Loading...
HomeMy WebLinkAboutResolutions 5476 - Authorizing Gauranteed Maximum Price Amendment 4 and Change Order 2 for the Public Library Renovation ProjectVersion April 2020 RESOLUTION 5476 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, WHEREAS, the City Commission did, on December 6, 2022, authorize Guaranteed Maximum Price (GMP) Amendment #3 for Construction of the Bozeman Public Library Renovation Project with Martel Construction, Inc.; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations for modification of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations and modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alternates to GMP Amendment #4 for Construction of the Bozeman Public Library Renovation Project, as contained in Prime Change Order #2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature., to wit: PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 7th day of February 2023. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: DocuSign Envelope ID: B573184A-3D66-4152-97AA-92F87D9818B6 Version April 2020 ___________________________________ MIKE MAAS City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney DocuSign Envelope ID: B573184A-3D66-4152-97AA-92F87D9818B6 GUARANTEED MAXIMUM PRICE AMENDMENT (GMP) NO. 4 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Article 4.5 of the Preconstruction Services Conditions Agreement between Owner and Construction Manager this amendment dated the 6th day of December 2022, between City of Bozeman (“Owner”) and Martel Construction, Inc. (“Contractor”) for the Bozeman Public Library, hereby establishes a Guaranteed Maximum Price and Contract Time for the portion of the Project as set forth below: GUARANTEED MAXIMUM PRICE FOR BOZEMAN PUBLIC LIBRARY The Construction Manager’s Guaranteed Maximum Price (GMP) for the Work, including the Cost of the Work and the Construction Manager’s Fee is as follows: Base Bid General Requirements $234,376.00 Existing Conditions $44,768.00 Concrete $11,044.00 Masonry $19,500.00 Steel $50,401.00 Wood & Plastics $553,636.00 Thermal & Moisture Protection $47,252.00 Doors & Windows $358,721.00 Finishes $594,472.00 Specialties $2,202.00 Equipment $28,033.00 Furnishings $57,811.00 Fire Suppression $41,558.00 Plumbing $67,671.00 HVAC $110,350.00 Electrical $941,327.00 Electrical Allowance $16,904.00 Communications $38,426.00 Site Improvements $3,034.00 Site Specific Requirements $152,990.00 Audio/Visual $226,898.00 Base Bid Subtotal $3,601,374.00 General Liability Insurance $33,041.00 Gross Receipts Tax $3,641.00 Builders Risk $13,365.00 Bond $25,244.00 DocuSign Envelope ID: 16CD1129-9063-46E3-8DD9-6A72E5A79ECFDocuSign Envelope ID: B573184A-3D66-4152-97AA-92F87D9818B6 Construction Fee $176,448.00 Construction Contingency $102,784.00 Base Bid Total $354,523.00 Pre-Construction Services Total $21,560.00 TOTAL GUARANTEED MAXIMUM PRICE $3,977,457.00 CONTRACT TIME The date of Substantial Completion for the Work outlined above is: 12 months from Notice to Proceed OWNER: CONTRACTOR: City of Bozeman Martel Construction, Inc. 121 N. Rouse Ave. 1203 S. Church Ave. Bozeman, MT 59715 Bozeman, MT 59715 By:__________________________ By: __________________________ Jeff Mihelich, City Manager Travis Kabalin, Vice President DocuSign Envelope ID: 16CD1129-9063-46E3-8DD9-6A72E5A79ECFDocuSign Envelope ID: B573184A-3D66-4152-97AA-92F87D9818B6