & Davis Lane intersection)
• Secondary PRV (near Quicksilver Road and East Valley Center
Road intersection)
• Stormwater Treatment Structures
• Stormtech Structures
• Treatment system U-1 shall be constructed which serves
Quicksilver Road between Gunsmoke Avenue and East Valley
Center Lane
• Treatment system U-2 shall be constructed which serves Davis
Lane and a small portion of Block 2
• Surface Pond P-1
• Pond P-1 will be constructed as it provides stormwater
treatment for internal roads for Phases 1.1-1.4
• Snow Removal
• Snow removal shall be performed during the winter to provide access
for fire and emergency service vehicles.
• Two points of access to the subdivision shall be cleared of
snow and any main roads where fire hydrants are provided
nearest to the lots undergoing concurrent construction.
• This shall include on the eastern portion of Turnrow Trail
(between Quicksilver Rd and Davis Lane), Gunsmoke
Avenue (between Turnrow Trail and Quicksilver), and
the northern portion of Quicksilver Road (between
Gunsmoke Avenue and East Valley Center Road).
• Sewer Service Inspections
• Buildings within lots that are eligible for concurrent construction shall
have a sewer service video inspection completed by the owner of the
building to verify that no damage occurred during construction
activities.
• The video shall be required to be submitted to the City of
Bozeman, and occupancy shall not be granted for the building
until received and approved by the City.
Phase 1.1 Subdivision Infrastructure Not Required for Concurrent Construction
The following infrastructure items, if not already completed, will be financially guaranteed
through an improvements agreement when applying for a building permit for commercial
lots within Block 1.
• Block 1 Sewer Infrastructure
• The utilities below shall have adequate cover installed and be provided with
accessible route for maintenance, but shall not have final surfacing (curb,
gutter, asphalt, etc.)
• Gravity Sewer Outfall
• Extend the existing 15” sanitary sewer gravity main through
Block 1 for conveyance of all sanitary sewer for Phase 1
• Install a manhole on this outfall line that will receive discharge
from the future Valley Center Lift Station
• Sewer Force Main
• The sewer force main shown through Block 1 shall be
constructed for future connection to the City of Bozeman’s
force main from the Valley Center Lift Station
• The force main shall be capped west of the Quicksilver Road and East
Valley Center Road intersection as shown
• Alleys 3.1 & 3.2
• Road Improvements
• Includes installation of road structure aggregates, concrete valley
gutters (if applicable), and asphalt per the proposed road section
• Utilities
• Installation of water, sewer, & stormwater facilities within the rights-of-
way
• Alley 6.1 Improvements
• Road Improvements
• Includes installation of road structure aggregates and asphalt
• Park Improvements
• All park improvements within Park 1
• Shared Use Path Construction
• East Valley Center (Onsite)
• Installation of shared use path on East Valley Center Road from
Quicksilver Road to Davis Lane
• Includes installation of 60” RCP culvert for Cattail Creek
• East Valley Center (Offsite)
• Installation of shared use path east of Davis Lane to Westlake Road
• Davis Lane
• Installation of a 10’ shared use path along the western side of Davis
Lane
• Final Surfacing of Roadways
• Includes curb, gutter, and asphalt installation within the following roadways:
• Turnrow Trail
• Gunsmoke Avenue
• Quicksilver Road
• Sidewalks
• Installation of all common open space and park frontage sidewalks
• Signing and Striping
• The final signing and striping may be deferred provided that temporary
striping and signage is provided and acceptable to the agencies having
jurisdiction
• East Valley Center Road
• Final striping for East Valley Center shall be concurrent with the
traffic signal installation.
• Interior Roads
• Turnrow Trail
• Gunsmoke Avenue
• Quicksilver Road
• Street Lighting
• Street lighting proposed for Phase 1.1 shall not be required for concurrent
construction
• Traffic Signal
• Final installation and activation of the proposed traffic signal at the Davis
Lane and Valley Center Road intersection shall be performed when warrants
are met for the Traffic Signal.
• Temporary signage and control shall be in place and maintained.
• Access Permit
• MDT Access Permit for Maintenace Access Permit to future Valley Center Lift
Station
Phase 1.2
No infrastructure within Phase 1.2 is proposed to be deferred, or financially
guaranteed for concurrent construction activities. These items shall only be
required for final plat of this phase.
• Gunsmoke Avenue Improvements
• The installation extents shall be from Turnrow Trail south to the boundary of
Phase 1.2
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Installation of run-on stormwater drain
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.2
• Alleys 2.1, 2.2, and 2.3
• Road Improvements
• Includes installation of road structure aggregates, concrete valley
gutters (if applicable), and asphalt per the proposed road section
• Utilities
• Installation of water and facilities within the rights-of-way
• Installation of all common open space sidewalks, parking spaces, and other
common improvements
• Durango Lane Improvements
• The installation extents shall be from Gunsmoke Avenue to the western
boundary of Phase 1.2
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.2
• Alley 4.2
• Road Improvements
• Includes installation of road structure aggregates, concrete valley
gutters (if applicable), and asphalt per the proposed road section
• Installation of all common open space sidewalks, parking spaces, and other
common improvements.
Phase 1.3
No infrastructure proposed within Phase 1.3 is proposed to be deferred, or
financially guaranteed for concurrent construction activities. These items shall
only be required for final plat of this phase.
• Durango Lane Improvements
• The installation extents shall be from the Phase 1.2 boundary to the western
boundary of Phase 1.3
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Installation of temporary stormwater pond.
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.3
• Alleys 4.1, 4.3, and 4.4
• Road Improvements
• Includes installation of road structure aggregates, concrete valley
gutters (if applicable), and asphalt per the proposed road section
• Utilities
• Installation of water and facilities within the rights-of-way
• Installation of water main and services through common open space
lot.
• Installation of all common open space sidewalks, parking spaces, and other
common improvements
Phase 1.4
No infrastructure proposed within Phase 1.4 is proposed to be deferred, or
financially guaranteed for concurrent construction activities. These items shall
only be required for final plat of this phase.
• Durango Lane Improvements
• The installation extents shall be from the Phase 1.3 boundary to the western
boundary of Phase 1.4
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Installation of temporary stormwater pond
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.4
• Alleys 5.1, 5.2, 5.3, 5.4, 5.5 and 5.6
• Road Improvements
• Includes installation of road structure aggregates, concrete valley
gutters (if applicable), and asphalt per the proposed road section
• Utilities
• Installation of water and facilities within the rights-of-way
• Installation of all common open space sidewalks, parking spaces, and other
common improvements
• Quicksilver Road Improvements
• The installation extents shall be from the southern property boundary to
Turnrow Trail
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and temporary signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.4
• Gunsmoke Avenue Improvements
• The installation extents shall be from the southern property boundary to
Durango Lane
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Installation of run-on stormwater drain
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.4
• Westlake Road Improvements
• The installation extents shall be from Quicksilver Road to Gunsmoke Avenue.
• Road Improvements
• Includes installation of road structure aggregates, curb, gutter,
asphalt, lighting, and signage and striping
• Utilities
• Installation of water, sewer, & stormwater facilities within the
right-of-way
• Hydrants
• Installation of all hydrants along the road within the
boundary shown for Phase 1.4
All infrastructure design reports have also been included as Appendices (Appendix N-P).
Please let us know if there are any additional conditions required to enable concurrent
Subdivision infrastructure and building construction.
Thank you,