Loading...
HomeMy WebLinkAbout004_C3.1_OverallSitePlanCP#1 CP#2 CP#3 CP#4 BUILDING GRIDLINE SETTING OUT POINTS Point # 1 2 3 4 Northing 535531.33 535416.44 535454.97 535371.13 Easting 1571537.86 1571676.43 1571747.46 1571864.80 Elevation 4692.00 4692.00 4692.00 4692.00 Description MILLWORK GRIDLINE 1/A INTERSECTION MILLWORK GRIDLINE 1/L INTERSECTION MECHANIC GRIDLINE 1/A INTERSECTION MECHANIC GRIDLINE 7/F INTERSECTION FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVEOVERALL SITE AND UTILITY PLANSIMKINS-HALLIN TRACT 3-BNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC3.1 TP21363_01_OVERALL_SITE_PROD.DWGCS/KA01/31/24SITE PLAN SUBMITTAL06/14/24-----SITE PLAN SUBMITTAL-------21363.01 NORTH 0 40 SCALE: 1" = 40' 802040 GENERAL UTILITY NOTES: 1.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® ENHANCED POLYETHYLENE ENCASEMENT. 2.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. PHILLIPS 66 PIPELINE NOTES: 1.WARNING HIGH PRESSURE PIPELINE(S). NO EXCAVATION OR CONSTRUCTION IN THIS AREA WITHOUT ONE-CALL AND WITHOUT CONTACTING PHILLIPS 66 PIPELINE LLC (P66PL) AT (406) 587-7060. 2.CONTRACTOR TO CONTACT YELLOWSTONE PIPELINE REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO ANY WORK NEAR OR WITHIN THE EASEMENT. YELLOWSTONE PIPELINE REPRESENTATIVE MUST BE PRESENT ON-SITE DURING ALL EXCAVATION ACTIVITIES WITHIN THE EASEMENT 3.PROPOSED BUILDING MUST BE 50' MINIMUM FROM EXISTING YELLOWSTONE PIPELINE. 4.DURING INSTALLATION OF UNDERGROUND PIPELINES OR FACILITIES WITH DRILLING OR BORING TECHNOLOGY, AN AUTHORIZED PERMITTOR REPRESENTATIVE SHALL HAVE THE RIGHT TO EVALUATE AND APPROVE THE DRILLING PLAN. FOR A DRILLED CROSSING, PROVIDE AT LEAST 10 FT OF VERTICAL SEPARATION FOR CROSSINGS AND 15 FT FOR PARALLEL BORES BETWEEN NEW AND BORE AND EXISTING PIPELINES. IN ADDITION, PHILLIPS 66 MAY REQUIRE PERMITTEE TO EXCAVATE AN OBSERVATION HOLE PARALLEL TO AND APPROXIMATELY 5FT ON ONE OR BOTH SIDES OF PERMITTOR'S PIPELINE(S) EXTENDING AT LEAST 1 FT BELOW THE PIPELINE OR BORE, WHICHEVER IS SHALLOWEST. THE OBSERVATION HOLES(S) ARE TO BE MONITORED DURING BOTH THE PILOT BORE AND BACK REAMING. 5.PERMITTEE WILL REMOVE CUTTING TEETH FROM EXCAVATION EQUIPMENT BUCKET WHEN WITHIN 10 FEET OF PERMITTOR'S PIPELINE(S). MECHANICAL EXCAVATION WILL CEASE, AND ONLY HAND EXCAVATION SHALL BE PERMITTED, WITHIN 18 INCHES OF A CRUDE OIL OR PRODUCT PIPELINE AND WITHIN 24 INCHES OF A LINE CONTAINING HIGHLY VOLATILE LIQUIDS (HVL). EXCAVATION WILL NOT BE ALLOWED TO CONTINUE UNTIL THE PERMITTOR'S PIPELINE, VALVES, AND/OR FITTINGS TOP AND SIDES ARE VISIBLE TO THE SPOTTER. HOWEVER, PROCEED WITH EXTREME CAUTION WHEN WITHIN THREE (3) FEET OF THE PIPE.P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\21363_01_OVERALL_SITE_PROD.dwg, C3.1, 6/13/2024 8:37:12 AM, cschreiner, 1:1