GENERAL SHEET NOTES
A. PROVIDE FIRE EXTINGUISHERS AND FIRE EXTINGUISHER
CABINETS AS SHOWN / SPECIFIED. COORDINATE FINAL
LOCATIONS WITH FIRE MARSHALL.
B. SEE A003 FOR ALL PARTITION AND WALL ASSEMBLY TYPES.
ALL FRAMING AND FINISHES OF INTERIOR WALLS TO EXTEND
TO THE UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED
OTHERWISE.
C. SEE A001 FOR DETAILED INFORMATION ON DIMENSIONING
D. DASHED BOXES AND CIRCLES SHOW CLEAR FLOOR AREA.
DASHED AREAS ARE FOR REFERENCE AND NOT ALL ARE
SHOWN
E. CONTRACTOR TO COORDINATE ADDITIONAL FRAMING WITH
EXTERIOR CLADDING ATTACHMENTS AND FASTENERS
F. FOR DOOR OPENING DIMENSIONS SEE DOOR SCHEDULE IN
A600 SHEETS
G. SEE A600 SHEETS FOR FINISH SCHEDULE
H. ABBREVIATIONS: REFERENCED FROM THE CONSTRUCTION
SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM
TERMS AND ABBREVIATIONS MODULE. REFER TO SHEET
A001 - ARCHITECTUAL GENERAL NOTES.
I. CONTRACTOR TO FEILD VERIFY ALL FOUNDATION AND
FOOTING HEIGHTS.
J. CONTRACTOR TO COORDINATE ALL SITE DRAINAGE.
K. ALL STRUCTURAL ELEMENTS ARE TO BE REVIEWED BY A
LICENSED STRUCTURAL ENGINEER.
L. EXTERIOR BUILIDNG DIMENSIONS ARE TO GRID CENTERLINE,
EXTERIOR F.O. SHEATHING/OUTSIDE FACE OF FOUNDATION.
M. DIMENSIONS ARE TO GRID CENTERLINE, FACE OF CONCRETE
WALL OR FACE OF STUD AS APPLICABLE, UNLESS NOTED
OTHERWISE
N. ALL INTERIOR DOORS ARE 4 1/2" AWAY FROM ADJACENT
PERPINDICULAR STUD , UNLESS SPECIFICALLY DIMENSIONED.
O. CONTRACTOR TO COORDINATE ALL HVAC. COORDINATE
WITH ARCHITECT FOR ANY FLOOR PLAN CHANGES.
P. CONTRACTOR TO COORDINATE ALL ELECTRICAL
REQUIREMENTS.
Q. CONTRACTOR TO COORDINATE ALL STRUCTURAL SHEAR
REQUIREMENTS W/ A LICENSED STRUCTURAL ENGINEER.
R. REFER TO ARCHITECTURAL SHEET SERIES 200 EXTERIOR
ELEVATIONS FOR THE IDENTIFICATION OF VARIOUS
EXTERIOR WALL MATERIAL TYPES, LOCATIONS, AND
EXTENTS.
S. COORDINATE T.O. FOUNDATION WALL AND FINISH FLOORING
WITH NEW GRADE.
T. SILL SEAL TO BE PROVIDED BETWEEN ALL WOOD FRAMING IN
CONTACT WITH CONCRETE.
A201
3
1
1
A A
2
2
3
3
4
4
5
5
6
6
7
7
F F
A201
1
A201
4
B B
D D
E E
C C
1" / 12"1" / 12"120' - 0"80' - 0"120' - 0"80' - 0"MTL GUTTER, BY PEMB
MTL GUTTER, BY PEMB
A 205
3
A 205
1
A 205
4 1" / 12"MECH EQUIPMENT, REF MEP
Date
Project Number
Sheet Name
ALL DRAWN AND WRITTEN INFORMATION
APPEARING SHALL NOT BE DUPLICATED,
DISCLOSED OR OTHERWISE USED
WITHOUT THE WRITTEN CONSENT OF
45 ARCHITECTURE
REVISIONS
ALL DRAWN AND WRITTEN INFORMATION APPEARING ON THIS DRAWING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE.MARK DESCRIPTION DATE
6/13/2024 9:24:02 AMA 202
ROOF PLANSIMKINS LUMBER MECHANIC SHOP04.22.2024
23009SIMKINS NORTH PARK TRACT 3-BWHEAT DRIVEBOZEMAN, MT 59715CONSTRUCTION DOCUMENTS
1/8" = 1'-0"A 202
1 ROOF PLAN - SP
PLAN NORTH
1 Site Plan Submittal 06.14.24