Loading...
HomeMy WebLinkAbout028_L1.5_LandscapePlanEastMATCHLINE - SEE SHEET L1.4PHILLIPS 66EASEMENTUTILITYEASEMENT5 L2.1 DECIDUOUS TREE 6 L2.1 CONIFEROUS TREE 3 L2.1 EDGING DETAIL 7 L2.1 ROCK MULCH 2 L2.1 SEEDING 3 L2.2 CHAIN LINK FENCE 3 RAIL 1 L2.1 SHRUB PLANTING LIMIT OF WORK LI M I T O F W O R K W H E A T D R I V E SITE VISION TRIANGLE SHALLOW ROOT PLANTS TO PROVIDE SCREENING IN EASEMENT (6) CC (5) SA2 (5) CC (7) SA2 (5) CC (5) SA2 (7) SA2 (1) PB2(3) PE (5) PT2 (1) UO (1) GS (1) TB (1) TB (1) UO (1) UO (1) GS (1) TB (1) GS (1) GS UULC  FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVELANDSCAPE PLAN - EASTSIMKINS-HALLIN TRACT 3-BNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTL1.5 TP21363_01_LS_PROD_T3-B.DWGCS/KA01/31/24SITE PLAN SUBMITTAL06/14/24-----SITE PLAN SUBMITTAL-------21363.01LANDSCAPE PLAN - EAST 0 20 SCALE: 1" = 20' 401020