HomeMy WebLinkAbout031_L2.3_LandscapeDetails FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVELANDSCAPE DETAILSSIMKINS-HALLIN TRACT 3-BNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTL2.3 TP21363_01_LS_DETAILS_T3-B.DWGCS/KA01/31/24SITE PLAN SUBMITTAL06/14/24-----SITE PLAN SUBMITTAL-------21363.01 VARIES - SEE SCHEDULE
SEE GATE SCHEDULE FOR WIDTH SEE GATE SCHEDULE FOR HEIGHTCLCL
FENCE SECTION/ ELEVATION
TOP HINGE (180° SWING) TYP.
CHAIN LINK FABRIC
4" OD TERMINAL
POST (TYP)
BOTTOM HINGE (180° SWING) TYP.
FABRIC BAND
CONCRETE FOOTING. SEE GATE
SCHEDULE SHEET L1.1. FOR
DIAMETER AND DEPTH.
VARIOUS GROUND CONDITIONS SEE
LANDSCAPE HARDSCAPE PLAN
GATE- SINGLE SWING
N.T.S.
LOCKABLE GATE
LATCH
VARIES - GATE SCHEDULE1
CONCRETE FOOTING
FINISH GRADE
BOTTOM RAIL
FENCE FABRIC. 9 GA. 2" MESH
POWDER COATED. INSTALL FABRIC
ON 'EXTERIOR' OF FENCING
TENSION BAR
MIDRAIL
TOP RAIL CONTINUOUS
1-5/8" POWDER COATED
RAIL END BRACKET
END POST TOP
8'-0"MIN 1/2 HEIGHT OF
FOOTINGMINIMUM 1/3 HEIGHT OF THE FENCEFENCE TOPPER
FABRIC 'KNUCKLED' AND INSTALLED NO LOWER
THAN 1/2 WAY UP TOP RAIL FOR SAFETY PURPOSE.
FENCE SECTION & FOOTING FENCE SECTION/ELEVATION
CHAIN LINK FENCE 3 RAIL
N.T.S.
NOTES:
1.ADD SLATS TO SECTION FENCING WHERE ADDED
SCREENING IS REQUIRED.
2.INSTALL FENCE PER MANUFACTURERS INSTRUCTIONS.
2