Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
001 - C-001 - COVER
NG NG NG WESTLAKE RD E. V A L L E Y C E N T E R R D IN T E R S T A T E 9 0 H W Y DURANGO LN WHISPER LNHIDDEN VALLEY RDSTUBBS LNRLANE DR FR O N T A G E R D R O Y A L W O L F W A Y NELSON RDFUTURE WESTLAKE RD DAVIS LNN:\6916\003 - TURNROW MASTER PLAN\ACAD\SHEETS\2-MASTER-SITE-PLAN\6916.003 - COVER.DWG PLOTTED BY:MAYA SIMMONS ON Jul/29/2024©This documen t wa s prepar ed by Morrison-Maier le and may conta in confidential or privileged information. Morrison-Maierle, Inc. retains all common law, statutory, and reserved rights including the copyright thereto. Unauthorized use of this document or changes are strictly p r oh ib ite d an d m ay be un l awf u l . engineers surveyors planners scientists MorrisonMaierle 2880 Technology Boulevard West, Bozeman, MT 59718 406.587.0721 www.m-m.net LIBBY KALISPELL BROWNING POLSON CUT BANK SHELBY CONRAD HAVRE MALTA GREAT FALLS GLASGOW WOLF POINT PLENTYWOOD SIDNEY GLENDIVE MILES CITY FORSYTH HARDINBILLINGS ROUNDUP LEWISTOWN HARLOWTON LIVINGSTON WHITE SULPHUR SPRINGS BOZEMAN DILLON ANACONDA HELENA LINCOLN DEER LODGE MISSOULA HAMILTON MASTER SITE PLAN JULY 2024 PROJECT LOCATION PREPARED BY: PROJECT LOCATION SET NO. MORRISON-MAIERLE PROJECT NO. 6916.003 APPROVED BY: APPROVED BY: BLAKE BERNARD VIRGA CAPITAL 211 E. OAK STREET, SUITE 2B BOZEMAN, MT 59715 MATT E. EKSTROM, PE PROJECT MANAGER APPROVED BY: NAME: POSITION: DESIGN DRAWINGS FOR TURNROW SUBDIVISION MASTER SITE PLAN BOZEMAN, MONTANA JULY 2024 LOCATION MAP NOT TO SCALE VICINITY MAP SCALE: 1" = 500' QUALITY ASSURANCE PROJECT MANAGER OFFICE QUALITY ASSURANCE COORDINATOR PEER REVIEWER Q.A. APPROVAL DATE Q.A. PROJECT NUMBER engineers surveyors planners scientists MorrisonMaierle MATT E. EKSTROM JAMES A. ULLMAN JAMES R. NICKELSON 07/24/2024 6916.003-088-000318 SHEET INDEX SHT. NO.DWG. NO.TITLE 01 C-001 COVER 02 C-002 GENERAL NOTES 03 C-003 ABBREVIATIONS & LEGEND 04 C-004 EXISTING SITE FEATURES & TOPOGRAPHY 05 C-005 CONSTRUCTION MANAGEMENT & EROSION SEDIMENT CONTROL PLAN 06 C-006 CONSTRUCTION ROUTE MAP & CONSTRUCTION DEBRIS CONTAINER 07 C-007 SITE MAP INDEX 08 C-201 SE SITE & UTILITY PLAN (1 OF 8) 09 C-202 CS SITE & UTILITY PLAN (2 OF 8) 10 C-203 SW SITE & UTILITY PLAN (3 OF 8) 11 C-204 CE SITE & UTILITY PLAN (4 OF 8) 12 C-205 C SITE & UTILITY PLAN (5 OF 8) 13 C-206 CW SITE & UTILITY PLAN (6 OF 8) 14 C-207 CN SITE & UTILITY PLAN (7 OF 8) 15 C-208 NW SITE & UTILITY PLAN (8 OF 8) 16 C-301 SE GRADING PLAN (1 OF 8) 17 C-302 CS GRADING PLAN (2 OF 8) 18 C-303 SW GRADING PLAN (3 OF 8) 19 C-304 CE GRADING PLAN (4 OF 8) 20 C-305 C GRADING PLAN (5 OF 8) 21 C-306 CW GRADING PLAN (6 OF 8) 22 C-307 CN GRADING PLAN (7 OF 8) 23 C-308 NW GRADING PLAN (8 OF 8) 24 C-1201 ROAD DETAILS 25 C-1202 ROAD DETAILS 26 C-1203 SIDEWALK RAMP DETAILS 27 C-1204 MISCELLANEOUS DETAILS 28 C-1205 MISCELLANEOUS DETAILS 29 C-1206 EROSION CONTROL DETAILS 30 C-1207 STORMTECH DETAILS 31 C-1301 ELECTRICAL NOTES 32 C-1302 LIGHTING CUT SHEETS 33 C-1303 ELECTRICAL SCHEDULES & DETAILS (1 OF 2) 34 C-1304 ELECTRICAL SCHEDULES & DETAILS (2 OF 2) 35 C-1305 STREET LIGHTING PLAN 07/26/2024 CITY OF BOZEMAN LIMITS (TYP.) PHASE 1 BOUNDARY