Loading...
HomeMy WebLinkAbout005 - C-005 - CONSTRUCTION MANAGEMENT & EROSION PLANTV TV S S S TOHPOHPOHPOHPOHPTP TPOHP MW MW MW TP TP TP S SSSSSFTVTV TV TV TV TV E E E E E E P T TT T T T T T TTTT T BF BF BF BF BF BF BF BF BF BF B F B F BFBF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF B F BF BF BF BF BF BF BF BF BF BF BFBFBFBFBFBFBFBFBT BT BT BT BT BT BT BT BT BT BT BTVBTV BTV BTV BT V BT V BT V BT V BT V BT V BT V BT V BT V BT V BT V BT V BT V BT V BTVBTVBTVBTVBTVBTVBTVBTVBTVBTV BTV BTV BTV BTV XXXXX X X X X X XXXXXXXX X X X X X X XXX X X X NG N G N G NG NG NG NG N G NG N G NG NG OHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP TX X X X X X X X X T T X X X X X X X X X X X X X X X X X X X X X X X XO H P OH P OH P OH P OH P OH P OH P OH P OH P OH P O H P O H P OH P OH P TBF BT BT BT BT BT BT BT BT BT BTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT S XXXXXXXXXXBTBTBTBTBTBTBTBT BT BT BT BT BT BT BTWWWWWXXBTBTBT CO F 30' 30' 50' 30' 50'30'VALLEY C E N T E R S U B D I VI S I O N BOZEM A N , M T 5 9 7 1 8 ERIC M & C H A R L E S F M C G U I R E 14 STUB B S L N BOZEM A N , M T 5 9 7 1 8 7 1 2 6 PARK DONALD D . V A NI M A N CECILIA R . V A N I M A N 5020 WE S T L A K E R D BOZEM A N, M T 5 9 7 1 8 9 7 4 3 TERRY F S C H A P L O W 5293 DA VI S L N BOZEM A N, M T 5 9 7 1 8 - 9 7 1 2 C.O.S. 3 0 3 5 TERRY F S C H A P L O W 5293 DAV I S L N BOZEMA N , M T 5 9 7 1 8 - 9 7 1 2 C.O.S. 30 3 5 TERRY F S C H A P L O W 5293 DA V I S L N BOZEMA N, M T 5 9 7 1 8 - 9 7 1 2 C.O.S. 3 0 3 5 BOZEM A N D E V E L O P M E N T L L C. , 899 W F O O T HI L L B L V D S T E G MONRO VI A , C A 9 1 0 1 6 1 9 7 3 LODY E & J A C Q U E L I N E J R E Y G E R S 920 ARB O R S T COSTA M E S A , C A 9 2 6 2 7 4 1 1 2 ANITA A N D E R S O N & D A V I D NATHA N H U R L B E R T 60 STUB B S L N BOZEM A N , M T 5 9 7 1 8 7 1 2 6 DYLAN H I L L B E R R Y 118 STU B B S L N BOZEM A N , M T 5 9 7 1 8 7 1 2 7 CARME N M M A T Z I C K 160 STU B B S L N BOZEMA N , M T 5 9 7 1 8 7 1 2 7 MICHAEL D . & C A S E Y E . A N D R E W S 190 STU B B S L N BOZEM A N , M T 5 9 7 1 8 7 1 2 7 MICHAEL & R E B E C C A R O S E 218 ST U B B S L N BOZEMA N , M T 5 9 7 1 8 7 1 2 9 PETER E & T A S H A D G A R CI A 270 STU B B S L N BOZEM A N, M T 5 9 7 1 8 7 1 2 9 KEN G & M A R I E E B E N N E R 450 STU B B S L N BOZEMA N , M T 5 9 7 1 8 7 1 3 2 NATHA N S N A P R S T E K 478 STU B B S L N BOZEM A N , M T 5 9 7 1 8 7 1 3 2 BURT H A M M E R 500 ST U B B S L N BOZEMA N , M T 5 9 7 1 8 - 9 8 4 5 NG N G N G NG NG NG NG N G NG N G NG NG VILLAGEGREEN PLAZA PATIO 247 VILLAGEGREEN PATIO S S S S S SS S S S S S S S S S S S S S SS S S S SSSSSSSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S 15S15S15S15S15S15S15S 