Loading...
HomeMy WebLinkAbout008_GravelMaintenancePlan DNS-H4� EST'JV, "75- January 2024 Project No. 21363.01 GRAVEL MAINTENANCE PLAN FOR SIMKINS-HALLIN BOZEMAN, MONTANA OVERVIEW NARRATIVE The purpose of this maintenance plan is to outline the necessary details related to maintaining the integrity of the gravel surfaces at Simkins-Hallin. Gravel surfacing has been proposed for the southwest corner of Simkins-Hallin Tract 3-13 site. Proposed Gravel surfaces will be placed over the top of a geotextile throughout the project to prevent the migration and mixing of soil and gravel surfaces leading to a longer last surface. Specific site information and criteria are described below: I. Inspection and Assessment of Gravel Surfaces • Inspections of gravel surfaces will be conducted seasonally to assess for potholes, erosion, dust build-up, and drainage problems. II. Maintenance, and Replacement Schedule • Routine maintenance will be conducted seasonally on all gravel surfaces located within the Simkins-Hallin site. Routine maintenance will include regrading surfaces to ensure integrity of the surface and remove any seasonal wear. Additionally, the surface will be rolled to maintain proper compaction. • Moisture management will be conducted during the summer if during surface inspections it is noted that there is a build up of dust and fine particles in the surface. Moisture will be controlled with the spraying of water along with rolling the surface of the gravel. GRAVEL MAINTENANCE PLAN 1/31/24 PROJECT NO.21363.01 tis I!75 46 y�H � boa III. Responsible Party Simkins-Hallin Simkins-Hallin will be responsible for the inspection, maintenance, and replacement of all gravel surfaces. I agree to the above inspection, maintenance, and replacement schedule detailed above. Signature: 'L Si tins ; Rin Representative 1 GRAVEL MAINTENANCE PLAN 1/31/24 PROJECT NO.21363.01