HomeMy WebLinkAbout030_Concurrent Construction LetterCity of Bozeman Development Review Committee Re: Simkins-Hallin Tract 3-B Site Plan Application #24064 Concurrent Construction Request Please accept this letter as a request for concurrent construction of onsite/offsite public infrastructure for the proposed buildings of the Simkins-Hallin Tract 3-B project as shown on the attached Civil Construction Plans. As soon as possible after Site Plan Approval Northbloc LLC is planning on developing the two buildings proposed on Tract 3-B. To facilitate building permit reviews on these lots, concurrent construction of public and private improvements is requested. By the time of building permit approval, it is very likely that public infrastructure construction will be well underway. Northbloc LLC understands the need for functional infrastructure to support construction activities and commits to the following Concurrent Construction Plan. Wheat Drive will be improved to a gravel surface prior to vertical construction on the lot. Access to the entire site will be closed to the public until the infrastructure is complete. Public infrastructure will be complete and accepted by the city prior to occupancy of any structure on the concurrent construction lot. The concurrent construction request will be supported by the following project specific conditions and standard conditions per UDC 38.270.30 D and stipulated in an Improvements Agreement. 1. The project (site plans) will be under control of a single entity, Northbloc LLC, with a single general contractor. There will be no third-party builders until public infrastructure is complete and accepted by the City. 2. Infrastructure plans will be approved and financially guaranteed prior to the issuance of any concurrent construction Building Permit issuance. a. The offsite infrastructure plans for Wheat Drive are prepared by Allied Engineering b. The onsite infrastructure plans for Tract 3-B are prepared by Sanderson Stewart 3. Wheat Drive will be improved to gravel surfacing prior to vertical construction on the concurrent construction lot. Access to the entire site will be closed to the public until infrastructure is complete. Infrastructure improvements will be complete and accepted by the city prior to occupancy of any structure on the concurrent construction lots. 4. Northbloc LLC will provide insurance, risk acknowledgement, and indemnification in a form acceptable to the city prior to Building Permit issuance. Please let us know if there are any additional conditions required to enable concurrent public infrastructure and industrial building construction. Sincerely, Brodey Simkins President and Manager X Brodey Simkins President and Manager Brodey Simkins (Jun 14, 2024 14:07 MDT)