Loading...
HomeMy WebLinkAbout047_A205_ExteriorElevationsGENERAL SHEET NOTES A. GENERAL ELEVATION NOTES HEREFIRST FLOOR 100' - 0" MEZZANINE 112' - 0" 1234567 STRAIGHT SIDEWALL COLUMN(S) 115' - 0" CLEAR HEIGHT AT HAUNCH 120' - 0" T.O. RIDGE +/- 126' - 5" MP1 MP2 MP38' - 4 1/2"6' - 0"12' - 0"KALWALL 1" / 12"5' - 0"10' - 0"5' - 0"5' - 0"10' - 0"5' - 0"5' - 0"10' - 0"5' - 0"5' - 0"10' - 0"5' - 0"5' - 0"10' - 0"5' - 0" 13' - 9"42' - 7"43' - 8"20' - 0" A B AAAAAAAAA B 11' - 0"3' - 0"20' - 0" TOTAL BUILDING HEIGHT26' - 5"MP1 MP2 MP1 MP2 FIRST FLOOR 100' - 0" MEZZANINE 112' - 0" 1 2 3 4 5 6 7 STRAIGHT SIDEWALL COLUMN(S) 115' - 0" CLEAR HEIGHT AT HAUNCH 120' - 0" T.O. RIDGE +/- 126' - 5" MP2 MP1 MP3 WALL SIGNAGE = 86.5 SQFTSURFACE APPLIED BUILDING NUMBER1" / 12"3' - 9"45' - 0"11' - 3" 15' - 0"5' - 0"15' - 0"5' - 0"15' - 0"5' - 0"15' - 0"5' - 0"15' - 0"5' - 0"15' - 0"5' - 0" AAAAAA 14' - 0" TOTAL BUILDING HEIGHT26' - 5"MP1 MP2 MP1 MP2 FIRST FLOOR 100' - 0" MEZZANINE 112' - 0" AF STRAIGHT SIDEWALL COLUMN(S) 115' - 0" CLEAR HEIGHT AT HAUNCH 120' - 0" BDEC T.O. RIDGE +/- 126' - 5" MP3 MP2 MP1 WALL SIGNAGE= 86.5 SQFT KALWALL 1" 12"1" 12" 21' - 9"3' - 3"10' - 0" ALIGN AA 101A 101C101D MP2 MP1 FIRST FLOOR 100' - 0" MEZZANINE 112' - 0" A F STRAIGHT SIDEWALL COLUMN(S) 115' - 0" CLEAR HEIGHT AT HAUNCH 120' - 0" B D EC T.O. RIDGE +/- 126' - 5"1" 12" 1" 12" 15' - 0"20' - 0"20' - 0"25' - 0"6' - 0"4' - 9"7' - 3"AAA MP1 MP2 MP1 MP2 W H E A T D RIV E KEYPLAN PLAN NORTH MATERIALS MP1: CORRUGATED METAL SIDING, 24 GA MIN. FINISH-PRE WEATHERED GALVALUME MP2: RIBBED METAL SIDING, 24 GA MIN. FINISH-PRE-WEATHERED GALVALUME INTENDED EFFECT: MP3: WIDE PROFILE METAL SIDING, 24 GA MIN. FINISH-PAINTED BY MANF. COLOR-MATTE BLACK TYPE 01 - FIXEDVARIESRE. SCHED.RE. SCHED. 21' - 9"6' - 0"19' - 7 1/2"6' - 0"22.5 SQFT / 1949 SQFT = 0.011 (1.1%) Date Project Number Sheet Name ALL DRAWN AND WRITTEN INFORMATION APPEARING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE REVISIONS ALL DRAWN AND WRITTEN INFORMATION APPEARING ON THIS DRAWING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE.MARK DESCRIPTION DATE 6/13/2024 9:24:04 AMA 205 EXTERIOR ELEVATIONSSIMKINS LUMBER MECHANIC SHOP04.22.2024 23009SIMKINS NORTH PARK TRACT 3-BWHEAT DRIVEBOZEMAN, MT 59715CONSTRUCTION DOCUMENTS 1/8" = 1'-0"A 205 1 NORTH ELEVATION Copy 1 1/8" = 1'-0"A 205 2 SOUTH ELEVATION Copy 1 1/8" = 1'-0"A 205 3 EAST ELEVATION (WHEAT FRONTAGE) Copy 1 1/8" = 1'-0"A 205 4 WEST ELEVATION Copy 1 WINDOW SCHEDULE TAG WINDOW TYPE COUNT FRAME FINISH DIMENSIONS GLAZING TYPE COMMENTSHEIGHTWIDTH A 01 21 BLACK 4' - 0" 2' - 0" EXTERIOR B 01 2 BLACK 4' - 0" 4' - 0" EXTERIOR WINDOW TYPES KALWALL - EAST ELEVATION Copy 1 KALWALL - NORTH ELEVATION Copy 1 SIGNAGE CALC: 250 SQFT MAX PER LOT 1 Site Plan Submittal 06.14.24