15S 15S15S15S15S15S15S 15S15SS S S S SS S S SS S S S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 10 S 1 0 S 10S10S10S10S10SS S S S S S S S S S SSS SSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S 8S 8S 8S8SS S SS8S 8S8S 8S 8S8S8S 8S8S8S 8S 10S10S10S10S 10S10S10S 10S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSSS S S S S S S S SSSSSSS S S S S S S S S S 12S 18S 18SSS FM FM FM FM FM FM FM FM FM FM FM FM FM FMFM 8 S S S S S S S S S 8W8W8W 8W 8W 8W 8W 8W 8W 8W8W 8W 8W 8W 8W 12W 12W 12W 8W8W8W8W8 W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8 W 8W 8W 8W 8W 8W 12W 12W 12W 12W 12W12W 12W 12W 12W 12W 12W12W 12W 12W 12W 12W12W 8W8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W12W12W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 8W 8W 8W 8W B B 8W8W 8W 8W DYH DYH DYH DYHDYH DYH DYH DYH DYH 8W DYH DYH 8W 8W 8W 8W DYH DYHDYH DYH DYH DYH DYH DYH 12W 12W DYHDYH DYH DYH DYH DYH DYH DYH DYH DYH DYH 8W 8W 8W8WB DYH B B B B B B B B B B B B B 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W 8 W 8 W 8 W 8W 8W 8W B 12 W 12 W 1 2W 12WB 8W 8W 8W 8W 8 W DYH B 8W 8W 8W 8W 8W 8W 8W 8W DYH B DYH DYH 8W 8W 8W 8W 8W 8W B DYHDYH DYH DYH DYH 8W 8W DYH8W8W8W WSWS 8W 8W 8W8W 8W 8WDYH VERT 22.5VERT 22.5 VERT 22.5 VERT 22.5VERT 11.25 VERT 11.25 8W8W8W30 S D 30 S D 24 S D 24S D 24 S D 18 S D 18 S D 18 S D 15SD15SD15 S D 15 S D 15 S D18SD18SD18SD 18SD 18SD 18SD 15SD15SD D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D12SD12SD12SD12SD12SD12SD 15SD 15SDD D 15SD15SD15SD 15SD 24SDD 15SD15SD15SD15SDD D D D D D D12SD24SD24SD24SDD D D D D D D D DDDDDDDDDDD D D D D D D D DDDDDD D D D D D GUNSMOKE AVEQUICKSILVER RD TURNROW TRAIL DURANGO LN G U N S M O K E A V E EA S T V A L L E Y C E N T E R R O A D - H I G H W A Y S T P S 2 3 5 WESTLAKE RDDAVIS LNXXXXSFSF SF SF SFSFN0°36'05"E 2552.36'R=1834.86' L=619.18' Δ=19°20'05" CB=S78°53'01"ECH=616.25'S82°50'39"E 59.79' R=1849.86' L=375.42' Δ=11°37'40" CB=S61°36'08"E CH=374.77' S54°16'17"E 147.56' S53°32'27"E 302.20' S39°33'03"E 62.05' S53°32'27"E 1350.11' S33°51'43"E 120.68' R=523.09' L=160.42' Δ=17°34'16" CB=S9°16'00"E CH=159.79' S0°36'43"W 195.38' S89°23'17"E 50.00' S0°36'43"W 464.88' S89°29'25"W 420.77' S0°36'43"W 189.74' S89°29'32"W 2221.92' SF SFSF SF SFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SFSFSFSF SF SF SF SF TEMPORARY SANITARY FACILITY (ALL PHASES) TEMPORARY JOB SITE TRAILER (ALL PHASES) TEMPORARY JOB SITE DUMPSTER (ALL PHASES) MATERIALS STORAGE AND STAGING LOCATION (ALL PHASES) OPTION #1 TEMPORARYSPOILS LOCATION 1 2 EXISTING PROPERTY BOUNDARY (TYP.) 1 3 3 3 5 5 5 4 4 4 4 4 CONSTRUCTION LIMITS TO INCLUDE VALLEY CENTERWIDENING & TAPERS. 