HomeMy WebLinkAbout030_L2.2_LandscapeDetails FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVELANDSCAPE DETAILSSIMKINS-HALLIN TRACT 3-BNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTL2.2 TP21363_01_LS_DETAILS_T3-B.DWGCS/KA01/31/24SITE PLAN SUBMITTAL06/14/24-----SITE PLAN SUBMITTAL-------21363.0132" LENGTH NON-ABRASIVE RUBBER
TIES
(2)3" DIA LODGE POLE PINE STAKES 1-1/2'
FROM TRUNK. STAKE LOCATION SHALL
NOT INTERFERE WITH PERMANENT
BRANCHES
3" DEPTH MULCH
FINISH GRADE
BOTTOM OF ROOT BALL RESTS
ON EXT OR RECOMPACTED SOIL
EXISTING SOIL
TOP OF ROOT FLARE 2" ABOVE EXT
GRADE. NO SOIL ON ROOT FLARE
LOOSENED SOIL. DIG AND TURN
THE SOIL TO REDUCE
COMPACTION TO THE AREA TO
DEPTH OF ROOT BALL.
3 X DIA ROOT BALL MINNOTES:
1.REMOVE NURSERY STAKES.
2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING.
3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL.
4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE
TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER
AROUND ROOT BALL TO SETTLE THE SOIL.
5.BACKFILL WITH AMENDED SOIL.
6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON.
7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING
ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.
8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION.
RIPARIAN TREE POCKET PLANTING
N.T.S.1
NOTES:
1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE
REJECTED. CONTAINER REMOVAL WILL NOT BE AN EXCUSE FOR
DAMAGED ROOT BALLS.
2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING,
OR OTHER SURFACE.
3.PRUNE OUT ALL DAMAGED OR DEAD WOOD.
4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY.
REJECTED MATERIALS TO BE IMMEDIATELY RETURNED TO SOURCE.
6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN
DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR
CONSTRUCTION DEBRIS.
TOP OF ROOT BALL
SHALL BE 1-2" ABOVE
SURROUNDING GRADE
3" DEPTH MULCH, KEEP
MULCH AWAY FROM TRUNK
REMOVE CONTAINER,
LIGHTLY SCARIFY
ROOTS
BACKFILL WITH 75%
NATIVE SOIL, 25%
COMPOST
RIPARIAN SHRUB POCKET PLANTING
N.T.S.2
CURB
18" DEEP LINEAR ROOT BARRIER
TAMP SOIL ADJACENT TO ROOT
BARRIERS TO STABILIZE THEM
PLAN
SECTION
TOP OF ROOT BARRIER 1"
ABOVE FINISHED GRADE
CURB
18" DEEP LINEAR ROOT BARRIER
FINISHED GRADE 2" BELOW
ADJACENT PAVEMENT
6" COMPACTED AGGREGATE
NOTES:
1.ROOT BARRIERS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS.
2.ROOT BARRIERS SHALL BE INSTALLED WHEN ROOT BALL IS LOCATED WITHIN 8' OF PAVEMENT.
3.SCARIFY SUBGRADE 6" PRIOR TO TOPSOIL PLACEMENT, REMOVE ALL DEBRIS LARGER THAN 1/2" IN SIZE.18"TREE PLANTING - PARKING LOT ISLAND
N.T.S.
EXISTING SOIL
EXISTING SOIL
6" COMPACTED AGGREGATE
3" DEPTH MULCH
3"MAXTOPSOIL
3