Loading...
HomeMy WebLinkAbout030_L2.2_LandscapeDetails FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVELANDSCAPE DETAILSSIMKINS-HALLIN TRACT 3-BNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTL2.2 TP21363_01_LS_DETAILS_T3-B.DWGCS/KA01/31/24SITE PLAN SUBMITTAL06/14/24-----SITE PLAN SUBMITTAL-------21363.0132" LENGTH NON-ABRASIVE RUBBER TIES (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES 3" DEPTH MULCH FINISH GRADE BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXISTING SOIL TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. 3 X DIA ROOT BALL MINNOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL. 4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 5.BACKFILL WITH AMENDED SOIL. 6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. RIPARIAN TREE POCKET PLANTING N.T.S.1 NOTES: 1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE REJECTED. CONTAINER REMOVAL WILL NOT BE AN EXCUSE FOR DAMAGED ROOT BALLS. 2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING, OR OTHER SURFACE. 3.PRUNE OUT ALL DAMAGED OR DEAD WOOD. 4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY. REJECTED MATERIALS TO BE IMMEDIATELY RETURNED TO SOURCE. 6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. TOP OF ROOT BALL SHALL BE 1-2" ABOVE SURROUNDING GRADE 3" DEPTH MULCH, KEEP MULCH AWAY FROM TRUNK REMOVE CONTAINER, LIGHTLY SCARIFY ROOTS BACKFILL WITH 75% NATIVE SOIL, 25% COMPOST RIPARIAN SHRUB POCKET PLANTING N.T.S.2 CURB 18" DEEP LINEAR ROOT BARRIER TAMP SOIL ADJACENT TO ROOT BARRIERS TO STABILIZE THEM PLAN SECTION TOP OF ROOT BARRIER 1" ABOVE FINISHED GRADE CURB 18" DEEP LINEAR ROOT BARRIER FINISHED GRADE 2" BELOW ADJACENT PAVEMENT 6" COMPACTED AGGREGATE NOTES: 1.ROOT BARRIERS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS. 2.ROOT BARRIERS SHALL BE INSTALLED WHEN ROOT BALL IS LOCATED WITHIN 8' OF PAVEMENT. 3.SCARIFY SUBGRADE 6" PRIOR TO TOPSOIL PLACEMENT, REMOVE ALL DEBRIS LARGER THAN 1/2" IN SIZE.18"TREE PLANTING - PARKING LOT ISLAND N.T.S. EXISTING SOIL EXISTING SOIL 6" COMPACTED AGGREGATE 3" DEPTH MULCH 3"MAXTOPSOIL 3