OVERVIEW NARRATIVE
The purpose of this maintenance plan is to outline the necessary details related to maintaining
the integrity of the gravel surfaces at Simkins-Hallin. Gravel surfacing has been proposed
for the southwest corner of Simkins-Hallin Tract 3-13 site. Proposed Gravel surfaces will be
placed over the top of a geotextile throughout the project to prevent the migration and
mixing of soil and gravel surfaces leading to a longer last surface.
Specific site information and criteria are described below:
I. Inspection and Assessment of Gravel Surfaces
• Inspections of gravel surfaces will be conducted seasonally to assess for potholes,
erosion, dust build-up, and drainage problems.
II. Maintenance, and Replacement Schedule
• Routine maintenance will be conducted seasonally on all gravel surfaces located
within the Simkins-Hallin site. Routine maintenance will include regrading
surfaces to ensure integrity of the surface and remove any seasonal wear.
Additionally, the surface will be rolled to maintain proper compaction.
• Moisture management will be conducted during the summer if during surface
inspections it is noted that there is a build up of dust and fine particles in the
surface. Moisture will be controlled with the spraying of water along with rolling
the surface of the gravel.
GRAVEL MAINTENANCE PLAN 1/31/24 PROJECT NO.21363.01
tis
I!75 46
y�H � boa
III. Responsible Party
Simkins-Hallin
Simkins-Hallin will be responsible for the inspection, maintenance, and replacement of all
gravel surfaces.
I agree to the above inspection, maintenance, and replacement schedule detailed above.
Signature: 'L