3 3 3 5 4 FU T U R E B O O M E R A N G R D FUTURE TE MERITY LNFUTURE FERGUSON AVE FU T U R E R O W D Y R D FU T U R E D U R A N G O L NFUTURE ROWDY RDFUTURE CANTLE WAY FUTURE FUTURE BOOMERANG RD FU T U R E M U L E Y W A Y FUTURE WESTLAKE RD DURAN G O FU T U R E T U R N R O W T R A I L FUTURE FER GUSON AVE WESTLAKE RD 4 4 4 4 4 4 4 2024COPYRIGHT © MORRISON-MAIERLE, SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\6916\003 - TURNROW MASTER PLAN\ACAD\SHEETS\2-MASTER-SITE-PLAN\6916.003 - EROSION & SEDIMENT CONTROL PLAN.DWGREVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle VERIFY SCALE AND COLOR! THIS SHEET MAY BE REDUCED AND IS INTENDED TO BE IN COLOR. THE BAR BELOW WILL MEASURE ONE INCH AT ORIGINAL DESIGN SCALE AND RED, GREEN, AND BLUE WILL BE VISIBLE IFREPRODUCED CORRECTLY. MODIFY SCALE ACCORDINGLY! PLOTTED BY:MAYA SIMMONS ON Jul/29/2024 TURNROW SUBDIVISION MASTER SITE PLANBOZEMAN MONTANA CONSTRUCTION MANAGEMENT & EROSION SEDIMENT CONTROL PLAN 6916.003 05 C-005 RSP LRH MEE 07/24/2024 MASTER SITE PLAN JULY 2024 150 300751500 SCALE IN FEET Know what's below. before you dig.Call R NOTES BY SYMBOL: INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 1 ON SHEET C-1206 OR AS RECOMMENDED BY MANUFACTURER INSTALL CONCRETE WASHOUT FACILITY PER DETAIL 2 ON SHEET C-1206. INSTALL SILT FENCE PER DETAIL 3 ON SHEET C-1206. INSTALL TYPE "D" INLET PROTECTION PER DETAIL 4 ON SHEET C-1206. SEDIMENT CONTROL DITCH PER DETAIL 4 ON SHEET C-1205. EROSION & SEDIMENT CONTROL NOTES: 1.EROSION AND SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). DURING THE CONSTRUCTION OF UNDERGROUND STORMWATER FACILITIES, ALL CONTRIBUTING INLETS SHALL BE PROTECTED WITH STRAW WATTLES OR FABRIC INLET-BAGS TO MITIGATE SEDIMENT ACCUMULATION. ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. 9.GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR ALL ELECTRICAL PERMITS/FEES. 10.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT THERE IS A CONSTRUCTION PERMIT APPROVED BY THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) OR LOCAL GOVERNING AGENCY AS APPROPRIATE FOR THE CONTROL OF STORM WATER RUNOFF. IF THERE IS NOT AN APPROVED PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY APPROVALS FROM MDEQ OR THE LOCAL GOVERNING AGENCY. 1 2 3 4 LEGEND PROPOSED 4-INCH CONCRETE SIDEWALK CONSTRUCTION LIMITS (PHASE 1) SILT FENCE (REF DETAIL 3/C1205) PROPOSED ASPHALT PAVEMENT SURFACE SF SF SEDIMENT CONTROL DITCH FUTURE 4-INCH CONCRETE SIDEWALK BY LOT DEVELOPER EXISTING PROPERTY BOUNDARY PROPOSED SURFACE POND (SIZE VARIES) PHASE BOUNDARY EXISTING ASPHALT PAVEMENT SURFACE PROPOSED 6-INCH CONCRETE SIDEWALK FUTURE 6-INCH CONCRETE SIDEWALK BY LOT DEVELOPER 07/26/2024 TEMPORARY SURFACE POND (SIZE VARIES) 5 005