Loading...
HomeMy WebLinkAbout046_A202_RoofPlanWH E A T D RIV E KEYPLAN PLAN NORTH GENERAL SHEET NOTES A. PROVIDE FIRE EXTINGUISHERS AND FIRE EXTINGUISHER CABINETS AS SHOWN / SPECIFIED. COORDINATE FINAL LOCATIONS WITH FIRE MARSHALL. B. SEE A003 FOR ALL PARTITION AND WALL ASSEMBLY TYPES. ALL FRAMING AND FINISHES OF INTERIOR WALLS TO EXTEND TO THE UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED OTHERWISE. C. SEE A001 FOR DETAILED INFORMATION ON DIMENSIONING D. DASHED BOXES AND CIRCLES SHOW CLEAR FLOOR AREA. DASHED AREAS ARE FOR REFERENCE AND NOT ALL ARE SHOWN E. CONTRACTOR TO COORDINATE ADDITIONAL FRAMING WITH EXTERIOR CLADDING ATTACHMENTS AND FASTENERS F. FOR DOOR OPENING DIMENSIONS SEE DOOR SCHEDULE IN A600 SHEETS G. SEE A600 SHEETS FOR FINISH SCHEDULE H. ABBREVIATIONS: REFERENCED FROM THE CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM TERMS AND ABBREVIATIONS MODULE. REFER TO SHEET A001 - ARCHITECTUAL GENERAL NOTES. I. CONTRACTOR TO FEILD VERIFY ALL FOUNDATION AND FOOTING HEIGHTS. J. CONTRACTOR TO COORDINATE ALL SITE DRAINAGE. K. ALL STRUCTURAL ELEMENTS ARE TO BE REVIEWED BY A LICENSED STRUCTURAL ENGINEER. L. EXTERIOR BUILIDNG DIMENSIONS ARE TO GRID CENTERLINE, EXTERIOR F.O. SHEATHING/OUTSIDE FACE OF FOUNDATION. M. DIMENSIONS ARE TO GRID CENTERLINE, FACE OF CONCRETE WALL OR FACE OF STUD AS APPLICABLE, UNLESS NOTED OTHERWISE N. ALL INTERIOR DOORS ARE 4 1/2" AWAY FROM ADJACENT PERPINDICULAR STUD , UNLESS SPECIFICALLY DIMENSIONED. O. CONTRACTOR TO COORDINATE ALL HVAC. COORDINATE WITH ARCHITECT FOR ANY FLOOR PLAN CHANGES. P. CONTRACTOR TO COORDINATE ALL ELECTRICAL REQUIREMENTS. Q. CONTRACTOR TO COORDINATE ALL STRUCTURAL SHEAR REQUIREMENTS W/ A LICENSED STRUCTURAL ENGINEER. R. REFER TO ARCHITECTURAL SHEET SERIES 200 EXTERIOR ELEVATIONS FOR THE IDENTIFICATION OF VARIOUS EXTERIOR WALL MATERIAL TYPES, LOCATIONS, AND EXTENTS. S. COORDINATE T.O. FOUNDATION WALL AND FINISH FLOORING WITH NEW GRADE. T. SILL SEAL TO BE PROVIDED BETWEEN ALL WOOD FRAMING IN CONTACT WITH CONCRETE. A201 3 1 1 A A 2 2 3 3 4 4 5 5 6 6 7 7 F F A201 1 A201 4 B B D D E E C C 1" / 12"1" / 12"120' - 0"80' - 0"120' - 0"80' - 0"MTL GUTTER, BY PEMB MTL GUTTER, BY PEMB A 205 3 A 205 1 A 205 4 1" / 12"MECH EQUIPMENT, REF MEP Date Project Number Sheet Name ALL DRAWN AND WRITTEN INFORMATION APPEARING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE REVISIONS ALL DRAWN AND WRITTEN INFORMATION APPEARING ON THIS DRAWING SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF 45 ARCHITECTURE.MARK DESCRIPTION DATE 6/13/2024 9:24:02 AMA 202 ROOF PLANSIMKINS LUMBER MECHANIC SHOP04.22.2024 23009SIMKINS NORTH PARK TRACT 3-BWHEAT DRIVEBOZEMAN, MT 59715CONSTRUCTION DOCUMENTS 1/8" = 1'-0"A 202 1 ROOF PLAN - SP PLAN NORTH 1 Site Plan Submittal 06.14.24