Loading...
HomeMy WebLinkAbout006 - C-006 - CONSTRUCTION ROUTE MAPLEGEND CONSTRUCTION TRAFFIC - ENTERING CONSTRUCTION TRAFFIC - EXITING OPTION 1 OPTION 2 CONSTRUCTION TRAFFIC - ENTERING CONSTRUCTION TRAFFIC - EXITING OPTION 3 CONSTRUCTION TRAFFIC - ENTERING CONSTRUCTION TRAFFIC - EXITING N G NG NG EA S T V A L L E Y C E N T E R R O A D - H I G H W A Y S T P S 2 3 5 WESTLAKE RDDAVIS LNFUTURE WESTLAKE RD WESTLAKE RD IN T E R S T A T E 9 0 H W Y DURANGO LN WHISPER LNHIDDEN VALLEY RDSTUBBS LNRLANE DR FR O N T A G E R D RO Y A L W O L F W A Y NELSON RDINT E R S T A T E 9 0 H W Y WELLNESS WAY WARBLER WAY2024COPYRIGHT © MORRISON-MAIERLE, INC., SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\6916\003 - TURNROW MASTER PLAN\ACAD\SHEETS\2-MASTER-SITE-PLAN\6916.003 - CONSTRUCTION ROUTE MAP.DWG PLOTTED BY:MAYA SIMMONS ON Jul/29/2024 REVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle VERIFY SCALE AND COLOR! THIS SHEET MAY BE REDUCED AND IS INTENDED TO BE IN COLOR. THE BAR BELOW WILL MEASURE ONE INCH AT ORIGINAL DESIGN SCALE AND RED, GREEN, AND BLUE WILL BE VISIBLE IFREPRODUCED CORRECTLY. MODIFY SCALE ACCORDINGLY! TURNROW SUBDIVISION MASTER SITE PLANBOZEMAN MONTANA CONSTRUCTION ROUTE MAP & CONSTRUCTION DEBRIS CONTAINER 6916.003 06 C-006 RSP LRH MEE 07/24/2024 1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; THE CITY OF BOZEMAN DESIGN STANDARDS & SPECIFICATIONS; AND THE PROJECT SPECIFICATIONS. 2.CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL REGULATIONS (OSHA) SAFETY STANDARDS. IF REQUESTED BY THE INSPECTOR, THE CONTRACTOR SHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION. 3.THE CONTRACTOR'S OPERATIONS SHALL BE CONFINED WITHIN THE PROJECT LIMITS. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE PROJECT SITE WHERE APPROVED BY THE OWNER. IT SHALL BE UNDERSTOOD THAT THE RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF EQUIPMENT AND MATERIALS ON OR NEAR THE SITE WILL BE ENTIRELY THAT OF THE CONTRACTOR AND THAT NO CLAIM SHALL BE MADE AGAINST THE OWNER BY REASON OF ANY ACT OF AN EMPLOYEE OR TRESPASSER. 4.CONTRACTOR SHALL STRIVE TO MINIMIZE LARGE VEHICLE TRAFFIC THROUGH EXISTING RESIDENTIAL NEIGHBORHOODS TO THE EXTENT POSSIBLE. LARGE TRUCK TRAFFIC SHALL USE THE ROUTES SHOWN IN THE GRAPHIC OR ADDITIONAL COUNTY ROADS THAT AVOID HIGH-DENSITY RESIDENTIAL NEIGHBORHOODS. THIS RESTRICTION SHALL NOT APPLY TO LIGHT VEHICLE TRAFFIC INCLUDING TRADE VEHICLE TRUCKS AND PICKUP TRUCKS LESS THAN OR EQUAL TO 1 TON HAUL CAPACITY. 5.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE CITY, COUNTY, AND/OR STATE INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN ADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AND SUBJECT TO THE AVAILABILITY OF AN INSPECTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR WILL BE BILLED FOR SAID INSPECTION SERVICES AS PROVIDED IN THE MOST RECENTLY ADOPTED FEES FOR SUCH SERVICES. 6.THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN A MANNER TO MINIMIZE INCONVENIENCE TO THE ADJACENT BUSINESSES. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS, ALL COSTS FOR PROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE SOLELY BY THE CONTRACTOR. 8.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 9.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS-OF-WAY AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY. 10.CONSTRUCTION WORK ZONE TRAFFIC SIGNS SHALL BE FURNISHED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THE REGULATORY AGENCIES HAVING JURISDICTION. A TRAFFIC CONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY BE REQUIRED BY THE CITY OR STATE. "CONSTRUCTION AHEAD" WARNING SIGNS ARE TO TO BE INSTALLED ALONG ADJACENT ROADS OR DRIVEWAYS. FLASHERS WITH CAUTION TAPE ARE TO BE INSTALLED WHERE ANY CONSTRUCTION ACTIVITY CROSSES A SIDEWALK OR PEDESTRIAN PATH IN ACCORDANCE WITH THE SPECIFICATIONS AND ANY OR ALL LOCAL REGULATIONS. 11.NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC STREETS /ROADS, RIGHTS-OF-WAY, OR ANY DRIVEWAY IS ALLOWED. 12.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT THERE IS A CONSTRUCTION PERMIT APPROVED BY THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) OR LOCAL GOVERNING AGENCY AS APPROPRIATE FOR THE CONTROL OF STORM WATER RUNOFF. IF THERE IS NOT AN APPROVED PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY APPROVALS FROM MDEQ OR THE LOCAL GOVERNING AGENCY. 13.CONTRACTOR IS RESPONSIBLE FOR PROJECT DUST CONTROL. GENERAL NOTES: PROJECT LOCATION KEY NOTES CONSTRUCTION ROUTE SHALL BE PREFERRED ROUTE, CONSTRUCTION ROUTE SHALL BE USED AS AN ALTERNATE. CONSTRUCTION ROUTE SHALL BE USED AS A SECONDARY ALTERNATE. 2 1 1 2 1.CONSTRUCTION DEBRIS WILL BE STORED AND COLLECTED IN A DEBRIS BOX SIMILAR TO THE ONE SHOWN BELOW. THE LOCATION OF SAID DEBRIS BOX DURING CONSTRUCTION IS SHOWN ON C200 EROSION AND SEDIMENT CONTROL PLAN. THE TYPE OF MATERIALS STORED AND COLLECTED WILL BE NORMAL CONSTRUCTION MATERIALS SUCH AS WOOD, METAL, DRYWALL, STONE AND BRICK. 2.RENTAL SIZES: 10 CUBIC YARDS - 12' X 8' X 3' | 4 TON WEIGHT LIMIT TEMPORARY DEBRIS BOX: 500 1,0002505000 SCALE IN FEET 07/26/2024 3 3 1 - CONSTRUCTION ROUTE MAP 2 - CONSTRUCTION DEBRIS CONTAINER 006